B09_Att_(25)_Revised-RFI-102-Response_0004.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation number
140P2026R0091
Issued by

About this file

This is a Revised Request for Information (RFI) Response document for Solicitation 140P2026R0091, addressing the management and logistics of moving and protecting National Park Service (NPS) stored contents during the rehabilitation of the Rainshed & Water Treatment System at Hawaii Volcanoes National Park in Volcano, Hawaii. The response clarifies the contractor's and government's respective responsibilities regarding stored contents located under Buildings 43 and 241.

The NPS retains full responsibility for inventorying, packing, relocating, organizing, and returning NPS-owned stored contents, with the contractor not required to provide labor or equipment for these activities unless separately directed by the Contracting Officer. The contractor must treat procurement, delivery, placement, and utility connections for twelve temporary storage containers as an early preconstruction activity to be prioritized immediately following Notice to Proceed. Upon government acceptance and container availability, NPS will begin relocation of stored contents, with planning requiring up to eight weeks for the relocation period to occur concurrently with other preconstruction activities. The contractor must sequence work to minimize impacts from government relocation efforts, and demolition or other work requiring cleared areas beneath Buildings 43 and 241 shall not commence until the Contracting Officer confirms the area is available. The government may engage separate moving services to expedite relocation; however, contractors should not rely on such services and must maintain the eight-week planning duration in their proposals and schedules.

View the file

Other files

File Type Posted
Sol_140P2026R0091_Amd_0004.pdf PDF
B09_Att_(26)_Supplemental-Technical-Addendum_02_0004.xlsx XLSX spreadsheet
B09_Att_(21)_REFERENCE_Redwood-Water-Tank-Drawing_0003.pdf PDF
Sol_140P2026R0091_Amd_0003.pdf PDF
B09_Att_(24)_REFERENCE_PrePropSiteVisitSignInSheet_0003.pdf PDF
B09_Att_(23)_REFERENCE_2024TankInspectionReports_0003.pdf PDF
B09_Att_(16)_Pre-Proposal_RFI_Responses_0003.pdf PDF
B09_Att_(20)_REFERENCE_ElectricalAsBuiltDrawings_0003.pdf PDF
B09_Att_(18)_Spec-09-65-00_Resilient-Base_0003.pdf PDF
B09_Att_(17)_A-E-Technical-Addendum_0003.pdf PDF
B09_Att_(19)_Spec-09-67-23_Resinous-Flooring_0003.pdf PDF
B09_Att_(22)_REFERENCE_RedwoodTanks2018TripReport_0003.pdf PDF
Sol_140P2026R0091_Amd_0002.pdf PDF
B09_Att_(15)_HAVO_326181_-_Site_Walk_Requirements_30JUL2026_0001.pdf PDF
Sol_140P2026R0091_Amd_0001.pdf PDF
B08_Att_(13)_HAVO_326181_Final_CD_Basis_of_Design_Product_Files.pdf PDF
Sol_140P2026R0091.pdf PDF
B08_Att_(9)_Redwood_Water_Tanks_Trip_Rpt_and_Prelim_Treat_Recs__2018.pdf PDF
B08_Att_(12)_GenRefs.docx DOCX document
B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf PDF
B08_Att_(6)_HAER_HAVO_Water_Collection_System_HI-76__Final_report.pdf PDF
B08_Att_(3)_2024_08_26_-_Geotechnical_Data_Report_-_HAVO_Rainsheds_Shear_Wave_Velocity_Survey.pdf PDF
B08_Att_(8)_HAVO_326181_Construction_Phasing_Memo.pdf PDF
B08_Att_(14)_Hazardous_Material_Survey_HAVO_Rainshed_Enviroquest_May2025.pdf PDF
B08_Att_(2)_HAVO_326181_26_0908_Final_CD_Drawing_Set.pdf PDF
B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf PDF
B08_Att_(7)_HAVO_326181_Construction_Phasing_Calcs.xlsx XLSX spreadsheet
B08_Att_(10)_Davis-Bacon_Act_WD__HI20260001.pdf PDF
B08_Att_(11)_Solit_PSP_Vol_II_SubKPlan.docx DOCX document
B08_Att_(5)_HAER_Drawings_HAVO_Rainshed.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised RFI Response

HAVO 326181 – AMENDMENT 0004 – REVISED PRE-PROPOSAL RFI RESPONSE
Solicitation 140P2026R0091 | Rehabilitate Rainshed & Water Treatment System
RFI No.SubjectContract ReferenceQuestionRevised Government Response
102 - REVISEDMoving/Protecting NPS Stored Contents – REVISEDG11, Note 5; G12, Detail 2; Section 01 50 00, Temporary Storage ContainersThe documents require temporary/permanent containers but do not clearly establish who inventories, packs, moves, and returns the stored contents. Confirm whether NPS performs these moves or the Contractor must include labor, equipment, handling, and protection—and provide an inventory if Contractor handling is required. Also confirm the expected timeline for items to be moved from the building(s) into containers so that remediation and demolition can proceed.REVISED RESPONSE – This response supersedes the prior response to RFI 102 issued under Amendment 0003.

Refer also to RFIs 64 and 69. NPS will remain responsible for inventorying, packing, relocating, organizing, and returning NPS-owned stored contents located under Buildings 43 and 241.

The Contractor is not required to provide labor or equipment for moving NPS-owned contents unless separately directed by the Contracting Officer. The Contractor shall treat procurement, delivery, placement, and required utility connections for the twelve (12) temporary storage containers as an early preconstruction activity and shall prioritize this work following Notice to Proceed.

Upon Government acceptance and availability of the temporary storage containers, NPS will begin relocation of stored contents from Buildings 43 and 241. For proposal and scheduling purposes, assume Government relocation may require up to eight (8) weeks after the containers are available for NPS use.

The relocation period is intended to occur concurrently with Contractor preconstruction activities and other Work that does not require turnover of the affected areas. The Contractor shall sequence the Work to minimize impacts associated with Government relocation. Demolition or other Work requiring cleared areas beneath Buildings 43 and 241 shall not commence until the Contracting Officer confirms the applicable area is available to the Contractor.

The Government may utilize separate moving services to assist with and potentially expedite relocation; however, Offerors shall not rely on the availability of such services to reduce the eight-week planning duration.