SBP01 Notice Approval Occupncy Use R7-2022 (11).docx

DOCX document 37 KB Posted

Attached to
Fort Garland 7+1 Bay VSF
Solicitation number
23704
Issued by
Custer County, Colorado

About this file

This document is a State of Colorado Office of the State Architect State Buildings Program Notice of Approval of Occupancy/Use form, applicable to an unspecified construction project. The form provides a comprehensive checklist for verifying a project's readiness for occupancy, detailing 14 specific items that must be completed and verified before occupancy can be approved. These items include confirming substantial completion, fire safety systems functionality, utility connections, plumbing sterilization, systems testing, equipment placement, and ensuring safe pedestrian access.

The document emphasizes that occupancy approval does not constitute final project acceptance, and warns that occupants may be impacted by ongoing contractor work. The form requires signatures from the Architect/Engineer, Principal Representative, State Buildings Program, and Contractor to validate the occupancy approval. While the specific project details are not fully disclosed, the related contract opportunity references a 7+1-bay Vehicle Storage Facility (VSF) construction project in Costilla County, Colorado, suggesting this occupancy form may be connected to that specific development.

View the file

Other files

File Type Posted
Fort Garland - Advertisement - Appendix L - Construction Specifications.pdf PDF
Fort Garland - Advertisement - Appendix D - Applicable Prevailing Wage Rates (Heavy).pdf PDF
Fort Garland - Advertisement - Appendix G - Labor and Material Bond.docx DOCX document
Fort Garland - Advertisement - Appendix D - Applicable Prevailing Wage Rates (Building).pdf PDF
SBP-6.27 Acceptance_2025.docx DOCX document
Fort Garland - Advertisement - Appendix C - Direct Labor Burden Calculation.docx DOCX document
Fort Garland - Advertisement - Appendix O - Code Compliance Notice.pdf PDF
Fort Garland - Advertisement.pdf PDF
SBP-6.26 Notice Procd Const DBB_2025 (1).docx DOCX document
Fort Garland - Advertisement - Appendix B1 - Bid Bond.docx DOCX document
Fort Garland - Advertisement - Appendix B - Bid Form.pdf PDF
Fort Garland - Advertisement - Appendix F - Performance Bond.docx DOCX document
Fort Garland - Advertisement - Appendix E - Contract Wage Compliance Form.pdf PDF
Fort Garland - Advertisement - Appendix J - Scope of Work.pdf PDF
Fort Garland - Advertisement - Appendix K - Construction Drawings.pdf PDF
SBP-6.15 Award DBB_2025 (1).docx DOCX document
Fort Garland - Advertisement - Appendix N - Buy Clean Colorado Form.xlsx XLSX spreadsheet
Fort Garland - Advertisement - Appendix M - Stormwater Management Plan.docx DOCX document
SBP-070 SubCompletion-2025.docx DOCX document
Fort Garland - Advertisement - Appendix H - Sample Contract.pdf PDF
Fort Garland - Advertisement - Appendix A - Information for Bidders.pdf PDF
SBP-7.3 Settlement_2025_0.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

NOTICE OF APPROVAL OF OCCUPANCY/USE

Date of Occupancy:

Date to be inserted by the Architect/Engineer after consulation with Principal Representative

Institution/Agency:
Project No./Name:

Portion(s) of project for which occupancy is approved:

Type of Occupancy:
|_| Total or |_| Partial

The items identified below if applicable must be completed with before Occupancy is approved.

Date Completed
A/E Signoff

1a. The Notice of Substantial Completion has been issued.

1b. The Building Inspection Record is completely signed-off and attached.

2a. Notification has been made to the local Fire Department concerning which portion(s) of the building will be occupied and the date(s).

2b. Fire alarms, smoke detection systems and building fire sprinkler systems have been fully checked and are operable.

2c. The building’s fire connections must be installed and operable, if applicable.

3. Coordination for final utility and service connections and meters (water, gas, sewer, electricity and telecommunication) has been made and systems are in full operating order.

4. Sterilization of plumbing systems has been performed.

5. Operational test of systems and equipment has been performed as required.

6. Systems adjustments such as balancing, equipment operations, etc., have been performed. Reports have been submitted to the Architect/Engineer for approval.

7. Principal Representative furnished equipment and furnishings are coordinated and placed.

8. All elements left unfinished must be in such condition that there would be no hazard to the health or safety of the occupants.

9. All restroom facilities must be fully functional and operable.

10. All light fixtures must be installed and operable.

11. All exit lights and emergency lighting systems have been checked and are operable.

12. All windows have been glazed and hardware is available for ventilation purposes.

13. All routes of egress must be clear of construction materials and debris at all times.

14. There must be a means of pedestrian access to each building. Contractor must have sidewalks installed before occupancy and pedestrian barricades and other means of public protection as required.

Occupancy does not constitute acceptance of the project as being complete. It simply provides the Principal Representative the opportunity to occupy/use the project or the applicable portion thereof prior to final completion and acceptance. Occupants can expect to be impacted by the Contractor’s efforts to complete the project. The Contractor would not repair any damage caused by the occupants.

Architect/Engineer

Date

Principal Representative (Institution or Agency)

Date

State Buildings Program (or Authorized Delegate)

Date

Contractor

Date

State Form SBP-01 Page 1 of 2 Rev. 7/2022 image1.jpeg