B09_Att_(24)_REFERENCE_PrePropSiteVisitSignInSheet_0003.pdf

PDF 1 MB Posted

Attached to
HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation number
140P2026R0091
Issued by

About this file

This is a Sign-In Sheet for a federal contract solicitation hosted by the National Park Service Denver Service Center.

The document records attendance at a pre-bid meeting or site visit held on September 30, 2026, for Project HAVO 326181 titled "Replace Rainshed" at Hawaii Volcanoes National Park, Hawaii. The solicitation number is 140P2026R0091. Paul Shipak serves as the Project Specialist, Malissa Crofoot as the Contracting Officer, and Abigail Villarreal as the Contract Specialist, all with the NPS Denver Service Center located at 1 Denver Federal Center, Building 50, P.O. Box 25287, Denver, Colorado 80225-0287.

The sign-in sheet captures the names, companies, and email addresses of 20 attendees representing various contractors and construction firms interested in bidding on the replacement rainshed project. Represented companies include Sun Con Inc., Sade, Goodfellow Bros, Re-use Hawaii, Nan Inc., American Builders Inc., JD Painting, and Sun Construction, among others. The document notes that any questions asked on site will not change the solicitation and that contractors must submit all questions in writing.

View the file

Other files

File Type Posted
B09_Att_(21)_REFERENCE_Redwood-Water-Tank-Drawing_0003.pdf PDF
Sol_140P2026R0091_Amd_0003.pdf PDF
B09_Att_(23)_REFERENCE_2024TankInspectionReports_0003.pdf PDF
B09_Att_(16)_Pre-Proposal_RFI_Responses_0003.pdf PDF
B09_Att_(20)_REFERENCE_ElectricalAsBuiltDrawings_0003.pdf PDF
B09_Att_(18)_Spec-09-65-00_Resilient-Base_0003.pdf PDF
B09_Att_(17)_A-E-Technical-Addendum_0003.pdf PDF
B09_Att_(19)_Spec-09-67-23_Resinous-Flooring_0003.pdf PDF
B09_Att_(22)_REFERENCE_RedwoodTanks2018TripReport_0003.pdf PDF
Sol_140P2026R0091_Amd_0002.pdf PDF
B09_Att_(15)_HAVO_326181_-_Site_Walk_Requirements_30JUL2026_0001.pdf PDF
Sol_140P2026R0091_Amd_0001.pdf PDF
B08_Att_(13)_HAVO_326181_Final_CD_Basis_of_Design_Product_Files.pdf PDF
Sol_140P2026R0091.pdf PDF
B08_Att_(9)_Redwood_Water_Tanks_Trip_Rpt_and_Prelim_Treat_Recs__2018.pdf PDF
B08_Att_(12)_GenRefs.docx DOCX document
B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf PDF
B08_Att_(6)_HAER_HAVO_Water_Collection_System_HI-76__Final_report.pdf PDF
B08_Att_(3)_2024_08_26_-_Geotechnical_Data_Report_-_HAVO_Rainsheds_Shear_Wave_Velocity_Survey.pdf PDF
B08_Att_(8)_HAVO_326181_Construction_Phasing_Memo.pdf PDF
B08_Att_(14)_Hazardous_Material_Survey_HAVO_Rainshed_Enviroquest_May2025.pdf PDF
B08_Att_(2)_HAVO_326181_26_0908_Final_CD_Drawing_Set.pdf PDF
B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf PDF
B08_Att_(7)_HAVO_326181_Construction_Phasing_Calcs.xlsx XLSX spreadsheet
B08_Att_(10)_Davis-Bacon_Act_WD__HI20260001.pdf PDF
B08_Att_(11)_Solit_PSP_Vol_II_SubKPlan.docx DOCX document
B08_Att_(5)_HAER_Drawings_HAVO_Rainshed.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B09_Att (24) REFERENCE_PrePropSiteVisitSignInSheet 1 B09_Att (24) REFERENCE_PrePropSiteVisitSignInSheet 2

File details come from the government source that posted it. Updated .