| Question/Clarification Requested | Reference | INL/A Answer/Clarification |
| Table L.3.1 lists sections for Volume VI that are different and inconsistent with the content instructions for Volume VI found in L.9.0. Should offerors (a) ignore one of the two instruction sets or (b) combine them? | Table L.3.1/L 9.0 | Refer to revised Table L.3.1 per Amendment 001. |
| Sections L.5 thru L.9, M.10 and M.11 give different “Factor” and “Sub-Factor” designations or labels to sections, and sometimes different numeric designations to those factors. For example, L.6 labels Volume III, Past Performance as “Factor 3,” but M.10 labels Past Performance as an “Other Factor.” Because section M.10 appears to present the most complete and logical listing of “Factors,” may offerors assume that the factor labels in section M.10 take precedence and simply disregard any other conflicting references? | Sections L & M.10 | Do not disregard any factors references. Section L explains the “Technical Factors” and “Past Performance and Price” are listed as other factors because they are being evaluated separately from Technical Factors. |
| Should reference to “key personnel identified in H.15” be changed to refer to “H.17”? | Section L.5.1.3, 1, a | Key personnel should be referenced in H.17 instead of H.15. |
| Please confirm that the following items are excluded from the page count: |
• Cover Page/Title Page
• Table of Contents [in each volume]
• Table of Figures/Exhibits [in each volume]
• Master Table of Contents [in Executive Summary]
• Glossary of Abbreviations and Acronyms [in each volume]
• Cross-reference matrix (if provided)
• Resumes
• Letters of Commitment
• Quality Assurance Surveillance Plan (QASP) Examples/Samples
• Total Compensation Plan (included with Volume II)
| Section L.3.2, Page Limitations | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 per Amendment 001. | |
| Please remove the page limit for the past performance volume or increase the limit to a number which can accommodate the content instructions. If, hypothetically, an offeror has 1 to 4 subcontractors on its team, then that offeror will be required to submit between 6 and 15 past performance references within the 7 page limit. Each PP reference must, in turn, be responsive to the government’s nine content items including “brief description of the work, including responsibilities;” “comparison to the work required under this solicitation;” “ Brief discussion of any technical problems and their resolutions;” and “ Brief discussion of all terminations (partial or complete) and type (convenience or default) as well as any deficiency notices, show cause notices or cure notices (provide explanatory details)” for every PP reference. Considering the content mandates for the PP volume, it seems that a more realistic page limit might be 2-3 pages per PP reference, together with the assumption that an offeror may have multiple subcontractors. | Table L.3.1, entry for Volume III, Past Performance | All pages will be included in the page count and page limits increased. Refer to revised table L.3.1 as per Amendment 001. |
| Although the proposal instruction describing commitment letters in L.5.1.3 / 1, b) does not require salary information to be included in the commitment letter, an earlier reference in L.3.4 refers to salary data in commitment letters as being a requirement. |
Since these references seem contradictory, and since such salary information is already included in the Total Compensation Plan as a separate attachment to Volume II, we request that the reference to commitment letters be removed from L.3.4.
| Section L.3.4 Cost or Pricing Information – Commitment Letter | All cost or pricing information shall be addressed only in the Price Proposal (Volume IV), except as noted in revised L.3.4. See Amendment 001. | |
| Does the offeror’s deadline for issuing past performance questionnaires (PPQs) to references coincide with the proposal deadline or does the government request PPQ issuance to references at an earlier date? | Section L.6 and Attachment J.14 | Yes, the deadline for past performance coincides with the proposal deadline. |
| Would the government be willing to provide an electronically editable version of the Past Performance Questionnaire? | Attachment J.14 | No. |
| References to Honduras exist in the PWS. Is support for Honduras included within the scope of work? | PWS 1.A.2.d -- Mission Environment (Honduras) | No-All references to Honduras should be excluded from consideration and proposal as per Amendment 001. |
| What software (and software version) is in place today to handle IT change requests and trouble tickets/service requests? | PWS 1.A.3.e | Footprints is currently being used today. |
| Estimated quantity reflects 8 locations; can you please identify the physical location of these 8? (Noted: Support reflects 2000+ supported personnel on this effort). | PWS 2.C.1.a | The six (6) main locations are listed at 2.C.2. Additional locations are based on requirement. Specific site locations will be provided at contract award. |
| Each of the performance standards that state a metric summary of "with X hours of opening……." reflect that the failure number is parallel with the X number in summary… Is it safe to assume that X in summary is the failure point? | PWS 2.C.2.a, 2.C.2.c, 2.C.2.f, 2.C.2.g, 2.C.3.e, 2.C.3.f | Yes. |
| Each of the performance standards that state a metric summary of "with X hours of opening……." reflect that the failure number is parallel with the X number in summary. Is it safe to assume that X in summary is the failure point? | PWS 2.C.2.c | Yes. |
| The estimated quantity reflects 20 sites. Can you please identify the physical location of the 20 sites? | PWS 2.C.3.k | Refer to the PWS Sections 1 thru 10. |
| Is the intention of this Requirement to focus on IT owned applications with the exclusion of the new JIE purposed by Maintenance awarded contractor? | PWS 2.C.3.m | Once new MIS is in production IT will assume full responsibility. Please refer to 1.A.6 of the PWS. |
| Is it the government’s intent to provide additional SME hours to support non-OpenNet government systems support by the IT contractor? | PWS 2.C.5.f | Yes. |
| Is the government willing to provide an accurate break out of Workstations & Servers & Appliances in government network and totals on GINL? | PWS 2.C.6.c | Information will be provided at time of award. |
| Does the government intend to have IT continue to provide the initial training of AWIS until the system has been decommissioned and the new JIE is in place? | PWS 2.C.9.b | Once contract is awarded AWIS will continue to be supported until decommissioned. |
