Appendix A SOW - 554-26-105 Replace Damaged Windows.xlsx

XLSX spreadsheet 10 MB Posted

Attached to
Z1DA--554-26-105 Replace Damaged Windows at RMRVAMC (Const) (VA-26-00010269)
Solicitation number
36C25926R0028
Issued by

About this file

This document is an Appendix A Statement of Work (SOW) detailing window replacement specifications for the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The comprehensive replacement project involves 20 windows and 4 doors across multiple building locations, including specific rooms like K1-224, F1-249, B2-121B, and various corridors and vestibules. The windows vary in size, ranging from 34"x66" to 84"x124", and include specifications such as 1 1/4" low-e insulated glass, 7/16" laminated spandrel, and 9/16" clear laminated types.

The project requires careful coordination with medical facility operations to minimize disruption, with specific points of contact including Tina Collins, Maintenance Staff, and Pam Rice. Contractors must validate window types with the Contracting Officer's Representative (COR) before ordering and adhere to strict safety requirements, including having a Competent Person with a 30-hour OSHA card on-site and ensuring all employees have at least 10-hour OSHA construction safety training certificates. The work must conform to VA standards, OSHA regulations, AIA Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes.

View the file

Other files

File Type Posted
RFI 554-26-105 Replace Damaged Windows 1 14 2026.pdf PDF
36C25926R0028 0003.pdf PDF
Appendix A SOW - 554-26-105 Replace Damaged Windows-rev1.xlsx XLSX spreadsheet
Concourse CON_Tractel _Stamped_Calcs.pdf PDF
Bldg F 11 24 24-022_DAT_As-Builts_Tractel.pdf PDF
Bldg B RES_Tractel_Davit_Arms_As-Builts.pdf PDF
01.AS.304 Conc elv cont2.pdf PDF
RFI 554-26-105 Replace Damaged Windows 1 14 2026.docx DOCX document
Bldg K IBN_Tractel_As-Builts.pdf PDF
11 24 24-022_PSN_As-Builts_Tractel_Stamped_Calcs.pdf PDF
03.AS.102-B Bldg F.D fp2.pdf PDF
02.AS.201 Bldg B elv.pdf PDF
01.AS.302 Conc elv.pdf PDF
01.AS.101-D Conc partial fp2.pdf PDF
36C25926R0028 0002.docx DOCX document
Site Visit document.docx DOCX document
Bldg K IBN_Stamped_Calcs.pdf PDF
Bldg F 11 24 24-022_DAT_As-Builts_Tractel_Stamped_Calcs.pdf PDF
03.AS.102-A Bldg F.D fp1.pdf PDF
01.AS.303 Conc elv cont1.pdf PDF
Concourse CON_Tractel_As-Builts.pdf PDF
Bldg B RES_Tractel_Davit_Arms_Stamped_Calcs.pdf PDF
554-26-105 Replace Damaged Windows Sign-in sheet.pdf PDF
11 24 24-022_PSN_As Builts Tractel.pdf PDF
03.AS.202 - Bldg F to D Courtyard elv.pdf PDF
01.AS.101-C Conc partial fp1.pdf PDF
Instructions to Offerors.docx DOCX document
36C25926R0028 0001.docx DOCX document
Past Performance Questionnaire_Blank.docx DOCX document
Prime and Sub Contractor Construction Breakdown.xlsx XLSX spreadsheet
Self-Performed and Subcontracted Worksheet.docx DOCX document
RFR - 554-26-105 Replace Damaged Windows at RMRVAMC.pdf PDF
852.219-75 LOS Certification.docx DOCX document
36C25926R0028.docx DOCX document
ICRA- 554-26-105 Replace Damaged Windows.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Item #Room NumberGlass size / DescriptionNotesICRA notesPOC
1K1-224 - Rehab Gym38"x98" - 1 1/4" low-e, insulatedbiomed move equipment?Tina Collins
2K1-224 - spandrel38"x98" - 7/16" laminated spandrelTina Collins
3K1-13748"x96" - 7/16" laminated spandrelTina Collins
4F1/H1 Corridor48"x66" - 1 1/4" low-e, insulatedTina Collins / Maint Staff
5F1/H1 Corridor47"x65" - 1 1/4" low-e, insulatedTina Collins / Maint Staff
6H1-11747"x95" - 1 1/4" low-e, insulatedTina Collins
7CON/H2 Interior door42"x 99" - 1/2"Lam Glass dooruse existing hardware?Maint Staff
8CON @ H2 hall glass72"x118" 9/16" frosted/laminatedovernight/after hoursMaint Staff
9CON/H3 Interior door42"x 99" - 1/2"Lam Glass dooruse existing hardware?Maint Staff
10CON /F3 - top pane84"x84" 9/16" frosted/laminatedovernight/after hoursMaint Staff
11F1-24947"x89" - 1 1/4" low-e, insulated
12F1-249 - spandrel48"x124" - 7/16" laminated spandrel
13CON L2 @ Bldg B - top36"x120" - 1 1/4" low-e, insulatedMaint Staff
14CON L2 @ Bldg B - bottom48"x54" - 1 1/4" low-e, insulatedMaint Staff
15B2-121B (#1)84"x72" - 1 1/4" low-e, insulatedSolar TubesPam Rice?
16B2-121B (#2)84"x72" - 1 1/4" low-e, insulatedSolar TubesPam Rice?
17B2-121B (#3)84"x72" - 1 1/4" low-e, insulatedSolar TubesPam Rice?
18CON @ Colfax vestibule66"x34" - 1 1/4" low-e, insulatedMaint Staff
19A1-201 Door8' storefront door Lam/Low-e
20A4-2098' storefront door Lam/Low-e
21D2 courtyard @ D2-10548"x96" - 1 1/4" low-e, insulated
22PSN NE Stair @ L3-449"x120" - 9/16 clear laminatedMaint Staff
23PSN Elev Lobby45"x108" - 9/16 clear laminatedMaint Staff
24Ped Bridge52"x80" (irregular) - 9/16 clear laminatedAbove 17th Ave - closure necessary?Maint Staff

image1.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image2.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png

File details come from the government source that posted it. Updated .