Room finish schedule.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This is a room finish schedule specification document for the REACT VII Facility installation project at Building 9001. The schedule details finishes for four rooms (two offices and two material testing rooms) and specifies standardized materials and finishes across the facility. Key finishes include: carpet tile over epoxy flooring (CT over EP-1) for offices; full epoxy flooring (EP-1) for material testing rooms; Roppe black 1/8" vinyl cove wall base (B-1) throughout; Sherwin Williams High Reflective White PROMAR 200 Zero VOC interior latex paint with eggshell sheen at finish level 4 (PT-1) and with orange peel texture at full wall height (PT-2); 2x2 acoustical grid ceilings (CLG-1); and 5/8" gypsum board with tape and bed finish level 4 ceilings (CLG-2). The epoxy floor system extends across the full footprint of REACT VII to the centerline of perimeter walls, with specific notation regarding the east wall finishing to the white line at Aisle 19 or the existing wall along Aisle 19.

The related solicitation (FA813727R0002, WWYK250063) is restricted to SBA Certified Women Owned Small Businesses (WOSB) only and requires mandatory attendance at an Initial Site Visit scheduled for Thursday, October 15, 2026, at 0900 CST at the northwest parking lot of Building 9001. Interested firms must submit an RSVP within five calendar days to SSgt Isaac Demmers and CC Tamra Torres, including personnel information and base access requirements if applicable.

View the file

Other files

File Type Posted
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_601_02_2021.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
afman91-203_oc-alcsup.pdf PDF
afi48-104.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
007200_Attch9_EMS Awareness Training.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
250063_ Redline A-502.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
lrad331965pd_spec.pdf PDF
ELECTRICAL COMBINED.pdf PDF
4500-MUG.pdf PDF
220042 As Built Drawings.pdf PDF
Solicitation - FA813727R0002.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
250063_ATT 3_RMDF.pdf PDF
23 05 15.pdf PDF
23 09 13.pdf PDF
09 90 00.pdf PDF
26 20 00.pdf PDF
08 51 23.pdf PDF
07 92 00.pdf PDF
07 14 00.pdf PDF
08 71 00.pdf PDF
23 05 93.pdf PDF
07 84 00.pdf PDF
03 01 00.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ROOM FINISH SCHEDULE
ROOM #ROOM NAMEFLOORBASEWALLSCEILING BELOW ROOF PRAMONGROOM CEILINGUPPER CEILINGCOMMENTS
101OFFICE-1CT OVER EP-1B-1PT-1PT-2, CLG-2CLG-1CLG-2, PT-2CARPET OVER EPOXY FLOOR
102OFFICE-2CT OVER EP-1B-1PT-1PT-2, CLG-2CLG-1CLG-2, PT-2CARPET OVER EPOXY FLOOR
103MATERIAL TESSTING ROOM - 1EP1B-1PT-1PT-2, CLG-2CLG-1CLG-2, PT-2EPOXY FLOOR
104MATERIAL TESSTING ROOM - 2EP1B-1PT-1PT-2, CLG-2CLG-1CLG-2, PT-2EPOXY FLOOR
EXPOSED EXT. WALLSB-1PT-1
PT-1SHERWIN WILLIAMS HIGH REFLECTIVE WHITE PROMAR 200 ZEROVOC INTERIOR LATEX WITH "EGGSHELL" SHEEN. FINISH LEVEL 4
PT-2SHERWIN WILLIAMS HIGH REFLECTIVE WHITE PROMAR 200 ZEROVOC INTERIOR LATEX WITH "EGGSHELL" SHEEN. FINISH LEVEL 4 WITH ORANGE PEEL FINISH FULL HEIGHT OF WALL.
B-14 1/2" ROPPE BLACK 1/8" VINYL COVE WALL BASE
CLG-12X2 ACOUSTICAL GRID CEILING
CLG-25/8" GYPSUM BOARD TAPE & BED FINISH LEVEL 4.
CTCARPET TILE OVER EXPOXY FLOOR (EP-1
EP-1EPOXY FLOOR SYSTEM - FULL FOOTPRINT OF REACT VII TO CENTERLINE OF PERMIMETER WALLS. AT EAST REACT VII WALL, FINISH TO EXTENT TO WHITELINE AT AISLE 19 OR TO WESTSIDE OF EXISTING WALL ALONG AISLE 19

File details come from the government source that posted it. Updated .