This is Amendment 0004 to Request for Proposals (RFP) No. 140P2026R0091, issued by the National Park Service (NPS), Directed Services Center (DSC) Contracting Services Division in Denver, Colorado. The amendment extends the proposal submission deadline from November 20, 2026, to November 27, 2026, and adds two attachments: B09_Att (25) Revised-RFI-102-Response and B09_Att (26) Supplemental-Technical-Addendum 02. The solicitation concerns HAVO 326181 Hawaii Volcanoes National Park—Rehabilitate Rainshed & Water Treatment System. All other terms and conditions of the RFP remain unchanged.

This is the fourth amendment to the original RFP issued September 18, 2026. Amendment 0001 was issued September 28, 2026, without extension; Amendment 0002 was issued October 13, 2026, extending the due date to November 6, 2026; and Amendment 0003 was issued November 5, 2026, extending the due date to November 20, 2026. Offerors must acknowledge receipt of Amendment 0004 by completing the form and returning it, by acknowledging receipt on each copy of their offer, or by separate letter or electronic communication referencing the solicitation and amendment numbers, with submission required prior to the November 27, 2026, deadline. Failure to acknowledge receipt at the designated location by the specified date and time may result in rejection of the offer.

View the file

Other files

File Type Posted
B09_Att_(25)_Revised-RFI-102-Response_0004.xlsx XLSX spreadsheet
B09_Att_(26)_Supplemental-Technical-Addendum_02_0004.xlsx XLSX spreadsheet
B09_Att_(21)_REFERENCE_Redwood-Water-Tank-Drawing_0003.pdf PDF
Sol_140P2026R0091_Amd_0003.pdf PDF
B09_Att_(24)_REFERENCE_PrePropSiteVisitSignInSheet_0003.pdf PDF
B09_Att_(23)_REFERENCE_2024TankInspectionReports_0003.pdf PDF
B09_Att_(16)_Pre-Proposal_RFI_Responses_0003.pdf PDF
B09_Att_(20)_REFERENCE_ElectricalAsBuiltDrawings_0003.pdf PDF
B09_Att_(18)_Spec-09-65-00_Resilient-Base_0003.pdf PDF
B09_Att_(17)_A-E-Technical-Addendum_0003.pdf PDF
B09_Att_(19)_Spec-09-67-23_Resinous-Flooring_0003.pdf PDF
B09_Att_(22)_REFERENCE_RedwoodTanks2018TripReport_0003.pdf PDF
Sol_140P2026R0091_Amd_0002.pdf PDF
B09_Att_(15)_HAVO_326181_-_Site_Walk_Requirements_30JUL2026_0001.pdf PDF
Sol_140P2026R0091_Amd_0001.pdf PDF
B08_Att_(13)_HAVO_326181_Final_CD_Basis_of_Design_Product_Files.pdf PDF
Sol_140P2026R0091.pdf PDF
B08_Att_(9)_Redwood_Water_Tanks_Trip_Rpt_and_Prelim_Treat_Recs__2018.pdf PDF
B08_Att_(12)_GenRefs.docx DOCX document
B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf PDF
B08_Att_(6)_HAER_HAVO_Water_Collection_System_HI-76__Final_report.pdf PDF
B08_Att_(3)_2024_08_26_-_Geotechnical_Data_Report_-_HAVO_Rainsheds_Shear_Wave_Velocity_Survey.pdf PDF
B08_Att_(8)_HAVO_326181_Construction_Phasing_Memo.pdf PDF
B08_Att_(14)_Hazardous_Material_Survey_HAVO_Rainshed_Enviroquest_May2025.pdf PDF
B08_Att_(2)_HAVO_326181_26_0908_Final_CD_Drawing_Set.pdf PDF
B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf PDF
B08_Att_(7)_HAVO_326181_Construction_Phasing_Calcs.xlsx XLSX spreadsheet
B08_Att_(10)_Davis-Bacon_Act_WD__HI20260001.pdf PDF
B08_Att_(11)_Solit_PSP_Vol_II_SubKPlan.docx DOCX document
B08_Att_(5)_HAER_Drawings_HAVO_Rainshed.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Malissa Crofoot

See continuation page

NPS, DSC Contracting Services Div 1 Denver Federal Center, Building 50 P.O. Box 25287 Denver CO 80225-0287

PDS

140P2026R0091

09/18/2026

09/18/2026

1 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P2026R0091/0004

HAVO 326181 Hawaii Volcanoes National Park -

Rehabilitate Rainshed & Water Treatment System

The purpose of Amendment 0004 is to:

1. Extend the due date for proposals from

November 20, 2026, to November 27, 2026.

2. Add the following attachments:

a. B09_Att (25) Revised-RFI-102-Response

b. B09_Att (26) Supplemental-Technical-Addendum

All other terms and conditions remain unchanged.

RFP No. 140P2026R0091 - Issued 09/18/2026.

Amendment 0001: Issued 09/28/2026; not extended.

Amendment 0002: Issued 10/13/2026; due date extended to 11/6/2026.

Amendment 0003: Issued 11/05/2026; due date extended to 11/20/2026.

Amendment 0004: Issued 11/20/2026; due date extended to 11/27/2026.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .