Sol_140P2026R0091.pdf
PDF 645 KB Posted
- Solicitation number
- 140P2026R0091
About this file
Solicitation Summary: HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
This is a competitive negotiated Request for Proposal (RFP) issued by the National Park Service (NPS) Denver Service Center for construction services at Hawaii Volcanoes National Park. The solicitation number is 140P2026R0091, issued September 18, 2026, with proposal submission deadline of October 23, 2026 at 1600 hours local time. The project involves rehabilitation of the park's rainwater catchment system, replacement of Building 43 with a pre-engineered metal building, and replacement of Building 241 with a steel-column open-air structure plus new CMU building construction. The scope includes improvements to ground catchment, collection pipes, filtration, storage tanks, equipment replacement, site pavement restoration, and perimeter security fence replacement. The contract is firm-fixed-price with a 610-calendar-day completion period following notice to proceed. Performance and payment bonds are required within 10 calendar days of award. Liquidated damages are set at $1,558.00 per calendar day of delay.
Proposals must be submitted electronically in two separate volumes: Volume I (technical and management proposal addressing project experience, technical approach, management approach, and construction schedule) and Volume II (business and price proposal including SF-1442, price schedule with Schedule of Values, bid guarantee, and representations/certifications). The Government will evaluate proposals using best value tradeoff analysis, with non-price factors (technical and management factors, past performance) and price as evaluation criteria. Four optional contract line items are identified for potential exercise within 120 days of award. The acquisition includes standard federal clauses including Buy American construction materials requirements, Davis-Bacon wage rates, small business subcontracting plan requirements for large businesses, and various compliance certifications. A pre-proposal site visit is scheduled for September 30, 2026. Pre-proposal questions are due by October 15, 2026.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140P2026R0091
NPS, DSC Contracting Services Div 1 Denver Federal Center, Building 50 P.O. Box 25287 Denver CO 80225-0287
Refer to Section L
0044053083
PDS
Abigail Villareal 303-884-9985
09/18/2026
10/23/2026
10 610 Special Requirement 1
HAVO 326181 Hawaii Volcanoes National Park - Rehabilitate Rainshed & Water Treatment System
a) No Set-Aside is used for this acquisition. The North American Industrial Classification System
(NAICS) Code and the associated small business size standard are noted in clause 52.204-08 in Section K of this solicitation.
B) Magnitude of Construction is over $25 Million.
c) Refer to section "L" for information regarding a pre-proposal site visit, and for proposal submittal requirements.
d) Information and requirements stated in sections "B" through "J" and attachments noted in section "J" apply to this solicitation and the subsequent contract.
e) Offerors shall submit proposals and questions and acknowledge solicitation amendments as stated in section "L" of this solicitation.
1 61
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
NPS, DSC Contracting Services Div 1 Denver Federal Center, Building 50 P.O. Box 25287 Denver CO 80225-0287
PDS
Malissa Crofoot
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
Delivery: 12/21/2028
Delivery Location Code: 0011283433
NPS,DSC-Design & Construction
1 Denver Federal Center Bldg 50
Denver CO 80225 US
00010 CLIN 1 - Rehab Water Treatment SYstem
Product/Service Code: Y1NZ
Product/Service Description: CONSTRUCTION OF
OTHER UTILITIES
Period of Performance: 11/01/2026 to
07/03/2028
00020 CLIN 2 - Replace Building 43
Product/Service Code: Y1PD
Product/Service Description: CONSTRUCTION OF
WASTE TREATMENT AND STORAGE FACILITIES
Period of Performance: 11/01/2026 to
07/03/2028
00030 CLIN 3 - Replace Building 241
Product/Service Code: Y1PD
Product/Service Description: CONSTRUCTION OF
WASTE TREATMENT AND STORAGE FACILITIES
Period of Performance: 11/01/2026 to
07/03/2028
00040 CLIN 4 - Building 43 and 241 Section 106
Product/Service Code: Y1PD
Product/Service Description: CONSTRUCTION OF
WASTE TREATMENT AND STORAGE FACILITIES
Period of Performance: 11/01/2026 to
07/03/2028
Solicitation No.