| Will the government allow IT support in the OCONUS locations (Peru, Colombia, Iraq, Afghanistan, Pakistan) to be performed by Local nationals with embassy clearances. Attachment J.11 shows that site leads must be US Citizens. This question reflects the IT support positions under the OCONUS Lead(s). | PWS 2.C.11.a, Attachment J.11 | IT Site lead must be US Citizens. Please refer to PWS 2.B.2 for IT support positions and refer to revised Attachment J.11 as per Amendment 001. |
| Is it safe to assume that this applies only to applications where IT is the Owner. For example: The new JIE purposed system tests scripts will need to be written by the IPT SME in support and IT will provide assistance in executing to these scripts and the environment to do such. | PWS 3.C.2.d | Once new MIS is in production IT will assume full responsibility. Please refer to 1.A.6 of the PWS. |
| Please specify the physical location(s) of the 20 servers. | PWS 3.C.3.c | We current operate in eight (8) countries (6 main and 2 contingency)with multiple sites within some of those countries. Specific site information will be provided at time of award. |
| Is it safe to assume that this Requirement applies only to applications where IT is the owner? For example: The new JIE purposed system tests scripts will need to be written by the IPT SME in support and IT will provide assistance in executing to these scripts and the environment to do such. | PWS 3.C.3.f, 3.C.4.a, 3.C.4.i | Once new MIS is in production IT will assume full responsibility. Please refer to 1.A.6 of the PWS. |
| Would the government be willing to provide descriptions and requirements for all 32 listed labor categories in the pricing table? | Attachments J.5, J.11 | Refer to revised Attachment J.11 as per Amendment 001. |
| Section L.3.5 specifies that “Each volume shall be indexed with letter or number tabs corresponding with the table of contents for ease of location and quick reference.” Is this information excluded from the page limitation similar to Section L.3.5 which excludes the glossary of abbreviations and acronyms from the page limitations? | L.3.5 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. |
| Section L.4 specifies that Offerors “Include a master table of contents covering the entire proposal (Volume I through Volume VI)” in Volume I. Are we to also include a table of contents for each volume? If so, is it excluded from the page count? | L.4 | Yes, include a table of contents for each volume. All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. |
| Section L.3.7 specifies that “A cover sheet should be bound in each book.” Is the cover sheet excluded from the page count? | L.3.7 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. |
| The 7-page limitation for past performance is a significant constraint to Industry teams to adequately demonstrate past performance. Given the information required by Section L for each project (project summary information and consent letter (J.19)), it is not possible to provide the required information in the 7-page limit just for the Prime Contractor’s 3 projects let alone any subcontractors. Will the Government please amend the RFQ to adjust the page restrictions to 2 pages per project referenced and exclude the J.19 Consent Letter from the page count? | Section L.6: Past Performance | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. |
| Attachment J11 does not include all key personnel minimum requirements. For example, the Project Manager is not listed in this table. Please modify J11 to include all key personnel minimum requirements. | Attachment J.11 | Refer to revised Table L.3.1 as per Amendment 001. |
| The degree types are very specific and constrain the population of qualified key personnel to a small population who possess a degree from a subset of universities. Would the Government modify the degree requirements to a Bachelor’s Degree in a field related? | Attachment J.11 | Refer to revised Attachment J.11 as per Amendment 001. |
| Many of the current incumbent personnel supporting the program do not meet the education requirements for key personnel. Would the Government modify the degree requirement to allow additional relevant experience in lieu of the Bachelor’s degree? | Attachment J.11 | Refer to revised Attachment J.11 as per Amendment 001. |
| The second paragraph of the attachment states that: “Any questions may be directed to <insert name, title, phone number and fax number for the offeror’s POC>.” Can the Government please clarify if the “offeror’s POC” pertains to the prime offeror submitting the proposal OR the company to which the reference belongs (e.g., subcontractor POC)? | Attachment J.20 | It pertains to the company to which the reference belongs. |
| The 4th paragraph states: “Past Performance and experience similar in nature by the prime and/or partners (vendors, subcontractors) conducted similar services performed in OCONUS locations, complexity, technology, and contract scope.” This statement seems to have been truncated inadvertently. Will the Government please provide the missing information? | Section L.6: Past Performance | There is no missing information. |
| Table L.3.1 identifies Volume VI Section F as a Quality Assurance Surveillance Plan Sample(s). Section L.5.1 paragraph 1.(d) and L.5.1.2 paragraph 2.(d) state “Submit a summary of your proposed Management Quality Assurance Surveillance Plan (QASP) for this area of the work.” referring to Volume II – Technical/Management Proposal. Please clarify where offerors are to include their QASP. | Section L.3.1: General | Refer to revised Table L.3.1 as per Amendment 001. |
| Table L.3.1 specifies that offerors are to provide QASP “sample(s)”. Sections L.5.1 and L.5.2 state offerors should submit a summary of the QASP. Section M.11 paragraph A.1.(d) indicates that the proposed QASP will be evaluated which seems to imply the need for an entire QASP. Please clarify if offerors are supposed to provide an entire QASP, a summary of the QASP, or a sample QASP. | Section L.3.1: General | Please provide a QASP where instructed in sections L.5.1. That QASP will be evaluated as stated in section M.11. Refer to revised Table L.3.1 as per Amendment 001. |
| Table L.3.1 indicates Volume VI should include the following sections: |
• Section A Transmittal Letter and SF 33
• Section C Exceptions to Solicitation Requirements
• Section D Company Information
• Section E Organizational Conflicts of Interest
• Section F Quality Assurance Surveillance Plan Sample(s) RFP Section L.9 indicates Volume VI should include the following sections:
• Section A – Controls
• Section B – Estimating System
• Section C – Billing System
• Section D – Purchasing System
• Section E – Cost Accounting System
• Section F – Cognizant Federal Agency Official
• Section G – Government Property Management System
• Section H – Joint Venture Please clarify what sections are to be provided in Volume VI.
