Revision History
| Editor | Tab Title | Revision Note |
| NASA | Form 1 | Customer Service Requests and Direct Buys for CLIN 0X2 was revised from $7,000,000 to $4,500,000. |
| NASA | Form 2A-2F | Inserted data validation formula to allow for drop down boxes in columns A-F. |
| NASA | Form 3A and 3A1-A4 | Inserted data validation formula to allow for drop down boxes in columns A and B. |
| NASA | Form 3B and 3B1-4 | Inserted data validation formula to allow for drop down boxes in columns A and B. |
| NASA | Form 4 | **All indirect data shall be linked to the supporting form (5a, 5b, etc.), References to Form 5 were updated to Form 4. |
| NASA | Form 1 | Incentive Fee and Profit calculation lines moved upward in the sheet as to not calculate fee on ODCs. |
Data for Drop Down Lists
| This Attachment contains Source Selection Information. See FAR 3.104. |
| Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) |
| Data for Drop Down Lists |
| Prime Offeror: |
| Submitting Offeror (if different): |
| Instructions: |
| (1) This tab provides data to other tabs within the model via drop down listings. |
| (2) Tab is to be completed by Prime and Major Subcontractors. |
| (3) Columns requiring Offeror input are highlighted in green. |
| (4) Offeror to enter all labor categories used in support of their approach in column B, and then enter the applicable labor classification of Straight Time (ST) or Overtime (OT) in Column D, as well as labor status for fringe purposes in column E. Labor Status language is example only, and the Offeror should update with language to maintain compliance with their estimating practices and accounting system requirements. |
| (5) Column C (NASA Centers) and the remaining PWS columns should remain unchanged. |
| Offeror | Labor Category Title | NASA Centers | Labor Classification | Labor Status | PWS 1.0 | PWS 2.0 | PWS 3.0 | PWS 4.0 | PWS 5.0 | PWS 6.0 | PWS 7.0 |
| Prime | Labor Category 1 | SSC | ST | Exempt | 1.1 | 2.1 | 3.1 | 4.1 | 5.1 | 6.1 | 7 |
| Major SubK1 | Labor Category 2 | MAF | OT | SCA | 1.2 | 2.2 | 3.2 | 4.2 | 5.2 | 6.2 | |
| Major SubK 2 | Labor Category 3 | | | CBA | 1.3 | 2.3 | 3.3 | 4.3 | 5.3 | 6.3 | |
| Major SubK3 | | | | | 1.4 | 2.4 | 3.4 | 4.4 | 5.4 | 6.4 | |
| Minor SubK1 | | | | | 1.5 | 2.5 | | 4.5 | 5.5 | | |
| Minor SubK2 | | | | | | 2.6 | | 4.6 | 5.6 | | |
| | | | | | 2.7 | | | 5.7 | | |
| | | | | | 2.8 | | | | | |
| | | | | | 2.9 | | | | | |
CLIN Summary
| This Attachment contains Source Selection Information. See FAR 3.104. |
| Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) |
| CLIN Summary |
| Prime Offeror: |
| Submitting Offeror (if different): |
| CLIN 000X | Phase-In | $ - 0 |
| CLIN 101 | | $ - 0 |
| CLIN 102 | | $ 7,000,000 |
| CLIN 201 | | $ - 0 |
| CLIN 202 | | $ 7,000,000 |
| CLIN 301 | | $ - 0 |
| CLIN 302 | | $ 14,000,000 |
| CLIN 401 | | $ - 0 |
| CLIN 402 | | $ 14,000,000 |
| CLIN 501 | | $ - 0 |
| CLIN 502 | | $ 14,000,000 |
| CLIN X01 | | $ - 0 |
| CLIN X02 | | $ 4,500,000 |
| IDIQ MAX | | $ 444,000,000 |
| Total Evaluated Price | | $ 504,500,000 |
| Instructions: |
| (1) Form to be completed by Prime Offeror Only. |
| (2) All data flows from other worksheets. Confirm accuracy of formulas. |
Form 1 - Proposed Effort Detail
| This Attachment contains Source Selection Information. See FAR 3.104. | | |
| RFP 80SSC024R0004 Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) | | |
| Form 1 - Proposed Effort Detail | | |
| Prime Offeror: | | |
| Submitting Offeror (if different): | | |
| | Base Period | |
| 7/1/2025-9/30/2026 | | | Option Period 1 |
| 10/1/2026-9/30/2027 | | | Option Period 2 |
| 10/1/2027-9/30/2029 | | | Option Period 3 |
| 10/1/2029-9/30/2031 | | | Option Period 4 |
| 10/1/2031-9/30/2033 | | | Option to Extend |
10/01/2033-04/01/2034
| Cost Element | Phase In | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | CLIN 101 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 3& 5 | | | CLIN 102 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 1, 2, 4, 6, &7 | | | CLIN 201 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 3& 5 | | | CLIN 202 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 1, 2, 4, 6, &7 | | | CLIN 301 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 3& 5 | | | CLIN 302 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 1, 2, 4, 6, &7 | | | CLIN 401 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 3& 5 | | | CLIN 402 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 1, 2, 4, 6, &7 | | | CLIN 501 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 3& 5 | | | CLIN 502 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 1, 2, 4, 6, &7 | | | CLIN X01 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 3& 5 | | | CLIN X02 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| PWS 1, 2, 4, 6, &7 | | | Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | Hours | Rate | Price | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | $ |
| Direct Labor Hours | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Phase In - Offeror Developed | 0 | | $0 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Program Management - Offeror Developed | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Significant Subcontractor 1 | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Significant Subcontractor 2 | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Significant Subcontractor 3 | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Non-Significant Subcontractor 1 | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Subtotal - Subcontractors | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Subtotal - Program Management - Offeror Developed | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 |
| Non-Management - Offeror Developed | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Prime | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Significant Subcontractor 1 | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Significant Subcontractor 2 | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Significant Subcontractor 3 | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Non-Significant Subcontractor 1 | | | | | | | | | | | | | | | | | | | | | | | | | 0 | $0 |
| Subtotal - Subcontractors | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 |
| Subtotal - Non-Management - Offeror Developed | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 |
Subtotal - Burdened Labor Costs 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0
| Incentive Fee (Max) | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | $0 |
| Profit | | | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | $0 |
| Other Direct Costs | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| | | | | | | | | | | | | | | | | | | | | | | | | | | $0 |
| Service Requests and Direct Buys (Govt Provided, do not alter) | | | | | | $7,000,000 | | | | $7,000,000 | | | | $14,000,000 | | | | $14,000,000 | | | | $14,000,000 | | | | $4,500,000 | $60,500,000 |
| Material & Handling (if applicable) | 0.00% | | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | $0 |
| Subtotal - ODCs | | $0 | | $0 | | $7,000,000 | | $0 | | $7,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $4,500,000 | $60,500,000 |
| Subtotal - Other Costs | | $0 | | $0 | | $7,000,000 | | $0 | | $7,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $4,500,000 | $60,500,000 |
| G&A - Other Costs | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | 0.00% | $0 | $0 |
| Subtotal | | $0 | | $0 | | $7,000,000 | | $0 | | $7,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $4,500,000 | $60,500,000 |
| FCCOM | 0.00% | $0 | 0.00% | | 0.00% | | 0.00% | | 0.00% | | 0.00% | | 0.00% | | 0.00% | | 0.00% | | 0.00% | | 0.00% | | 0.00% | | 0.00% | | $0 |
| Total Cost | | $0 | | $0 | | $7,000,000 | | $0 | | $7,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $4,500,000 | $60,500,000 |
| Total Cost + Profit/Fee | | $0 | | $0 | | $7,000,000 | | $0 | | $7,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $14,000,000 | | $0 | | $4,500,000 | $60,500,000 |
IDIQ MAX (Govt. Provided, do not alter) $80,727,273 $80,727,273 $80,727,273 $80,727,273 $80,727,273 $40,363,636 $444,000,000
TOTAL (Total Evaluated Price) $0 $0 $87,727,273 $0 $87,727,273 $0 $94,727,273 $0 $94,727,273 $0 $94,727,273 $0 $44,863,636 $504,500,000
| Instructions: |
| (1) Form to be completed by Prime Offeror only. |
| (2) Tab should auto calculate based on information from supporting tabs, confirm accuracy of formulas. |
| (3) Add rows as necessary to accommodate rate structure. |
| (4) All rates should link to source within the Cost Forms. G&A and Other Rates shall link from Form 4 - Indirect & Other Rates. All figures and formulas shall be active formulas, hard coded figures are not to be present (with the exception of Government provided figures). |
Form 2 -Summary Hrs & WYEs
| This Attachment contains Source Selection Information. See FAR 3.104. |
| Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) |
| Form 2 -Summary Hrs & WYEs |
| Prime Offeror: |
| Submitting Offeror (if different): |
All Data should be linked to flow from Form 2.1 and 2.2.
| Base Period, CLIN 101 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL BP1, CLIN 101 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Base Period, CLIN 102 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL BP1, CLIN 102 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option Period 1, CLIN 201 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY2 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP1, CLIN 201 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option Period 1, CLIN 202 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY3 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP1, CLIN 202 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option Period 2, CLIN 301 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY4 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP2, CLIN 301 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option Period 2, CLIN 302 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY4 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP2, CLIN 302 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option Period 3, CLIN 401 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY4 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP3, CLIN 401 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option Period 3, CLIN 402 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY4 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP3, CLIN 402 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option Period 4, CLIN 501 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY4 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP4, CLIN 501 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option Period 4, CLIN 502 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY4 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP4, CLIN 502 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option to Extend, CLIN X01 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY4 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OTE, CLIN X01 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| Option to Extend, CLIN X02 - Program & Non-Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | OY4 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OTE, CLIN X02 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
Form 2.1 -Prog Mgmt Summary
| This Attachment contains Source Selection Information. See FAR 3.104. |
| Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) |
| Form 2.1 -Prog Mgmt Summary |
| Prime Offeror: |
| Submitting Offeror (if different): |
All PROGRAM MANAGEMENT HOURS should be linked to flow from Detail Form 2s (i.e. 2a, 2B, etc.).
| CLIN 101 | Base Period, CLIN 101 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL BP1, CLIN 101 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 102 | Base Period, CLIN 102 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL BP1, CLIN 102 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 201 | Option Period 1, CLIN 201 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP1, CLIN 201 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 202 | Option Period 1, CLIN 202 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP1, CLIN 202 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 301 | Option Period 2, CLIN 301 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP2, CLIN 301 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 302 | Option Period 2, CLIN 302 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP2, CLIN 302 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 401 | Option Period 3, CLIN 401 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP3, CLIN 401 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 402 | Option Period 3, CLIN 402 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP3, CLIN 402 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 501 | Option Period 4, CLIN 501 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP4, CLIN 501 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN 502 | Option Period 4, CLIN 502 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OP4, CLIN 502 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN X01 | Option to Extend, CLIN X01 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal SSC | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| 1.0 Contract Management | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 6.0 Facility Operations and Maintenance | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 7.0 Environmental Services and Program Management (IDIQ Only, MAF Only) | MAF | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| SubTotal MAF | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| TOTAL OTE, CLIN X01 | | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | 0.00 | 0 | $0 | | |
| CLIN X02 | Option to Extend, CLIN X02 - Program Management Hours | | Offeror | | | Major SubK1 | | | Major SubK2 | | | Major SubK3 | | | Minor SubK1 | | | BY1 Total | | | Check Total | |
| Prime, Major, and Minor Subcontractors | CENTER | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | WYEs | Hours | Cost | Hours | Difference |
| 1.0 Contract Management | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 2.0 Logistics | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 3.0 Safety, Health, and Environmental Compliance | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 4.0 Engineering and Manufacturing Support Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
| 5.0 Site Services | SSC | | | | | | | | | | | | | | | | 0.00 | 0 | $0 | | |
This is the start of the file's text. The full file is on GovTribe.