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
TABLE OF CONTENTS
PART I – THE SCHEDULE
SECTION A – SOLICITATION / CONTRACT FORM
SECTION B – PRICE SCHEDULE
SECTION C – SPECIFICATIONS / DRAWINGS
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
SECTION F – DELIVERIES OR PERFORMANCE
52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)
52.211-13 TIME EXTENSIONS (SEPT 2000)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (DEVIATION JAN 2026)
52.242-14 SUSPENSION OF WORK (APR 1984)
SECTION G – CONTRACT ADMINISTRATION DATA
1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)
1452.204-70 RELEASE OF CLAIMS—DEPARTMENT OF THE INTERIOR (JUL 1996)
NOTICE TO CONTRACTORS - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING
SYSTEM (DEC 2015)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM
SYSTEM (FEB 2021)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
SPECIAL REQUIREMENT 1: COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
SPECIAL REQUIREMENT 2: PERFORMANCE OF WORK BY THE CONTRACTOR
SPECIAL REQUIREMENT 3: OPTIONAL LINE ITEMS
SPECIAL REQUIREMENT 4: KEY PERSONNEL
SPECIAL REQUIREMENT 5: KEY TRADES
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS
CONCERNS (DEVIATION JAN 2026)
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA ALT I
(DEVIATION MAY 2026)
52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL
HYDROFLUOROCARBONS (MAY 2024)
52.223-23 SUSTAINABLE PRODUCTS (DEVIATION MAY 2026)
52.225-11 BUY AMERICAN – CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV
2023)
52.228-11 INDIVIDUAL SURETY - PLEDGE OF ASSETS (DEVIATION MAY 2023)
52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (DEVIATION MAY 2023)
Definitions. As used in this clause-
52.236-2 DIFFERING SITE CONDITIONS (DEVIATION JAN 2026)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (DEVIATION JAN 2026)30
52.236-5 MATERIAL AND WORKMANSHIP (DEVIATION JAN 2026)
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (DEVIATION JAN 2026)
52.236-7 PERMITS AND RESPONSIBILITIES (DEVIATION JAN 2026)
52.236-8 OTHER CONTRACTS (DEVIATION JAN 2026)
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (DEVIATION JAN 2026)
52.236-10 OPERATIONS AND STORAGE AREAS (DEVIATION JAN 2026)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (DEVIATION JAN 2026)
52.236-12 CLEANING UP (DEVIATION JAN 2026)
52.236-13 ACCIDENT PREVENTION (DEVIATION JAN 2026)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (DEVIATION JAN 2026)
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (DEVIATION JAN 2026) ALT I (1984)
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (NOV 2020)
1452.203-70 RESTRICTIONS ON ENDORSEMENTS (JUL 1996)
1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF THE INTERIOR (APR 1984) ..36
1452.228-70 LIABILITY INSURANCE. (JUL 1996)
1452.236-70 PROHIBITION AGAINST USE OF LEAD-BASED PAINT (JUL 1996)
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
SECTION J – LIST OF ATTACHMENTS
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
PROVISIONS INCORPORATED BY REFERENCE
PROVISIONS INCORPORATED BY FULL TEXT
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
52.209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2025)
52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS-CERTIFICATION
DEVIATION MAY 2026)
52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)
52.223-1 BIOBASED PRODUCT CERTIFICATION (DEVIATION MAY2026FEB 2025)
52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (JUN 2020)
52.230-7 PROPOSAL DISCLOSURE-COST ACCOUNTING PRACTICE CHANGES (APR 2005)
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
PROVISIONS INCORPORATED BY FULL TEXT
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED OR PRICING DATA (NOV 2021)
52.216-1 TYPE OF CONTRACT (APR 1984)
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT – CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
52.228-1 BID GUARANTEE (SEP 1996)
52.228-17 INDIVIDUAL SURETY – PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)
52.232-38 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH OFFER (JUL
2013)
52.233-2 SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR (JUL 1996) (DEVIATION)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION—DEPARTMENT OF THE
INTERIOR (APR 1984)
SPECIAL INSTRUCTION: SITE VISIT
INSTRUCTIONS FOR THE SUBMISSION OF OFFERS AND OTHER INFORMATION – COMPETITIVE
SOURCE SELECTION
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
SECTION M – EVALUATION FACTORS FOR AWARD
SPECIAL PROVISION 1: EVALUATION OF OPTIONAL CLINS
PART I – THE SCHEDULE
SECTION A – SOLICITATION / CONTRACT FORM
Solicitation, Offer, and Award (SF-1442) - pages 1- 2 of this package
End of Section A
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
SECTION B – PRICE SCHEDULE
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P2026R0091
PARK - PMIS: HAVO 326181
PROJECT TITLE: Rehabilitate Rainshed & Water Treatment System
Offerors are required to submit, at a minimum, one (1) Firm-Fixed-Price (FFP) offer that conforms to the solicitation documents with pricing for Base Contract Line Items (CLINS) and all optional CLINS.
Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of summation error, the total corrected amounts govern. Round totals and extended prices to whole dollars. Refer to section “H” of this solicitation for additional information regarding contract optional CLINs.
CLIN CLIN TITLE QUANTITY UNIT OF
MEASURE
TOTAL
PRICE
00010 Rehabilitate Water Treatment System 1 LS 00020 Replace Building 43 1 LS 00030 Replace Building 241 1 LS
00040 Buildings 43 and 241 Section 106 Mitigation 1 LS
TOTAL BASE PRICE (Contract Line-Item Number 00010 through 00040)
OPTIONAL CLINS
TBD OPTION A, Replace 241 SAR Building 1 LS
TBD OPTION B, Repair and Improve Water Treatment System 1 LS
TBD OPTION C, Replace Perimeter Fence 1 LS
TBD OPTION D, Replace Ground Catchment Pavement 1 LS
TOTAL PRICE FOR ALL OPTIONAL CLINS
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONAL CLINS
All measurement and payment information are included in the project specifications, Section 01 27 00.
LS= Lump Sum
End of Section B
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
SECTION C – SPECIFICATIONS / DRAWINGS
The work of this contract is for the construction of HAVO 326181 Rehabilitate Rainshed & Water Treatment System at Hawaii Volcanoes National Park, Rainshed in Kīlauea Headquarters Area, Volcano, Hawaii.
The Work consists of:
1. Rehabilitating the park’s rainwater catchment system. This includes improvements to multiple components of the system including ground catchment, collection pipes, filtration, storage tanks, and equipment, replacing site pavement impacted by improvements, and replacing the perimeter security fence.
2. Replacing Building 43. This includes the demolition and replacement of Building 43 with a new pre-engineered metal building.
3. Replacing Building 241. This includes the demolition and replacement of Building 241 with a similar open-air structure incorporating steel columns. This also includes the removal of two smaller accessory buildings underneath the structure and constructing a new one-story CMU building.
Specifications and drawings are attached and incorporated herein by reference. Refer to section J.
End of Section C
SECTION D – PACKAGING AND MARKING
Section Does Not Apply
End of Section D
SECTION E – INSPECTION AND ACCEPTANCE
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Refer to Specifications: Division 01 Section 01 40 00 - Quality Requirements and Division 02 through Division 46 for specific test and inspection requirements.
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning work instructions, documentation control, and advanced metrology.
(End of clause)
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
https://www.acquisition.gov/far/46.203#FAR_46_203
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its Subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of clause)
End of Section E
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
SECTION F – DELIVERIES OR PERFORMANCE
52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,558.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.211-13 TIME EXTENSIONS (SEPT 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
(End of clause)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (DEVIATION JAN 2026)
(a)
(1) Within five days after the work commences on the contract or another period of time determined by the Contracting Officer, the Contractor shall prepare and submit to the Contracting Officer for approval a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the work (including acquiring materials, plant, and equipment).
(2) The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period.
(3) If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall continually update the actual progress in the schedule and shall submit it to the Contracting Officer by the means prescribed in the contract for transmittals or as directed by the Contracting Officer.
(c)
(1) If the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to recover lost time and execute in accordance with the approved schedule, without additional cost to the Government.
(2) Such steps may include increasing the number of shifts, overtime operations, days of work, and/or the amount of construction plant.
(3) The Contractor shall submit, for approval, supplementary schedule(s) that demonstrate how the lost time will be recovered.
(d) If the Contractor does not recover the lost time, the Contracting Officer may determine that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
(End of clause)
52.242-14 SUSPENSION OF WORK (APR 1984)
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed—
(1) For any costs incurred more than 20-days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
(End of clause)
End of Section F
SECTION G – CONTRACT ADMINISTRATION DATA
1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the Contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3-days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30-days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of clause)
1452.204-70 RELEASE OF CLAIMS—DEPARTMENT OF THE INTERIOR (JUL 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI–137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
(End of clause)
NOTICE TO CONTRACTORS - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING
SYSTEM (DEC 2015)
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in CPARS for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30-days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60-days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e. Your response is due within 60-calendar days after receipt of the CPAR. On day 15, the evaluation will become available in CPARS marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60-days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the Contractor on (date). The Contractor neither signed nor offered comment in response to this assessment."
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
6. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven (7)-days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of notice)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING
PLATFORM SYSTEM (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Completed copy of the CMR’s final Construction Payment Request Checklist (Submit only with the formal submittal to IPP);
2. Completed copy of the Pay Estimate Form (including signed certification of Subcontractor payments);
3. Information required by contract clause 52.232-27, Prompt Payment for Construction Contracts;
4. A copy of the current construction schedule (refer to project specification section 013216); and
5. A copy of the current Schedule of Values. (refer to project specification section 013216).
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email Invoice Processing Platform - Contact Us (treasury.gov) or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
To ensure the timely and efficient processing of contractor invoices, the contractor is required to submit a draft invoice package, which must include all necessary documentation as specified above. This draft invoice package should be submitted to the National Park Service Contracting Officer’s Representative (COR) and, if applicable, the Construction Management Representative (CMR) assigned to the contract, at least seven (7) calendar days prior to the intended submission to the Invoice Processing Platform (IPP) system.
Upon receipt of the draft invoice package, the COR will provide a signed cover letter, which the contractor must upload into the IPP system along with their final invoice package.
https://www.ipp.gov/ https://www.fiscal.treasury.gov/ipp/contact.html https://www.fiscal.treasury.gov/ipp/contact.html
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
If the contractor does not receive the signed cover letter from the COR within the specified seven (7) calendar days, the contractor is authorized to proceed with uploading the invoice package, along with the draft invoice review email sent to the COR, into the IPP system for approval, in accordance with the timelines established by the Prompt Payment Act.
(End of Clause)
End of Section G
SECTION H – SPECIAL CONTRACT REQUIREMENTS
SPECIAL REQUIREMENT 1: COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The Contractor is required to submit payment and performance bonds and insurance within 10 calendar days after award.
Notice to Proceed and commencement of work under this contract shall begin after receipt of payment and performance bonds and insurance. The contractor shall complete the entire work ready for use not later than 610 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Local Clause)
SPECIAL REQUIREMENT 2: PERFORMANCE OF WORK BY THE CONTRACTOR
The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifteen, 15% percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction, and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of Local Clause)
SPECIAL REQUIREMENT 3: OPTIONAL LINE ITEMS
The Government may require delivery of the optional line items identified in the Price Schedule at the price stated in the Schedule. The Contracting Officer may exercise the optional line items by written notice to the Contractor within 120 days after contract award.
(End of clause)
SPECIAL REQUIREMENT 4: KEY PERSONNEL
(a) The Contractor shall assign to this contract the following key personnel:
Project Manager: ___________________________
Job Site Superintendent: ___________________________
Job Site Quality Control Manager: ______________________
Job Site Safety Manager: ___________________________
(b) During the first 365 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15-calendar days after the occurrence of any of these events and provide the information required by
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page paragraph (c) below. After the initial 365 day period, the Contractor shall submit the information required by paragraph
(c) to the Contracting Officer at least 15-days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer.
Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15-calendar days after receipt of all required information of the decision on substitutions. This clause will be modified to reflect any approved changes of key personnel.
