About this file

This document is an amendment (SF30) to the Request for Proposal (RFP) for the Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) at John C. Stennis Space Center (SSC) and Michoud Assembly Facility (MAF). The amendment provides clarification and incorporates a revised Collective Bargaining Agreement (CBA) for the UAW Local 1921 at MAF. Key details include:

  1. The duration allotted for oral presentations is 90 minutes, not 60 minutes as previously stated.
  2. The proposal due date was changed in a previous amendment, but the date was not updated in the RFP. The amendment updates the proposal due date on page 22 of the RFP.
  3. A revised CBA for the UAW Local 1921 at MAF, dated May 6, 2024 through May 5, 2026, is incorporated and replaces the previous version.
  4. The Government will not respond to any questions received after the due date.
  5. All other terms and conditions remain the same.

View the file

Other files

File Type Posted
SSS.pdf PDF
SSC COSMIC Industry Day_sign in sheet.pdf PDF
Section B-M P00002 Change page.pdf PDF
MAF COSMIC Industry Day__sign in sheet.pdf PDF
ATTACHMENT J-4 SCA and CBA P00002.pdf PDF
Attachment J-1 PWS Change Pages.pdf PDF
Attachment J-9 GFP.pdf PDF
Attachment J-2 DRDs.pdf PDF
RFP 80SSC024R0004 Q and As.pdf PDF
Sections B-M P00001 Change Pages.pdf PDF
80SSC024R0004P00001 SF30.pdf PDF
Attachment J-1 Appendix E System Descriptions.pdf PDF
Attachment J-1 Appendix C - Acronyms and Definitions.pdf PDF
Section L Attachment C - Staffing Plan Worksheet.pdf PDF
Attachment J-9 COSMIC GFP.pdf PDF
Attachment J-1 App A (File 1b of 2) WLI and Bldgs - 3-21-24(1).pdf PDF
Attachment J-1 Appendix D - Qualifications and Certifications.pdf PDF
Attachment J-1 App A (File 2 of 2) ASSETS.pdf PDF
Final RFP 80SSC024R00024 CO Cover Letter.pdf PDF
Standard Form 33 80SSC024R0004.pdf PDF
Attachment J-2 DRDs - COSMIC.pdf PDF
Attachment J-1 App A (File 1a of 2) Mow 3-21-24.pdf PDF
RFP 80SSC024R0004 SECTIONS B-M.pdf PDF
ATTACHMENT J-5 SB PLAN.pdf PDF
Section L Attachment B Small Business Subcontracting Plan Goals.pdf PDF
Attachment J-1 PWS.pdf PDF
ATTACHMENT J-8 Phase-in Plan.pdf PDF
ATTACHMENT J-7 Reference Library.pdf PDF
Section L Attachment A Past Performance Questionnaire.pdf PDF
ATTACHMENT J-1 Appendix B IDIQ Rates.pdf PDF
Section L Attachment 1 Cost Forms Final.xlsx XLSX spreadsheet
Attachment J-6 Government Comparable Rates.pdf PDF
DRFP Questions and Answers.pdf PDF
ATTACHMENT J-4 SCA and CBA.pdf PDF
ATTACHMENT J-3 Incentive Plan.pdf PDF
ATTACHMENT J-10 CONTRACTORS PROPOSAL.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80SSC024R0004P00002

SF30 Block 14 Continued:

The purpose of this amendment is to provide offerors with clarification and to incorporate the revised Collective Bargaining Agreement (CBA) for the UAW Local 1921 at MAF.

1. The answer to question #98 referenced (60 minutes) as the duration allotted for oral presentations, this referenced time was incorrect. IAW Section L.II(c)(6), the duration the Offeror has allotted for oral presentations is 90 minutes.

2. The proposal due date was changed in amendment 80SSC024R0004P00001, as indicated by the block checked in box 11 of the SF30, as stated in #4 on the continuation page of the SF30 and by the ‘Updated Date Offers Due’ date in SAM.gov. The Government however did not update the date on page 22 of 55 in Section L of the RFP. For clarity and consistency, the proposal due is updated on page 22 of 55 in Section L to reflect the change incorporated by amendment 80SSC024R0004P00001. The change page is attached.

3. A fully executed CBA was received by the Government on 5/21/2024. The Attachment J-4 SCA and CBA is hereby deleted and replaced with the revised Attachment J-4 SCA and CBA, which includes a revised CBA for the UAW Local 1921 at MAF, dated May 6, 2024 through May 5, 2026. The revision to the above-mentioned CBA affects Attachment J-4, Appendix B, File 1 and File 3. File 3, a MOU, has been incorporated into the revised CBA.

4. The due date for questions to the RFP has passed. The Government will not respond to questions received after the due date.

5. All other terms and conditions remain the same.

File details come from the government source that posted it. Updated .