JOIST SPECIAL INSPECTIONS.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This file is a technical specification table for special inspections of open-web steel joists and joist girders, extracted from building code standards (Table 1705.2.4). The document outlines inspection requirements for the installation of open-web steel joists and joist girders, specifying which inspections must be continuous versus periodic in nature. For end connections involving welding or bolted assemblies, continuous special inspections are required and must comply with SJI (Steel Joist Institute) specifications listed in Section 2207.1. Standard bridging installations also require continuous special inspections per SJI specifications, while bridging that deviates from standard SJI specifications requires periodic special inspections instead of continuous oversight.

This appears to be a reference standard document rather than a solicitation requirement template, providing regulatory guidance on inspection protocols for structural steel joist installations. The specifications reference applicable SJI standards and cross-reference Section 1705.13 where applicable. This type of technical specification would typically be incorporated into contract documents as a compliance requirement for construction or installation projects involving open-web steel joists and joist girders.

View the file

Other files

File Type Posted
Solicitation - FA813727R0002.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
250063_ATT 3_RMDF.pdf PDF
23 05 15.pdf PDF
23 09 13.pdf PDF
09 90 00.pdf PDF
26 20 00.pdf PDF
08 51 23.pdf PDF
07 92 00.pdf PDF
07 14 00.pdf PDF
08 71 00.pdf PDF
23 05 93.pdf PDF
07 84 00.pdf PDF
03 01 00.pdf PDF
05 05 23.16.pdf PDF
00 70 00.pdf PDF
01 78 23.pdf PDF
UMRL.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
tinkerafb_INRMP.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
dafman91-203.pdf PDF
dafi91-202.pdf PDF
dafi13-213.pdf PDF
afman40-201.pdf PDF
afman48-148.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
tinkerafbi21-100.pdf PDF
007100_Attch1_Airfield Construction Waiver.pdf PDF
007000_Attch1_TAFB Outage Request Form.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
250063_ATT 11_Drawings.pdf PDF
DESV_Submittal.pdf PDF
z415-bz1.pdf PDF
4500-S.pdf PDF
4500-CIVIL.pdf PDF
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

TABLE 1705.2.4 - REQUIRED SPECIAL INSPECTIONS OF OPEN-WEB STEEL JOISTS AND JOIST GIRDERS
TYPECONTINUOUS SPECIAL INSPECTIONSPERIODIC SPECIAL INSPECTIONSREFERENCE STANDARD*
1. INSTALLATION OF OPEN-WEB STEEL JOISTS AND JOIST GIRDERS
A. END CONNECTIONS- WELDING OR BOLTED-XSJI SPECIFICATIONS LISTED IN SECTION 2207.1

B. BRIDGING - HORIZONTAL OR DIAGONAL - - -

1. STANDARD BRIDGING - X SJI SPECIFICATIONS LISTED IN SECTION 2207.1

2. BRIDGING THAT DIFFERS FROM THE SJI SPECIFICATIONS LISTED IN SECTION 2207.1 - X -

*WHERE APPLICABLE, SEE SECTION 1705.13

File details come from the government source that posted it. Updated .