(End of clause)
SPECIAL REQUIREMENT 5: KEY TRADES
(a) The Contractor shall identify firms that will perform the following KEY TRADES under this contract. If Key Trades will be self-performed, note “self-performed” in the appropriate trade; otherwise provide the name(s) of assigned Subcontractors.
Pre-Engineered Metal Building (PEMB) Construction: __________________________
Reservoir / Liner Installation: __________________________
Structural Steel and Timber Framing: __________________________
Concrete Construction: __________________________
Historic Preservation Specialist: __________________________
Other (if applicable): __________________________
(b) The assignments above are permanent for the contract duration. The Contractor shall make no substitutions of the above listed Key Trade assignments unless the substitution is approved or directed by the Contracting Officer. The Contractor shall send requests for substitutions to the Contracting Officer a minimum of 15-calendar days prior to any substitution and provide the information required by paragraph (c) below.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete qualification statements for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes shall have comparable qualifications to the firm being replaced. The Contracting Officer will approve or deny substitution requests within 15-calendar days after receipt of all required information. This clause will be modified to reflect any approved changes.
(End of clause)
End of Section H
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
FAR AND DIAR CLAUSES
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
Federal Acquisition Regulation: https://www.acquisition.gov/far/
Department of the Interior Acquisition Regulation (CFR, Title 48, Chapter 14): http://www.ecfr.gov/cgi-bin/text-idx?SID=46fff09635987db3af784ea3c7efc2e0&mc=true&tpl=/ecfrbrowse/Title48/48cfrv5_02.tpl#1400
CLAUSES INCORPORATED BY REFERENCE
CLAUSE DESCRIPTION DATE
52.202-1 DEFINITIONS JUN 2020
52.203-3 GRATUITIES APR 1984
52.203-5 COVENANT AGAINST CONTINGENT FEES MAY 2014
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT JUN 2020
52.203-7 ANTI-KICKBACK PROCEDURES MAY 2014
52.203-8 CANCELLATION, RECESSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY
MAY 2014
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY 2014
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS
JUN 2020
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT NOV 2021
52.203-14 DISPLAY OF HOTLINE POSTER(S) NOV 2021
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS NOV 2023
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS
JAN 2017
52.204-5 WOMEN-OWNED BUSINESS (OTHER THAN SMALL BUSINESS) OCT 2014
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS DEVIATION
APR 2026
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE DEVIATION APR 2026
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS DEVIATION APR 2026
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS
DEC 2014
52.209-6 MAY 2026
PROTECTING THE GOVERNMENT’S INTEREST WHEN SUB-CONTRACTING
WITH CONTRACTOR’S DEBARRED, SUSPENDED, OR PROPOSED FOR
DEBARMENT, OR VOLUNTARILY EXCLUDED DEVIATION
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS DEVIATION
MAY 2026
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS DEVIATION
MAY 2026
52.210-1 MARKET RESEARCH DEVIATION JUL 2025
52.215-2 AUDIT AND RECORDS-NEGOTIATIONS JUN 2020
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT OCT 1997
52.215-17 WAIVER OF FACILITIES CAPITAL COST OF MONEY OCT 1997
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS DEVIATION JAN 2026
52.219-9 SMALL BUSINESS SUBCONRACTING PLAN JAN 2025
52.219-16 LIQUIDATED DAMAGES-SUBCONTRACTING PLAN DEVIATION JAN 2026
52.222-3 CONVICT LABOR DEVIATION JUN 2003
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS-OVERTIME
COMPENSATION DEVIATION
MAY 2026
https://www.acquisition.gov/far/ http://www.ecfr.gov/cgi-bin/text-idx?SID=46fff09635987db3af784ea3c7efc2e0&mc=true&tpl=/ecfrbrowse/Title48/48cfrv5_02.tpl#1400 http://www.ecfr.gov/cgi-bin/text-idx?SID=46fff09635987db3af784ea3c7efc2e0&mc=true&tpl=/ecfrbrowse/Title48/48cfrv5_02.tpl#1400
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS DEVIATION MAY 2026
52.222-7 WITHHOLDING OF FUNDS DEVIATION MAY 2026
52.222-8 PAYROLLS AND BASIC RECORDS DEVIATION MAY 2026
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS DEVIATION MAY 2026
