80SSC024R0004P00002 SF30.pdf
PDF 252 KB Posted
- Solicitation number
- 80SSC024R0004
About this file
This document is an amendment (SF30) to the Request for Proposal (RFP) for the Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) at John C. Stennis Space Center (SSC) and Michoud Assembly Facility (MAF). The amendment provides clarification and incorporates a revised Collective Bargaining Agreement (CBA) for the UAW Local 1921 at MAF. Key details include:
- The duration allotted for oral presentations is 90 minutes, not 60 minutes as previously stated.
- The proposal due date was changed in a previous amendment, but the date was not updated in the RFP. The amendment updates the proposal due date on page 22 of the RFP.
- A revised CBA for the UAW Local 1921 at MAF, dated May 6, 2024 through May 5, 2026, is incorporated and replaces the previous version.
- The Government will not respond to any questions received after the due date.
- All other terms and conditions remain the same.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80SSC024R0004P00002
SF30 Block 14 Continued:
The purpose of this amendment is to provide offerors with clarification and to incorporate the revised Collective Bargaining Agreement (CBA) for the UAW Local 1921 at MAF.
1. The answer to question #98 referenced (60 minutes) as the duration allotted for oral presentations, this referenced time was incorrect. IAW Section L.II(c)(6), the duration the Offeror has allotted for oral presentations is 90 minutes.
2. The proposal due date was changed in amendment 80SSC024R0004P00001, as indicated by the block checked in box 11 of the SF30, as stated in #4 on the continuation page of the SF30 and by the ‘Updated Date Offers Due’ date in SAM.gov. The Government however did not update the date on page 22 of 55 in Section L of the RFP. For clarity and consistency, the proposal due is updated on page 22 of 55 in Section L to reflect the change incorporated by amendment 80SSC024R0004P00001. The change page is attached.
3. A fully executed CBA was received by the Government on 5/21/2024. The Attachment J-4 SCA and CBA is hereby deleted and replaced with the revised Attachment J-4 SCA and CBA, which includes a revised CBA for the UAW Local 1921 at MAF, dated May 6, 2024 through May 5, 2026. The revision to the above-mentioned CBA affects Attachment J-4, Appendix B, File 1 and File 3. File 3, a MOU, has been incorporated into the revised CBA.
4. The due date for questions to the RFP has passed. The Government will not respond to questions received after the due date.
5. All other terms and conditions remain the same.
File details come from the government source that posted it. Updated .