| Section L.3.1: General | Refer to revised Table L.3.1 as per Amendment 001. | |
| The RFP states “For tables, charts, graphs and figures, the text shall be no smaller than 8-point size.” It does not mention the font. Because a sans serif font is easier to read in tables, charts, graphs, and figures, will the government allow a sans serif font for this purpose? | Section L.3.3: Page Size and Format | Yes. |
| The RFP states that offerors are to include in the Executive Summary a master table of contents covering the entire proposal. Since this master table of contents will require several pages, is it excluded from the Executive Summary’s 8 page limit? | Section L.4(b): Table of Contents | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. |
| What is the address to hand-deliver proposals? | Please refer to page 1 blocks 8 and 9 of the RFP. | |
| Request the security Requirements under H.31 be removed. | H.31 - Security Requirements | Cannot be waivered. |
| Who is the incumbent currently performing work for this requirement? Please provide the company name and contract number. | That information is not germane to this solicitation. | |
| Due to the large volume of questions that are being submitted for this RFP and the tight timeframe between the due date of questions and the RFP due date we are concerned that the government may not have enough time to adequately answer the questions. Because of this, we would recommend that the government extend the RFP due date by not more than 2 weeks (August 20th) | No extention will be granted this time. | |
| Will the government allow relevant years of experience in lieu of a degree for proposed personnel? | Yes, refer to updated J.11 as per Amendment 001. | |
| Please identify all applications that the contractor is required expected to support under this contract. |
| Information will be provided at time of award. | ||
| Should the contractor use the server volumes contained in the Attachment J9 GFE list or the 200+ server volume listed in the PWS as the basis of our solution pricing? Please clarify. | 3.C.3.e | Use the 200+ server volume in the PWS. |
| Has all Government Furnished Property information and documentation been made available at this time by the government so that contractors may prepare our complete responses? | 1.A.7 | ALL GFE information is listed on attachment J.9. |
| Is the satellite equipment considered part of the RDN for the purpose of this task? | 2.C.3.c | Yes. |
| Are the satellite teleports part of the ITS contract? | 2.C.3.d | Yes. |
| Is real-time circuit management part of the ITS contract, or just monthly bandwidth management? | 2.C.3.d | Yes to both. |
| The referenced section indicates the Contractor is to maintain the bandwidth utilization for all satellite circuits to remote locations. Are the referenced satellite circuits GFE or is the Contractor to provide these circuits as part of their technical solution? | 2.C.3.d | The contractor is to provide these as part of their technical solution. |
| Do the RDN's include any satellite equipment? | 2.C.3.c | Yes. |
| Does the WAN equipment listed include satellite equipment? | 2.C.4.b | Yes. |
| Is satellite equipment included in the scope of this section? | 2.C.5.c | Yes. |
| Please provide the quantity of database instances by database type, e.g., MS SQL, Oracle, etc. | 2.C.1.a | Information will be provided at time of award. |
| Please provide a list of server and equipment inventory with additional detail by operating system type and server specifications. | 2.C.3 | Information will be provided at time of award. |
| Please provide the quantity of physical and virtual servers by operating system type. | 2.C.3 | Information will be provided at time of award. |
| How many of the servers located at OCONUS sites are database servers? Please provide the breakdown by site. | 2.C.1.a | Information will be provided at time of award. |
| Do the servers listed in J9 GFE equipment list include servers located at the DR data center site ? | J.9 | Not at the time of solicitation release. |
| Appendix D of attachment J.11 IT_MinQualsTABLE lists a job description for the PM, Operations Supervisor (Operations Manager), Information Security Officer, OCONUS IT Site Leads and IT Administrators. According to the table on page 56 of the RFP under H.17 Key Personnel, the offeror is required to submit a key person for Project Manager and there is no requirement for IT Administrator. Can the Government please update Appendix D to reflect the key personnel required in the list in H.17 of the RFP and include a job description for Project manager? | J.11, Appendix D | Please refer to updated J.11 as per Amendment 001. |
| In J.11 (IT Min Quals Table), there is a labor category entitled IT Administrator with its respective requirements. However, the J.5 Pricing Tables does not include a labor category entitled IT Administrator. Should the IT Administrator position be considered a Network Administrator or was this position not included in the pricing table and should be added as an additional labor category? | J.11, J.5 | Please refer to updated J.11 as per Amendment 001. |
| Key Personnel Resume Requirements are provided to offerors as the format to be used to present the key personnel. Is it permissible for the offeror to alter the resume format provided in attachment J.12 as long as the information requested is still provided? | J.12 | No, format will remain the same. |
| The Past Performance requirements indicates that each and any proposed subcontractor will submit a minimum of 3 past performance references. The page allocation for the Past Performance Volume of 7 pages is not enough page space for offerors with multiple subcontractors. Is the 7 page limit per offeror/subcontractor? If not, please consider increasing the page limit. | Tables L.3.1 & L.6 | Refer to revised Table L.3.1 as per Amendment 001. |
| With a 60 page limitation on Volume II Technical/Management proposal which is inclusive of the 7 required key personnel resumes and the 7 required letters of commitment will the Government please remove the resumes and letters of commitment from the page count to allow a sufficient amount of space for all requirements to be satisfied? | L | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. |
| On page 56 of the RFP under section H.17 Key Personnel it states that “[Additional labor Category(s) and Name(s) may be inserted by Offeror at time of proposal submission.]” Also Attachment J.11 IT_MinQuals_Table row 52 under 2.B.2 it states “the contractor will specify any additional Key Personnel subject to the requirements of the Key Personnel in 2.B and Appendix D… Consolidate these as a separate table or appendix for ease of reference and inclusion in the contract.” Can the Government confirm that it is permissible to include additional resumes and letters of commitment for additional personnel that the offeror feels are key to program success, and that they do not count against page count? | H.17 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. |
| Are the various summary QASPs required in the Technical/Management Proposal to be included in 'Section F QASP Samples' or is 'Section F' to be populated with additional samples outside of what's required in the Technical/Management Proposal? If the summary QASPs are not to be located in 'Section F' but are to be located within the Technical/Management Volume are the summary QASPs outside of the 60 page limit? | Table L.3.1 | Please provide a QASP where instructed in sections L.5.1. That QASP will be evaluated as stated in section M.11. Refer to revised Table L.3.1 as per Amendment 001. |
| Do all contactor personnel have to be located at Government facilities? | H.6 | No they do not |
| Throughout the RFP document there are tables that list an initial period of performance and 10 option years. In the pricing tables the period of performance is listed as one initial period of performance and 9 option years. Please clarify the correct period of performance. | B, F.3 | Please refer to L.7.1,11 for option year 10 explanation. |
| For Sections A, C, D, E, and F as listed at the bottom of the table, please clarify in what volume and location within a volume the Government wants these sections to be included. Some of the information in these sections aligns with sections in Volumes V and VI but not all. Please clarify. | L.3.1 | Section A-C do not fall under Volume VI. Refer to revised Table L.3.1 as per Amendment 001. |
| In Table L.3.1 the SF33 is referenced as part of 'Section A'. In L.8 the SF33 is referenced as part of Volume V Section A. Please clarify where the SF33 is to be located in the proposal. | Table L.3.1 and L.8.1 | The SF33 will need to be included in L.8 section A. Refer to revised Table L.3.1 as per Amendment 001. |
| Are the various summary QASPs required in the Technical/Management Proposal to be included in 'Section F QASP Samples' or is 'Section F' to be populated with additional samples outside of what's required in the Technical/Management Proposal? If the summary QASPs are not to be located in 'Section F' but are to be located within the Technical/Management Volume are the summary QASPs outside of the 60 page limit? | Table L.3.1 | Please provide a QASP where instructed in sections L.5.1. That QASP will be evaluated as stated in section M.11. Refer to revised Table L.3.1 as per Amendment 001. |
| Please clarify the instructions under item a. Is the offeror to write to three critical areas and then write separately to the list of service areas listed and include text on steady state operations, break/fix, and mission critical upgrades? Or are the three critical areas to be selected from the list of service areas? We assume the reference to Statement of Requirements is referring to the PWS, is that correct? | L.5.1 | The offeror is to select three areas they deem critical to operations and address the required information. The areas the offeror deem critical do not have to be selected from the list. You are correct, Statement of Requirements is referring to the PWS. |
| Price worksheets appear to be developed for Arial 11 font rather than Times New Roman. Please clarify given the format requirement to use Times New Roman. | L.3.3, L.7 | Keep the Price Worksheets in their current format. |
| Is the Phase in Plan due to the government 30 days after contract start? Please clarify. | L.5.1.2 | Please provide the phase in plan as requested in L.5.1.2 for evaluation.Yes, the Phase in Plan must be final and ready for implimentation 30 days after contract start IAW PWS 2.C.9.a |
| The J9 attachment shows equipment at locations not included in the Task Order scope. Would the contractor be required to provide on-site support for these devices? Please clarify. | J.9 | Provide on-site support as specified in the PWS. |
| What are the technical platforms used by each application? | Information will be provided at time of award. | |
| Regarding the Asset inventory from the PWS, the Contractor is required to perform an initial asset inventory but requirements do not indicate when this needs to be completed. Would this be completed within the 180-day phase-in period? | Initial asset inventory should be conducted in accordance within your phase-in plan. | |
| It's unclear if the Government is asking the Contractor to develop an application that will interface with the MIS or merely inventory all property and make sure the information is current in the MIS. What system does the Government envision the Contractor provide that "ensures proper use of parts, processing request for procurement of materials and inventory tracking"? | The IT contractor will not be responsible for development of a system that "ensures proper use of parts, processing request for procurement of materials and inventory tracking". This system is to be provided by the Aviation Services contractor. | |
| What database is used today to track hardware purchases and warranty periods? | AWIS is the current database for this information. | |
| What database is used today to track software purchases and warranty and/or maintenance periods? | AWIS is the current database for this information. | |
| The RFP states: |
The maximum for the contract’s period of performance, including any extension(s), shall be any quantity or combination of supplies and services not exceeding $80,000,000 (inclusive of all direct costs, indirect costs, and profit/fee).
Is the ceiling applicable for the base and all option years?
| Section B.3 | Yes--this includes the base and all options. | ||
| Are there any planned reductions or changes from the current Dyncorp contract scope from what is included in the solicitation requirements? | Section B.3 | This is a separate requirement. | |
| The key personnel specified in H.17 and J.11 are inconsistent. Please reconcile and provide updates to the solicitation? | H.17 and J.11 | Please refer to updated J.11 as per Amendment 001. | |
| We have reviewed the PSO and recent Worldwide Aviation Support Services solicitations. We did notice that the Government included minimum qualifications for all labor categories. Is the Government intending to provide this same type of information for this solicitation? | J.11 | Please refer to updated J.11as per Amendment 001. | |
| The PSO and WASS solicitations minimum qualifications for key personnel are less restrictive than the ITSS solicitation. For example, the WASS Program Director qualifications specifies a “Bachelor's degree from an accredited university or equivalent” and “PMP is desirable” to lead a $10B contract; while the ITSS Project Manager qualification specifies a “Bachelor degree in Information Systems Management or Computer Science” and “A certification in Project Management from an industry-recognized organization such as the Project Management Institute (PMI); e.g., Project Management Professional (PMP) and/or Program Management Professional (PgMP)” to lead a $80M contract. Will the Government consider revising the key personnel qualifications to be more in line WASS and PSO (e.g., “Bachelor's degree from an accredited university or equivalent” and “PMP is desirable”)? | J.11 | Please refer to updated J.11 as per Amendment 001. | |
| Please confirm that the certification requirement for the IT Program Manager is to have a certification in place prior to contract start, not necessarily completed for proposal submission. | J.11 | Yes | |
| Does DoS want a copy of the J.20 forms included in Volume III, Past Performance? | J.20 | No | |
| The key personnel qualifications are restrictive. Will the Government adjust the key personnel qualifications to require a Bachelor Degree or Equivalent Work Experience? | J.11 | Refer to revised Attachment J.11 as per Amendment 001. | |
| For the Program Manager, will the Government consider revising the certifications to be preferred from required? | J.11 | Refer to revised Attachment J.11 as per Amendment 001. | |
| Across both subfactors under the Technical and Management sections the Government is requesting a QASP detailing metrics including AQLs of performance to be utilized in measuring performance and a discussion on price reductions in the event of less than acceptable performance. Will the government accept a more general approach to QASP metrics to meet AQLs and penalties for not meeting the metrics rather than the individual PWS items that will be part of the TO’s during contract execution? | Please provide a QASP where instructed in sections L.5. That QASP will be evaluated as stated in section M.11. | ||
| Page 114 Section L.3.1 references Section F Quality Assurance Surveillance Plan Sample(s), but there are not instructions or other references for this section. Please clarify this requirement. | Section L.3.1 pg 114 | Please provide a QASP where instructed in sections L.5.1. That QASP will be evaluated as stated in section M.11. Refer to revised table L.3.1 in Amendment 001 for changes. | |
| Should subcontractors submit Total Compensation Plans as well? Subcontractors would likely want to submit this information in a sealed package. | Section L.3.4 pg 115 | This has been addressed. Please refer to amendment 001 | |
| Page 117 Section L.5.1.1.a and L.5.1.2.a reference a Statement of Requirements; however there is no attachment or other reference to a Statement of Requirements. Please clarify this requirement. | Section L.5.1.1.a and L.5.1.2.a pg 117 | Statement of Requirements is referring to the PWS. Refer to Amendment 001. | |
| Page 121 Section L.6 requests "number of personnel employed by contract year per labor category." Our intended past performance references include task orders with up to 80 labor categories. It would be impossible to list the number of personnel employed by contract year per labor category for three years for that individual past performance reference alone in less than 7 pages. Furthermore, some of the Past Performance references are FFP contracts that do not have contractually defined labor categories. Therefore we request that labor category mix per year be eliminated as a requirement for past performance. | Section L.6, pg 121 | If its not applicable so state and briefly explain. | |
| Page 121 Section L.6. Some subcontractor labor category mix information requested in section L.6 could be considered proprietary. Would it be acceptable for subcontractors to submit past performance information in a separate sealed package? | Section L.6, pg 121 | Yes | |
| Page 139 Section M.10 states “The Government’s evaluation of Technical Factors “1” and “2” and Management Factors “1” and “2” will be based on the offerors’ respective responses to the Sample Task Order Performance Work Statement (Attachment J.1). Evaluation of Management Factor “1” (Program Management) will be based on the offeror’s proposed plan for overall management of the IDIQ contract.” This statement is contradictory, as it states Management Factor 1 will be based on Sample Task Order Performance Work Statement (Attachment J.1) and for overall management of the IDIQ contract. Please clarify. | Section M.10, pg 139 | The Government’s evaluation of Technical Factors and Management Factors will be based on the offerors’ respective responses to the Sample Task Order Performance Work Statement (Attachment J.1). Refer to Amendment 001. | |
| Page 139 Section M.11.A.1.a provides the evaluation criteria of “the offerors understanding of the requirements described in the Performance Work Statement.” Page 117 Section L.5.1 requests information related to offers ability in “maintaining responsibility for providing the IT services described in the Statement of Requirements, address steady state (IT) operations, break fix, and mission critical upgrades.” Please clarify the Government’s intent. Should offerors provide a response to the entire IT Services PWS or specifically for their approach for IT Services steady state (IT) operations, break fix, and mission critical upgrades? | Section M.11.A.1.a, pg 139 | Our intent is to evaluate the three areas you select as critical, against the stated critiria. | |
| Attachment J.1, are the performance standards stated currently in place and if so are they being met by the incumbent contractor? | J.1 | These are the requirments in against which you will propose services. | |
| Are you asking for the summary of Quality Assurance Surveillance Plan Sample in Section F - Quality Assurance Surveillance Plan Sample(s) or something different? Please, clarify. | Page # 114, Table L.3.1 Proposal Organizational Table | Please provide a QASP where instructed in sections L.5.1. That QASP will be evaluated as stated in section M.11. Refer to revised table L.3.1 in Amendment 001 for changes. | |
| If there are more than three Teaming Partners in preparing the response, then how can we provide Past Performance as the page limit of Past Performance is Seven (7) pages? Can you please increase the page limit of Past Performance volume? | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | ||
| In Table L.3.1 Proposal Organization Table, it is asked for five (5) volumes (Section A, Section C, Section D, Section E, Section F). | |||
| Here, Section B is missing. So, is it typo error or intentionally left out? Please, clarify. | Page # 114, Section L.3.1 Organization/Number of Copies/Page Limits | Section A-C do not fall under Volume VI. Refer to revised Table L.3.1 as per Amendment 001. | |
| Do we need to provide Past Performance using ATTACHMENT J.20 Client Authorization Letter on Company’s letterhead? Does the Teaming Partner also need to provide Past Performance on their Company’s letterhead? | Yes. Refer to instructions in Attachment J.20. | ||
| it is asked for SF 33 in Section A - Transmittal Letter and SF 33. Also, on Page # 132, Section L.8: Contract Documentation, it is also asked for SF 33 in Section A – Solicitation/Contract Form. Do we need to provide SF 33 in both the volumes – Section A - Transmittal Letter and SF 33 and Volume V – Contract Documentation? Please, clarify. | Page # 114, Table L.3.1 Proposal Organizational Table | The SF33 will need to be included in L.8 section A. Refer to revised Table L.3.1 as per Amendment 001. | |
| Do we need to provide Organization Conflicts of Interest in both Section E - Organizational Conflicts of Interest and Volume II – Technical/Management Proposal – 1. Program Management? Please, clarify. | Section A-C do not fall under Volume VI. Refer to revised Table L.3.1 as per Amendment 001. | ||
| Is there any page limit for Resume? | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | ||
| Are Resumes and Commitment Letters excluded from Page Limit? | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | ||
| L.6 requires that the prime and every teaming partner submits three past performances. The information required for each past performance will minimally consume ¾ of a page. However the page limitation on past performance is limited to seven pages. This severely limits the ability to comply with the content required and the page limitation if you have several teaming partners. Would the government consider increasing the page limit or basing the limit on the number of teaming partners? | Page#121, L.6 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| which other probable missions and locations can be added throughout the contract of performance. | Under section F.4 – Place of Performance | Wherever required, within scope. There are no set "additional locations" at this time. | |
| The RFP requirement that all personnel working on the contract have a Secret Clearance may prevent current Columbian Nationals from having administrative rights to work on the network. |
| Does the Government intend for all Columbian Nationals working on the project to apply for a U.S. Secret clearance? | H.31, J.11 Min IT Quals Table | Please refer to 2.B.2 of the PWS | |
| Will the Government allow experience in lieu of education degrees for experienced incumbent IT Site Leads? | J.11 Min IT Quals Table | Refer to revised Attachment J.11 as per Amendment 001. | |
| May bidders submit multiple consolidated lists as questions arise in preparing the proposal or is July 21st the only time the government will accept questions? | L.2.2 | July 21st was the deadline for questions. | |
| Is a Table of Contents required for each Volume and if so, does it count toward the page count limitation of each volume? | L.3.1 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| 1. In table on L.3.1, Section A requires a transmittal letter and SF33. Description in Section 9.0 on page 133 does not mention the transmittal letter or the SF33. |
2. Table on L.3.1 does not account for Section B or provide page limit for Section B - Estimating System which is listed on page 116
| Please consider revising L.3.1 Proposal Organization Table to reflect requirements/instructions in Vol V and 9.0 Volume VI: Business Proposal | L.3.1, 9.0 Vol VI | Section A-C do not fall under Volume VI. Refer to revised Table L.3.1 as per Amendment 001. | |
| Is the Master Table of Contents covering the entire proposal included in the Volume I Executive Summary 8 page limitation? | L.3.1, L.4 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| With all past performance information required for solicitation compliance and 3 citations required for each teammate; would the government consider increasing the Past Performance page limitation from 7 pages total to 2 pages for each citation? |
| For example if a team is comprised of 3 teammates with 3 citations each, this limits citations to ~3/4 page each in which all solicitation requirements cannot be adequately addressed. | L.3.1, L.6 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. |
| On Page 115 of 144, Section L.3.4 Cost or Pricing Information, states that all cost or pricing information shall be addressed only in the Price Proposal (Volume IV), except… “The Key Personnel commitment letter requirement to provide the key person’s proposed salary and a summary description of any benefits packages that have been offered to the key person…” |
However, in Section L.5.1.3 Key Personnel/Staffing Plan, Qualified and Experienced Key Personnel (b), it states that a commitment letter …. must include
a) The name of the key person.
b) The position to be occupied by the key person.
c) A narrative statement that specifies the key person’s commitment to the contract, which shall include the duration, degree and breadth of the key person’s commitment.
| Would the Government please clarify what information must be included in the Letter of Commitment for proposed key personnel? Specifically, we request that the compensation information be excluded from the letter of commitment as that information only belongs in the Price Proposal (Volumme VI)? | L.3.4, L.5.1.3 | As per Amendment 001--see change. All cost or pricing information shall be addressed only in the Price Proposal (Volume IV), except as noted in revised L.3.4. | |
| Is a Phase-In plan summary required in the proposal with an actual Phase-In Plan provided as an attachment? If so, does the attachment count against the Vol.II Tech/Management Proposal 60 page limitation? | L.5.1.2 | The offeror may choose to do both as the new page limit is now 100 pages. | |
| "To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company." |
| Does 'organization of your company' mean that ONLY the bidding Prime needs to submit or do all teammates (prime and subs) need to submit an organizational structure change history? | L.6.1 | Yes, just the bidding prime. | |
| Does the Government require submittal of Letters of Commitment for personnel proposed or referenced for non-key positions? | M.11.C.b | No | |
| In Attachment J.5 Pricing Tables, the Government has provided a listing of 32 labor categories for the contractor to price. However, in Attachment J.11 IT MinQuals Table, the Government has only provided qualifications and skill sets for 5 labor categories. Will the Government provide a full listing of labor category qualifications and skill sets for the contractor to use for purposes of estimating? | Attachment J.11_IT_MinQualsTABLE; Appendix D - Attachment J.5_Pricing_Tables_(IT)_3-6-14 | Refer to revised Attachment J.11 as per Amendment 001. | |
| Which network monitoring (i.e. Solarwinds, NetIQ, etc) tools does the Government currently have installed in the INL/A systems enterprise? Will the awardee be given access to these tools in order to perform network and systems performance diagnostics? | Information will be provided at time of award. Yes awardee will be given access to the tools needed to perform. | ||
| Does the Government currently maintain an asset and/or configuration management database containing information on the IT assets in the INL/A systems enterprise? If so, is this tool custom built or a COTS product? If COTS, which one? | Yes. Yes it is custom built. | ||
| We understand that in the AWIS maintenance, operations and Logistics information at OCONUS locations is completed by “AWIS data entry personnel” and is not performed by the actual person executing the tasks. Does this PWS line item assume that the data entry of AWIS in the OCONUS locations will use personnel under the IT contract? | PWS 2.C.9.c | Yes, the IT contractor will be responsible for entering IT data into AWIS. | |
| File J.11, the IT Minimum Qualifications Table, identified a position of “IT administrators”. Could you please explicitly identify which Labor Categories this position description (including Education, Certifications, and Experience) is intended to cover? | J.11 | Refer to revised Attachment J.11 as per Amendment 001. | |
| J.11 contains personnel requirements (education, certificate, experience, language, etc.) for some, but not all, Labor Categories. Can you verify that the other Labor Categories do not have any education, certificate, experience, language, etc., requirements? | J.11 | Refer to revised Attachment J.11 as per Amendment 001. | |
| Labor Categories include “System Administrator I” and “System Administrator II”. There is also a labor category of “Administrative Assistant I”, however there are no other Administrative Assistant labor categories. Does the “I” signify entry level (used by most Agencies), top level (used by a few Agencies), or other (used by at least one Agency)? | J.11 | Refer to revised Attachment J.11 as per Amendment 001. | |
| None of the labor categories (including those in J.11) contain information on the Labor Category responsibilities. While this may seem obvious for a few Labor Categories (i.e., Project Manager), it is less clear for other Labor Categories. Examples of confusion include - but is not limited to: |
a. Does a Data Storage Engineer design or implement databases (or both)?
b. What responsibilities will the “Legacy Systems Analyst” be performing?
c. What responsibilities will the “System Technician” be performing?
| Therefore, can Responsibilities be provided for all Labor Categories? | J.11 | Refer to revised Attachment J.11 as per Amendment 001. | |
| The education requirements for Key Personnel identify that most personnel must have a “Bachelor degree in Information Systems Management or Computer Science”. As these people are also required to have a significant amount of experience and as not all universities have a Computer Science and/or Information Systems Management program, may this requirement be changed to “Bachelor’s degree in an appropriate field of study”? | J.11 | Refer to revised Attachment J.11 as per Amendment 001. | |
| As Key Personnel experience should be significantly more important than education, may additional experience replace the education requirement? | J.11 | Refer to revised Attachment J.11 as per Amendment 001. | |
| Section L and M do not exclude resumes for the proposed personnel from the 60-page limitation on Volume II. Would the Department of State consider amending the RFP so that the resumes could be excluded from the page count restriction for Volume II? | L.3.1, L.5.1.3, M.10, M.11.C | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| Is there a maximum page count associated with all key resumes and/or each individual resume? | L.5.1.3.1(a) | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| Both sections contain the same requirement for a summary of our Quality Assurance Surveillance Plan (QASP). Please clarify which section of the Management Plan should contain the summary QASP. | L.5.1.2 -1 (e), | ||
| L.5.1.2-2 (d) | Both sections are required. | ||
| This section, Key Personnel/Staffing Plan, states “Resumes must be provided in the format provided at J.12.” Is J.12 to be considered a template for Key Personnel resumes, or does J.12 identify the items that must be included in Key Personnel resumes? | L.5.1.3.1(a) | Attachment J.12 will be used as the template for Key personnel resumes. | |
| The Key Personnel identifies the “Operations Manager”; J.12 instead has “IT Operations Supervisor”. Please verify these are the same Labor Category. | H.17 (a) | ||
| J.11 | Yes they are the same | ||
| Is the Master Table of Contents excluded from the Executive Summary page count? The Table of Contents for Volumes I – V will exceed the 8 page restriction without any verbiage for the Executive Summary. Please clarify. | L.3.1, L.4.b | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| Q&A responses to the Draft RFP excluded Tables of Contents, Listing of Figures, Acronyms and Abbreviations, Resumes, and Commitment Letters from the page count. This verbiage is not included in the Final RFP. Please clarify. | L.3.2 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| Q&A responses to the Draft RFP excluded Tables of Contents, Listing of Figures, Acronyms and Abbreviations, Resumes, and Commitment Letters from the page count. This verbiage is not included in the Final RFP. Please clarify. | L.3.2 | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| Does the maximum contract value of $80,000,000 includes the cost of providing the equipment’s? | Under section B.3 – Minimum and Maximum Quantities | Yes. | |
| The table in the referenced RFP section lists Sections A, C, D, E, and F as part of the Volume VI Business Proposal. In Section L.8, these sections are listed as contents of the Volume V Contract Documentation. Additionally, Section B – Supplies or Services and Costs/Price is included in the Section L.8 instructions and not in the Section L.3.1 table. Please clarify that these Sections of the contract are to be included in Volume V rather than Volume VI. Additionally, please clarify whether or not Section B (from the Price Volume) is to also be included in Volume VI? | L.3.1 | Section A-C do not fall under Volume VI. Refer to revised Table L.3.1 as per Amendment 001. | |
| Clause H.15 Government Furnished Equipment states that the government –furnished property, if provided, will be identified at the task order level. Specifics regarding what GFP is made available are located in Section J attachments. Sect J.9 contains 68,980 items. Per the PWS section 2.C9a, the contractor is to arrange for full inventory, inspection and transfer Is it the government’s intent to have the contractor inventory and transfer all 68,980 items located at 21 different sites? | J.9 Final Government Furnished Equipment, Section H.15 Government Furnished Property and PWS 2.C.9.a. | No. J.9 is a comprehensive list of all GFE currently tagged. The IT contractor will be responsible for IT tagged items from that list. | |
| Has the GFP been appropriately tagged with RFID tags for inventory control? If not, please advise how controlled? | J.9 Final Government Furnished Equipment | GFE has been appropriately tagged. | |
| In order to provide the government with details about the contractor’s technical capabilities and ability to address program requirements the RFP limits the Technical/Management Volume to 60 pages. The government has included the Total Comp Plan, resumes and Staffing approach in the Management / Technical volume, thus reducing the actual pages to address technical and management approach. Would the government consider removing the Total Comp Plan, resumes and Staffing approach from the page count for this volume? | Page count | All pages will be included in the page count and page limits increased. Refer to revised Table L.3.1 as per Amendment 001. | |
| The transition period is not clearly defined in Section 2.C.9. Please confirm Contract Phase out is 6-months? Is the contractor to assume the Transition Phase in period is the same duration as phase out or 6 months? Please clarify? | Transition Period | Phase in and Phase out are both 6 months. | |
| In section B.4 of RFP has identified 32 Labor Categories, but J.11 only provides 5 Labor Categories Descriptions with minimum qualification identified. Would the government provide the minimum requirements to all Labor Categories? | Labor Category Descriptions Section B.4 and J.11 Min Qual Table | Refer to revised Attachment J.11 as per Amendment 001. |