52.222-11 SUBCONTRACTS (LABOR STANDARDS) DEVIATION MAY 2026
52.222-12 CONTRACT TERMINATION - DEBARMENT DEVIATION MAY 2026
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIRMENTS AND
RELATED REGULATIONS
MAY 2014
52.222-14 DISPUTES CONCERNING LABOR STANDARDS DEVIATION MAY 2026
52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014
52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES
DEVIATION
MAY 2026
52.222-35 EQUAL OPPORTUNITY FOR VETERANS DEVIATION MAY 2026
52.222-36 EQUALOPPORTUNITY FOR WORKERS WITH DISABILITIES DEVIATION MAY 2062
52.222-37 EMPLOYMENT REPORTS ON VETERANS DEVIATION MAY 2062
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT DEVIATION
MAY 2026
52.222-50 COMBATING TRAFFICKING IN PERSONS DEVIATION MAY 2026
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION DEVIATION MAY 2026
52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER
14026
JAN 2022
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 DEVIATION MAY 2026
52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS DEVIATION MAY 2026
52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS DEVIATION
FEB 2025
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION MAY 2024
52.223-12 MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF REFRIGERATION
EQUIPMENT AND AIR CONDITIONERS DEVIATION
MAY 2026
52.226-7 DRUG-FREE WORKPLACE MAY 2024
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING
MAY 2024
52.227-1 AUTHORIZATION AND CONSENT JUN 2020
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT
JUN 2020
52.227-4 PATENT INDEMNITY-CONSTRUCTION CONTRACTS DEC 2007
52.227-17 RIGHTS IN DATA – SPECIAL WORKS DEC 2007
52.228-2 ADDITIONAL BOND SECURITY OCT 1997
52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION JAN 1997
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS DEC 2022
52.228-14 IRREVOCABLE LETTER OF CREDIT NOV 2014
52.229-3 FEDERAL, STATE, AND LOCAL TAXES DEVIATION SEP 2025
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014
52.232-17 INTEREST MAY 2014
52.232-23 ASSIGNMENT OF CLAIMS MAY 2014
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD OCT 2018
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
MANAGEMENT
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN 2013
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
CONTRACTORS
MAR 2023
52.233-1 DISPUTES ALTERNATE 1 DEC 1991
52.233-3 PROTEST AFTER AWARD AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.236-16 QUANTITY SURVEYS DEVIATION JAN 2026
52.236-17 LAYOUT OF WORK DEVIATION JAN 2026
52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS JAN 2017
52.242-13 BANKRUPTCY JUL 1995
52.243-4 CHANGES DEVIATION SEP 2025
52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES DEVIATION
MAY 2026
52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
52.248-3 VALUE ENGINEERING – CONSTRUCTION OCT 2025
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT ALT I SEP 1996
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) APR 1984
52.253-1 COMPUTER GENERATED FORMS DEVIATION MAY 2026
52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS
CONCERNS (DEVIATION JAN 2026)
(a) Evaluation preference.(1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except--
(i) Offers from HUBZone small business concerns that have not waived the evaluation preference; and
(ii) Otherwise, successful offers from small business concerns.
(b) Waiver of evaluation preference. A HUBZone small business concern may elect to waive the evaluation preference, in which case the factor will be added to its offer for evaluation purposes.
☐ Offeror elects to waive the evaluation preference.
(c) Joint venture. A HUBZone joint venture agrees that, in the performance of the contract, at least 40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture. Work performed by the HUBZone small business parties to the joint venture must be more than administrative functions.
(End of clause)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION. (DEVIATION
JAN 2026)
(a) Definitions. As used in this clause—
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern—
National Park Service (NPS) – Denver Service Center (DSC) HAVO 326181 – Rehabilitate Rainshed & Water Treatment System
Page
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.
(2) Affiliates, as used in this definition, means…
This is the start of the file's text. The full file is on GovTribe.