SECTION 26 05 73 - POWER SYSTEM STUDIES

This is a technical specification document for power system studies required at a federal facility. The contractor must furnish short-circuit, protective device coordination, and arc flash hazard analysis studies reflecting the as-built conditions of an installation. Studies must be completed in EasyPower® software and comply with Tinker Air Force Base Electrical Standards (January 2024). The specification mandates that a System Analyzer (registered professional electrical engineer with minimum three years of power system studies experience) perform the studies, while a System Verifier may inspect equipment and place hazard labels. Government approval is required for submittals designated with "G" classification, including Field Examination Plans, Arc Flash Label Formats, Model Files, Load Flow Studies, Fault Current Studies, System Coordination Studies, and Arc Flash Hazard Studies.

The execution requirements include pre- and post-study field inspections with documented examination plans, adherence to safety protocols for energized equipment, and application of arc flash warning labels per UFC 3-560-01 and NFPA 70E standards. Studies must analyze the system from the source bus to distribution buses with fault currents up to 10,000 amperes and voltages up to 600 volts for facility-level distribution. The contractor must provide load flow studies per IEEE 3002.2, fault current studies per IEEE 3002.3, system coordination studies demonstrating selective operation of protective devices, and arc flash hazard studies per IEEE 1584.1 with recommendations to reduce arc flash energy below 4 cal/cm² where it exceeds 8 cal/cm². Final deliverables include comprehensive study reports with single-line diagrams, coordination plots, time-current characteristic curves, thermal transfer arc flash labels (3.5" x 5" to 4" x 6"), and EasyPower model files in native editable formats for Government use.

View the file

Other files

File Type Posted
ATT 8_26 51 00.pdf PDF
Solicitation Amendment - FA813727R00020002.pdf PDF
250063_Pre-Bid RFI_Responses Signed.pdf PDF
26 05 73 POWER STUDIES.pdf PDF
ATT 1_02 41 00.pdf PDF
Solicitation Amendment FA813727R00020002 SF 30.pdf PDF
ATT 5_10 26 00.pdf PDF
ATT 6_22 05 48.00 20.pdf PDF
ATT 3_09 29 00.pdf PDF
ATT 4_09 68 00.pdf PDF
26 51 00 INTERIOR LIGHTING.pdf PDF
Revised L and M - WWYK250063.pdf PDF
ATT 2_09 22 00.pdf PDF
Solicitation Amendment - FA813726R00260001.pdf PDF
Wage Determination - OK20260049 05-18-2026.pdf PDF
Solicitation Amendment FA813727R00020001 SF 30.pdf PDF
WWYK250063 - Site Visit Sign In Sheet.jpg JPG image
00 70 00.pdf PDF
07 14 00.pdf PDF
23 05 15.pdf PDF
09 90 00.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
z400i.pdf_safe.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
220042 As Built Drawings.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
dafi91-202.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
250063_ATT 3_RMDF.pdf PDF
08 71 00.pdf PDF
afman91-203_oc-alcsup.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
01 50 00.pdf PDF
250063_ATT 4_ODS.pdf PDF
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
Room finish schedule.xlsx XLSX spreadsheet
ARCH-COMBINED.pdf PDF
dafi21-101.pdf PDF
23 05 93.pdf PDF
4500-S.pdf PDF
07 84 00.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
05 05 23.16.pdf PDF
007200_Attch13_AF487.pdf PDF
250063_SOW.pdf PDF
23 09 23.02.pdf PDF
05 40 00.pdf PDF
REACT VII SA-01.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
Show 40 more

Latest 50 of 152 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .