B09_Att_(18)_Spec-09-65-00_Resilient-Base_0003.pdf
PDF 98 KB Posted
- Solicitation number
- 140P2026R0091
About this file
This is a specification document for resilient base installation work under Section 09 65 00 of the HAVO-326181 project. The specification details all labor, materials, equipment, and services required to supply and install resilient vinyl base to designated areas noted on project drawings and schedules. The specification governs work preparation, materials, and installation in strict accordance with the National Floor Covering Association of Canada (NFCA) Floor Covering Reference Manual and ASTM F1861, Standard Specification for Resilient Wall Base. All work is subject to the NFCA Quality Assurance Program (QAP) inspection, with QAP costs to be included in the bid price. The flooring contractor must be recommended by the resilient base manufacturer as qualified to perform the installation, and the installer must be a member in good standing of the NFCA and referenced on the NFCA website at all times during work performance.
The required product is 3 mm (1/8") thick by 102 mm (4") high top-set extruded vinyl coved base, ASTM F1861 Type TV compliant, complete with pre-molded external and internal corners. Installation shall utilize longest practical lengths (minimum 2400 mm or 96" long) fitted tightly to floor and vertical surfaces, with pre-fabricated external corners wrapping around outside corners a minimum of 300 mm (12") and matching internal corners. Substrate preparation must verify moisture and alkalinity testing compliance with NFCA requirements and manufacturer specifications. All materials must be delivered in original, sealed packaging 48 hours before installation for site conditioning; adhesives must be low volatile organic compound (VOC) materials to lessen off-gassing. Contractor must submit manufacturer's product literature, technical data, sample sets for review, and at project completion provide a materials list with all installed products, adhesive types, and maintenance instructions. Any preparation, materials, or workmanship not meeting NFCA requirements shall be repaired or replaced at no additional cost to the Government.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAVO – 326181 09 65 00- 1
110326 RESILIENT BASE
SECTION 09 65 00 – RESILIENT BASE
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes all labor, materials, equipment, and services to supply and install resilient base to areas noted on drawings and schedules and as specified herein. This Section along with the drawings forms part of the Contract and is to be read, interpreted, and coordinated with all other parts.
1.2 REFERENCES
A. The latest edition of the Floor Covering Reference Manual issued by the National Floor Covering Association of Canada (NFCA) shall govern all materials and workmanship. Whenever reference is made within this specification to NFCA requirements it shall mean, as a minimum, those standards and requirements noted in the NFCA Reference Manual.
B. The latest applicable edition of the following reference standards shall also govern all materials and installation work specified herein as applicable: ASTM F1861, Standard Specification for Resilient Wall Base.
1.3 SUBMITTALS
A. Submit manufacturer's product literature, technical data in both metric and imperial values verifying compliance with specification requirements, and full range of products and patterns / colors available with sample set for review / selection.
B. At project completion, submit a list of all materials installed, including adhesives, accessories and bases clearly indicating material and manufacturer's names, type / pattern / color name and numbers for Government's future reference.
C. At project completion submit manufacturer's maintenance data and cleaning instructions for type of resilient base installed.
1.4 QUALITY ASSURANCE
A. All preparation, materials, and workmanship shall be in strict accordance with NFCA requirements and material manufacturer's written recommendations and detail requirements for conditions of work that apply and guarantee / warranty periods noted herein.
B. Any preparation, materials, and workmanship that does not meet NFCA requirements shall be repaired or replaced in accordance with Quality Assurance requirements at no additional cost to the Government.
HAVO – 326181 09 65 00- 2
C. The flooring contractor shall be recommended by the manufacturer / supplier of the resilient base as qualified to install the resilient base.
1.5 NFCA QUALITY ASSURANCE REQUIREMENTS PROGRAM (QAP) INSPECTION
A. The cost of the Quality Assurance Program (QAP), shall be included in the cost of the base work.
Contact NFCA (www.nfca.ca) for clarifications prior to submitting a bid. QAP costs can be viewed in PART A04B of the NFCA Floor Covering Reference Manual.
B. All Work described in this Section is included under the Quality Assurance Program (QAP) of NFCA (National Floor Covering Association), as detailed in section PART A04 Quality.
C. Assurance Program in the latest (online) edition of the Floor Covering Reference Manual of Canada and will be reviewed in accordance with QAP requirements therein by an Inspection Agency assigned by the National Floor Covering Association (NFCA).
D. Any preparation, materials, and workmanship that do not meet NFCA requirements will be replaced in accordance with Quality Assurance requirements without any additional cost to the Government.
E. On award of contract, contact NFCA and request a QA Review Form complete and submit prior to ordering materials.
F. Qualification of installers performing all work shall meet the requirements detailed in PART A05 Trade Qualifications in the latest edition of the NFCA Floor Covering Reference Manual.
G. Installer Qualifications – The installer of the resilient base at the time of and through-out the performance of the work shall be a member in good standing of the National Floor Covering Association (NFCA) and referenced on the NFCA website (www.nfca.ca).
1.6 REGULATORY AND ENVIRONMENTAL REQUIREMENTS
A. Ensure that all materials, including adhesives and other accessory products, are environmentally safe and are not prohibited by any applicable laws, regulations, bylaws, ordinances or orders of any government authority.
B. Ensure that all employees are fully informed and comply, at all times with Workplace Hazardous Material Information System (WHMIS) requirements.
1. Any adhesive and sealant used shall be low VOC materials and shall be conditioned on site to lessen off-gassing.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver all materials (including adhesives and accessories) wrapped / sealed in original labelled and unopened packaging with type and pattern / color and registration numbers clearly marked on each roll, carton, or container http://www.nfca.ca/
HAVO – 326181 09 65 00- 3
B. Prevent damage to and store all materials in strict accordance with manufacturer's written requirements in a secure dry space.
C. Deliver all materials to work areas when required and a minimum of 48 hours before installation to condition materials to site temperature and humidity conditions.
PART 2 - PRODUCTS
2.1 VINYL BASE
A. 3 mm (1/8") thick x 102 mm (4") high top set extruded vinyl coved base compliant to ASTM F1861, Type TV , complete with pre-molded external and internal corners.
PART 3 - EXECUTION
3.1 INSTALLATION REQUIREMENTS
A. Review substrate, environmental conditions and work by other trades to ensure that they are in complete compliance with the manufacturer's recommended installation specification and NFCA Standard requirements prior to the installation of resilient floor coverings. Start no work until all conditions are acceptable.
B. Ensure that paint, varnish, and oils not compatible with adhesives employed have been removed.
3.2 PREPARATION
A. Verify that moisture and alkalinity testing has been done by General Contractor and field check ratings as required.
B. The type, location, condition and surface tolerances of substrate must be in complete accordance with NFCA requirements and resilient base manufacturer’s recommendations.
C. Fill substrate low spots, minor cracks, joints and holes with substrate filler to the extent required by scope of work and ensure substrates are free from all bumps, ridges and other imperfections.
Feather filler as required to allow for difference in adjacent floor materials. Sand smooth to eliminate all irregularities, bumps, ridges and other imperfections and vacuum clean to provide a surface that will not telegraph imperfections
D. Seal and prime substrate surfaces if recommended by flooring adhesive manufacturer's recommendations.
3.3 INSTALLATION OF RESILIENT BASE
A. Provide resilient base to all areas with resinous flooring.
HAVO – 326181 09 65 00- 4
B. Install base where indicated on schedule in longest practical lengths (minimum 2400 mm (96") long) fitted tightly to floor and vertical surfaces (walls, columns, millwork, etc.). Scribe to door frames and other obstructions.
C. Fit base at exterior and interior corners in accordance with manufacturer’s recommendations and following: Provide matching pre-fabricated external corners that wrap around outside corners a minimum of 300 mm (12") and matching internal corners.
3.4 CLEAN UP, ADJUSTMENT AND PROTECTION
A. On completion remove all waste and scraps from areas and rooms worked in, and from the job site, and inspect all installed bases for adjustments and repairs required. Provide a list of deficiencies to the Consultant / Flooring QA Inspector.
B. Remove excess adhesive from base and wall surfaces without causing damage.
END OF SECTION 09 65 00
| PART 1 - GENERAL |
| 1.1 Summary |
| A. Section includes all labor, materials, equipment, and services to supply and install resilient base to areas noted on drawings and schedules and as specified herein. This Section along with the drawings forms part of the Contract and is to be read... |
| 1.2 References |
| A. The latest edition of the Floor Covering Reference Manual issued by the National Floor Covering Association of Canada (NFCA) shall govern all materials and workmanship. Whenever reference is made within this specification to NFCA requirements it sh... |
| B. The latest applicable edition of the following reference standards shall also govern all materials and installation work specified herein as applicable: ASTM F1861, Standard Specification for Resilient Wall Base. |
| 1.3 SUBMITTALS |
| A. Submit manufacturer's product literature, technical data in both metric and imperial values verifying compliance with specification requirements, and full range of products and patterns / colors available with sample set for review / selection. |
| B. At project completion, submit a list of all materials installed, including adhesives, accessories and bases clearly indicating material and manufacturer's names, type / pattern / color name and numbers for Government's future reference. |
| C. At project completion submit manufacturer's maintenance data and cleaning instructions for type of resilient base installed. |
| 1.4 QUALITY ASSURANCE |
| A. All preparation, materials, and workmanship shall be in strict accordance with NFCA requirements and material manufacturer's written recommendations and detail requirements for conditions of work that apply and guarantee / warranty periods noted he... |
| B. Any preparation, materials, and workmanship that does not meet NFCA requirements shall be repaired or replaced in accordance with Quality Assurance requirements at no additional cost to the Government. |
| C. The flooring contractor shall be recommended by the manufacturer / supplier of the resilient base as qualified to install the resilient base. |
| 1.5 NFCA Quality Assurance Requirements Program (QAP) Inspection |
| A. The cost of the Quality Assurance Program (QAP), shall be included in the cost of the base work. Contact NFCA (www.nfca.ca) for clarifications prior to submitting a bid. QAP costs can be viewed in PART A04B of the NFCA Floor Covering Reference Manual. |
| B. All Work described in this Section is included under the Quality Assurance Program (QAP) of NFCA (National Floor Covering Association), as detailed in section PART A04 Quality. |
| C. Assurance Program in the latest (online) edition of the Floor Covering Reference Manual of Canada and will be reviewed in accordance with QAP requirements therein by an Inspection Agency assigned by the National Floor Covering Association (NFCA). |
| D. Any preparation, materials, and workmanship that do not meet NFCA requirements will be replaced in accordance with Quality Assurance requirements without any additional cost to the Government. |
| E. On award of contract, contact NFCA and request a QA Review Form complete and submit prior to ordering materials. |
| F. Qualification of installers performing all work shall meet the requirements detailed in PART A05 Trade Qualifications in the latest edition of the NFCA Floor Covering Reference Manual. |
| G. Installer Qualifications – The installer of the resilient base at the time of and through-out the performance of the work shall be a member in good standing of the National Floor Covering Association (NFCA) and referenced on the NFCA website (www.n... |
| 1.6 Regulatory and Environmental Requirements |
| A. Ensure that all materials, including adhesives and other accessory products, are environmentally safe and are not prohibited by any applicable laws, regulations, bylaws, ordinances or orders of any government authority. |
| B. Ensure that all employees are fully informed and comply, at all times with Workplace Hazardous Material Information System (WHMIS) requirements. |
| 1. Any adhesive and sealant used shall be low VOC materials and shall be conditioned on site to lessen off-gassing. |
| 1.7 DELIVERY, STORAGE, AND HANDLING |
| A. Deliver all materials (including adhesives and accessories) wrapped / sealed in original labelled and unopened packaging with type and pattern / color and registration numbers clearly marked on each roll, carton, or container |
| B. Prevent damage to and store all materials in strict accordance with manufacturer's written requirements in a secure dry space. |
| C. Deliver all materials to work areas when required and a minimum of 48 hours before installation to condition materials to site temperature and humidity conditions. |
| PART 2 - PRODUCTS |
| 2.1 Vinyl Base |
| A. 3 mm (1/8") thick x 102 mm (4") high top set extruded vinyl coved base compliant to ASTM F1861, Type TV , complete with pre-molded external and internal corners. |
| PART 3 - EXECUTION |
| 3.1 Installation Requirements |
| A. Review substrate, environmental conditions and work by other trades to ensure that they are in complete compliance with the manufacturer's recommended installation specification and NFCA Standard requirements prior to the installation of resilient ... |
| B. Ensure that paint, varnish, and oils not compatible with adhesives employed have been removed. |
| 3.2 PREPARATION |
| A. Verify that moisture and alkalinity testing has been done by General Contractor and field check ratings as required. |
| B. The type, location, condition and surface tolerances of substrate must be in complete accordance with NFCA requirements and resilient base manufacturer’s recommendations. |
| C. Fill substrate low spots, minor cracks, joints and holes with substrate filler to the extent required by scope of work and ensure substrates are free from all bumps, ridges and other imperfections. Feather filler as required to allow for difference... |
| D. Seal and prime substrate surfaces if recommended by flooring adhesive manufacturer's recommendations. |
| 3.3 INSTALLATION of Resilient Base |
| A. Provide resilient base to all areas with resinous flooring. |
| B. Install base where indicated on schedule in longest practical lengths (minimum 2400 mm (96") long) fitted tightly to floor and vertical surfaces (walls, columns, millwork, etc.). Scribe to door frames and other obstructions. |
| C. Fit base at exterior and interior corners in accordance with manufacturer’s recommendations and following: Provide matching pre-fabricated external corners that wrap around outside corners a minimum of 300 mm (12") and matching internal corners. |
| 3.4 Clean up, Adjustment and Protection |
| A. On completion remove all waste and scraps from areas and rooms worked in, and from the job site, and inspect all installed bases for adjustments and repairs required. Provide a list of deficiencies to the Consultant / Flooring QA Inspector. |
| B. Remove excess adhesive from base and wall surfaces without causing damage. |