SF 330 - Revised 7-21.pdf
PDF 407 KB Posted
- Attached to
- A&E Repair DDC Controls - HVAC FTQW 26-1104
- Solicitation number
- 26-1104
About this file
This document is a Standard Form 330 (SF 330), Architect-Engineer Qualifications form, revised in July 2021, used to evaluate and document a firm's capabilities for a specific contract opportunity. The multi-page form is designed to capture detailed information about a potential contractor's team, including key personnel qualifications, relevant project experience, and organizational structure. Section A through G provide comprehensive spaces for firms to demonstrate their professional competencies, including sections for contract-specific qualifications, proposed team composition, key personnel resumes, example projects that illustrate the team's capabilities, and a matrix showing key personnel's participation across different projects. The final sections (H and I) allow for additional information submission and require an authorized representative's signature, certifying the accuracy of the provided information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .