Self-Performed and Subcontracted Worksheet.docx

DOCX document 20 KB Posted

Attached to
Z1DA--554-26-105 Replace Damaged Windows at RMRVAMC (Const) (VA-26-00010269)
Solicitation number
36C25926R0028
Issued by

About this file

The provided document is a Self-Performed and Subcontracted Worksheet for a federal construction contract, specifically designed to ensure compliance with service-disabled veteran-owned small business (SDVOSB) participation requirements. The worksheet requires contractors bidding on general construction projects (NAICS code 236220) to allocate at least 15% of contract personnel costs to their own employees or eligible SDVOSB concerns, with a 25% requirement for specialty trade contracts.

The worksheet provides a detailed template for contractors to break down personnel and material costs by specification division, including sections for calculating self-performed work percentage. Contractors must document total personnel costs, subtract non-SDVOSB subcontractor costs, and demonstrate their self-performed work percentage. The document requires an authorized representative's signature certifying the accuracy of the information, and is associated with a Department of Veterans Affairs solicitation (36C25926R0028) for window replacement at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado.

View the file

Other files

File Type Posted
RFI 554-26-105 Replace Damaged Windows 1 14 2026.pdf PDF
36C25926R0028 0003.pdf PDF
RFI 554-26-105 Replace Damaged Windows 1 14 2026.docx DOCX document
Bldg K IBN_Tractel_As-Builts.pdf PDF
11 24 24-022_PSN_As-Builts_Tractel_Stamped_Calcs.pdf PDF
03.AS.102-B Bldg F.D fp2.pdf PDF
02.AS.201 Bldg B elv.pdf PDF
01.AS.302 Conc elv.pdf PDF
01.AS.101-D Conc partial fp2.pdf PDF
36C25926R0028 0002.docx DOCX document
Appendix A SOW - 554-26-105 Replace Damaged Windows-rev1.xlsx XLSX spreadsheet
Concourse CON_Tractel _Stamped_Calcs.pdf PDF
Bldg F 11 24 24-022_DAT_As-Builts_Tractel.pdf PDF
Bldg B RES_Tractel_Davit_Arms_As-Builts.pdf PDF
01.AS.304 Conc elv cont2.pdf PDF
Concourse CON_Tractel_As-Builts.pdf PDF
Bldg B RES_Tractel_Davit_Arms_Stamped_Calcs.pdf PDF
554-26-105 Replace Damaged Windows Sign-in sheet.pdf PDF
11 24 24-022_PSN_As Builts Tractel.pdf PDF
03.AS.202 - Bldg F to D Courtyard elv.pdf PDF
01.AS.101-C Conc partial fp1.pdf PDF
Site Visit document.docx DOCX document
Bldg K IBN_Stamped_Calcs.pdf PDF
Bldg F 11 24 24-022_DAT_As-Builts_Tractel_Stamped_Calcs.pdf PDF
03.AS.102-A Bldg F.D fp1.pdf PDF
01.AS.303 Conc elv cont1.pdf PDF
Instructions to Offerors.docx DOCX document
36C25926R0028 0001.docx DOCX document
RFR - 554-26-105 Replace Damaged Windows at RMRVAMC.pdf PDF
Past Performance Questionnaire_Blank.docx DOCX document
Prime and Sub Contractor Construction Breakdown.xlsx XLSX spreadsheet
Appendix A SOW - 554-26-105 Replace Damaged Windows.xlsx XLSX spreadsheet
ICRA- 554-26-105 Replace Damaged Windows.pdf PDF
852.219-75 LOS Certification.docx DOCX document
36C25926R0028.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division and name
SDVOSB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$__________________
4. Self-performed work = Line 3/Line 1 x 100 =________________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .