About this file

This document is a SF30 amendment for solicitation 80SSC024R0004, the Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) at John C. Stennis Space Center (SSC) and Marshall Space Flight Center's (MSFC) Michoud Assembly Facility (MAF). The purpose of this amendment is to respond to industry questions and provide updates to the Request for Proposal (RFP). The amendment identifies the specific sections and pages that have been updated, including changes to the Performance Work Statement (PWS) and Data Requirements Deliverables (DRDs). The proposal due date has been extended to June 11, 2024, and the oral presentation due date has been extended to June 17, 2024. This amendment also adds several additional documents to the eLibrary, including a Mowing Map, Maximo Functional Use Document, and SSC Industry Day 2 Notes. All other terms and conditions remain the same.

View the file

Other files

File Type Posted
SSS.pdf PDF
SSC COSMIC Industry Day_sign in sheet.pdf PDF
80SSC024R0004P00002 SF30.pdf PDF
Section B-M P00002 Change page.pdf PDF
MAF COSMIC Industry Day__sign in sheet.pdf PDF
ATTACHMENT J-4 SCA and CBA P00002.pdf PDF
Attachment J-1 PWS Change Pages.pdf PDF
Attachment J-9 GFP.pdf PDF
Attachment J-2 DRDs.pdf PDF
RFP 80SSC024R0004 Q and As.pdf PDF
Sections B-M P00001 Change Pages.pdf PDF
Attachment J-1 Appendix E System Descriptions.pdf PDF
Attachment J-1 Appendix C - Acronyms and Definitions.pdf PDF
Section L Attachment C - Staffing Plan Worksheet.pdf PDF
Attachment J-9 COSMIC GFP.pdf PDF
Attachment J-1 App A (File 1b of 2) WLI and Bldgs - 3-21-24(1).pdf PDF
Attachment J-1 Appendix D - Qualifications and Certifications.pdf PDF
Attachment J-1 App A (File 2 of 2) ASSETS.pdf PDF
Final RFP 80SSC024R00024 CO Cover Letter.pdf PDF
Standard Form 33 80SSC024R0004.pdf PDF
Attachment J-2 DRDs - COSMIC.pdf PDF
Attachment J-1 App A (File 1a of 2) Mow 3-21-24.pdf PDF
RFP 80SSC024R0004 SECTIONS B-M.pdf PDF
ATTACHMENT J-5 SB PLAN.pdf PDF
Section L Attachment B Small Business Subcontracting Plan Goals.pdf PDF
Attachment J-1 PWS.pdf PDF
ATTACHMENT J-8 Phase-in Plan.pdf PDF
ATTACHMENT J-7 Reference Library.pdf PDF
Section L Attachment A Past Performance Questionnaire.pdf PDF
ATTACHMENT J-1 Appendix B IDIQ Rates.pdf PDF
Section L Attachment 1 Cost Forms Final.xlsx XLSX spreadsheet
Attachment J-6 Government Comparable Rates.pdf PDF
DRFP Questions and Answers.pdf PDF
ATTACHMENT J-4 SCA and CBA.pdf PDF
ATTACHMENT J-3 Incentive Plan.pdf PDF
ATTACHMENT J-10 CONTRACTORS PROPOSAL.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80SSC024R0004P0001

SF30 Block 14 Continued:

1. The purpose of this amendment is to respond to questions and comments received from industry by the questions due date of May 2, 2024. The questions and answers are attached to this amendment and titled, RFP 80SSC024R0004 Q&As.

2. All pages with edits made in response to questions are identified below. In addition, minor clerical corrections have been made to numbering in the Attachment J-1, Performance Work Statement and Attachment J-2, Data Requirement Deliverables, these edits are unmarked, as they are considered minor clerical corrections.

a. The following pages in the document titled “RFP 80SSC024R0004 Section B-M” have been deleted and replaced with the attached pages.

Section H, Page 23 of 23 Section L, Pages 22, 24, 25, and 28 of 55

The text of each change on the page is in red font and a change bar is in the margin to identify the line.

b. The following pages in the document titled “Attachment J-1 PWS” have been deleted and replaced with the attached pages.

Pages 70, 85, 86, 177, 244, 285, 354, 356 and 359 of 371.

The text of each change on the page is in red font and a change bar is in the margin to identify the line. In the case of no red font and a change bar, like on page 177 and 354, text was deleted. If needed, refer to the original page of the

PWS.

c. The document titled “Attachment J-2 DRDs – COSMIC” is deleted and replaced in its entirety with the attached, Attachment J-2 DRDs. DRD OH04-5.4, which is IDIQ only/MAF only, was omitted from the original J-2 and has been added. The numbering of some DRDs were discovered to be inconsistent with the numbering identified in the PWS, the DRD numbers were edited to be consistent with PWS reference. Also, the Submission Frequency of the DRD submittal was spelled out in areas where an abbreviation was previously used.

d. The document titled “Attachment J-9 COSMIC GFP” is deleted and replaced in its entirety with the attached, Attachment J-9 COSMIC GFP. Additional Special Purpose Mobile Equipment (SPME) at SSC has been identified therefore removed from List 1 and added to List 4b.

e. The following documents or information have been added to the eLibrary:

• MCP 1040.4, MSFC/MAF Preparedness and Contingency Plan

• MAF-PLAN-0001-E, MAF Management Plan

80SSC024R0004P0001

• Attachment J-1, Appendix A - SSC Mowing Map (can be enlarged)

• Maximo Functional Use Document

• SSC Industry Day 2 – Notes

• Section L Attachment A Past Performance Questionnaire (L.I-23A)

Note-This document is only being provided as a courtesy, for its ease of use. The content of questionnaire did not change. As stated in the answer to question #107, the original Past Performance Questionnaire posted with the RFP on April 18 or the editable version on the eLibrary, will be accepted by the Government with the proposals.

3. In accordance with block 11 (b) of the SF30, the Offeror shall sign the acknowledgement

Amendment P0001 in block 14 the SF33 of RFP 80SSC024R0004.

4. The proposal due date has been extended to Tuesday, June 11, 2024 @ 1:00 PM CDT.

5. The oral presentation due date has been extended to Monday, June 17, 2024 @ 1:00 PM CDT. The actual presentations will be scheduled by the Government team with each individual Offeror for Tuesday, June 18 and/or Thursday, June 20, 2024.

6. All other terms and conditions remain the same.