About this file

This is a Source Selection Statement detailing the evaluation and award decision for the Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) at NASA's Stennis Space Center and Marshall Space Flight Center's Michoud Assembly Facility. The contract is a follow-on to the SACOM contract, structured as a hybrid contract with Cost-Plus-Incentive Fee, Firm Fixed Price, and IDIQ components for an 8-year, 3-month period (15-month base period from July 2025-September 2026, one 1-year option, three 2-year options, plus 90 days phase-in).

Three proposals were received and evaluated: Nova Space Solutions LLC (NSS), Syncom Space Services (S3), and Akima KBR Solutions LLC (AKS). The evaluation was based on Mission Suitability (weighted 1000 points), Past Performance, and Cost/Price factors. NSS received the highest Mission Suitability score of 961 points and proposed the lowest cost at $822.7M. After detailed evaluation of all factors, NSS was selected for award as representing the best value to the Government, despite AKS scoring slightly higher in Mission Suitability (972 points) but proposing the highest cost. The contract scope includes core service operations and IDIQ requirements across Contract Management, Logistics, Safety, Health and Environmental Compliance, Engineering and Manufacturing Support Services, Site Services, Facility Operations & Maintenance Services, and Environmental Services and Program Management.

View the file

Other files

File Type Posted
SSC COSMIC Industry Day_sign in sheet.pdf PDF
80SSC024R0004P00002 SF30.pdf PDF
Section B-M P00002 Change page.pdf PDF
MAF COSMIC Industry Day__sign in sheet.pdf PDF
ATTACHMENT J-4 SCA and CBA P00002.pdf PDF
Attachment J-1 PWS Change Pages.pdf PDF
Attachment J-9 GFP.pdf PDF
Attachment J-2 DRDs.pdf PDF
RFP 80SSC024R0004 Q and As.pdf PDF
Sections B-M P00001 Change Pages.pdf PDF
80SSC024R0004P00001 SF30.pdf PDF
Attachment J-1 Appendix E System Descriptions.pdf PDF
Attachment J-1 Appendix C - Acronyms and Definitions.pdf PDF
Section L Attachment C - Staffing Plan Worksheet.pdf PDF
Attachment J-9 COSMIC GFP.pdf PDF
Attachment J-1 App A (File 1b of 2) WLI and Bldgs - 3-21-24(1).pdf PDF
Attachment J-1 Appendix D - Qualifications and Certifications.pdf PDF
Attachment J-1 App A (File 2 of 2) ASSETS.pdf PDF
Final RFP 80SSC024R00024 CO Cover Letter.pdf PDF
Standard Form 33 80SSC024R0004.pdf PDF
Attachment J-2 DRDs - COSMIC.pdf PDF
Attachment J-1 App A (File 1a of 2) Mow 3-21-24.pdf PDF
RFP 80SSC024R0004 SECTIONS B-M.pdf PDF
ATTACHMENT J-5 SB PLAN.pdf PDF
Section L Attachment B Small Business Subcontracting Plan Goals.pdf PDF
Attachment J-1 PWS.pdf PDF
ATTACHMENT J-8 Phase-in Plan.pdf PDF
ATTACHMENT J-7 Reference Library.pdf PDF
Section L Attachment A Past Performance Questionnaire.pdf PDF
ATTACHMENT J-1 Appendix B IDIQ Rates.pdf PDF
Section L Attachment 1 Cost Forms Final.xlsx XLSX spreadsheet
Attachment J-6 Government Comparable Rates.pdf PDF
DRFP Questions and Answers.pdf PDF
ATTACHMENT J-4 SCA and CBA.pdf PDF
ATTACHMENT J-3 Incentive Plan.pdf PDF
ATTACHMENT J-10 CONTRACTORS PROPOSAL.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOHN

BAILEY

Digitally signed by JOHN

BAILEY

Date: 2024.11.22 14:19 21 -06'00'

File details come from the government source that posted it. Updated .