J.1_IT_PWS.xlsx

XLSX spreadsheet 401 KB Posted

Attached to
INL/A GLOBAL AVIATION INFORMATION TECHNOLOGY SERVICES Federal contract opportunity
Solicitation number
SAQMMA13R0393
Issued by
Department of State Office of Acquisition Management

About this file

J.1 PWS

View the file

Other files for this federal contract opportunity

Other files attached to INL/A GLOBAL AVIATION INFORMATION TECHNOLOGY SERVICES, newest first.
File Type Posted
Amendment_004.docx DOCX document
Q A_Set__3.xlsx XLSX spreadsheet
Amendment_003.docx DOCX document
Q A_SET_2.xlsx XLSX spreadsheet
Amendment_002_7-28-14.docx DOCX document
J.5_Pricing_Tables_(IT)_7-28-2014.xlsx XLSX spreadsheet
SAQMMA13R0393-A001.pdf PDF
Q A_as_of_7.24.14.xlsx XLSX spreadsheet
J.1_IT_PWS_UPDATED.XLSX XLSX spreadsheet
J.11_IT_Services_MinQualsTABLE_UPDATE.XLSX XLSX spreadsheet
J.21_NATO_Briefing_Language_and_Certificate.pdf PDF
J.5_Pricing_Tables_(IT)_3-6-14.xlsx XLSX spreadsheet
J.6_Safety_directives.pdf PDF
J.19_Present_and_Past_Performance_Consent_Letter.docx DOCX document
J.13_DS-4184.pdf PDF
J.22_IT_Org_Chart.pdf PDF
J.9_Final_Government_Furnished_Equipment(GFE).xls XLS spreadsheet
J.3_DD_254.pdf PDF
J.2_Awd_Term_Plan.pdf PDF
J.24_Approved_Software_List.pdf PDF
J.15_Sample_Task_Order_1.pdf PDF
J.14_Past_Performance_Questionnaire.pdf PDF
J.11_IT_MinQualsTABLE_.xlsx XLSX spreadsheet
SAQMMA13R0393_(FINAL).pdf PDF
J.18_Tax_Exemption_from_Afghan_Ministry_of_Finance.docx DOCX document
J.12_Key_Personnel_Resume_Requirements.docx DOCX document
J.17_Glossary_of_Terms_and_Acronyms.pdf PDF
J.20_Client_Authorization_Letter.docx DOCX document
J.23_Network_Diagram.pdf PDF
QA_for_IT_3-24-2014.docx DOCX document
Posted_IT_RFP_QA_Mar_6_2014.xlsx XLSX spreadsheet
13R0393_Awd_Term_Plan_12_05_2013.docx DOCX document
Past_Perform_Questionnaire.pdf PDF
Attachment_5_Pricing_Tables_(IT)_11-25-13.xlsx XLSX spreadsheet
SAQMMA13R0393_v_3_16JAN_DRAFT.docx DOCX document
J-6_safetydirectives.pdf PDF
IT_PWS_11_Dec_2013.docx DOCX document
IT_20130919_SOR_V2_.xlsx XLSX spreadsheet
Industry_Day_Attendance_List.xlsx XLSX spreadsheet
4_Pillar_Industry_as_of_13_June.pptx PPTX presentation
IT_Airwing_6_June_1300.xlsx XLSX spreadsheet
20130606_INLA_IT_SOR_-_Word_Version.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

All lines

IT Performance
New Line Item NumberTitleInformation and Qualifications ( A & B) Major Requirement ( C-F)Related InformationEstimated QuantityPerformance StandardAnnual Labor HoursFlight ServicesIT/Communications ServicesLogistics ServicesMaintenance ServicesProgram ManagementTrainingSafety ComplianceExpand Line Item?
1GENERAL INFORMATIONGENERAL INFORMATION
1.APerformance Work Statement (PWS)Performance Work Statement (PWS): The PWS provided herein details requirements and tasks required to be performed by the contractor in order to achieve the program objectives. The contractor efforts are focused on achieving those specific objectives enumerated in the technical requirements and performance standards throughout the PWS.

Performance standards are provided for each PWS line item that requires a service delivery by the Contractor. Contractor will propose the Quality Assurance Surveillance Plan (QASP) as part of their solution. Remain flexible and responsive to changes in INL/A requirements and remain vigilant in the area of safety, personnel, and protection of property. Cost control, management control, and efficient use of resources are the cornerstone of best business operations.

1.A.1 PWS Organization PWS Organization: The PWS is organized into sections;

Section 1: Provides for general program background and mission information.

Section 2: Addresses management and administrative functions that the contractor must perform to ensure program requirements are met across the spectrum of the Global Aviation Program. The requirements of this section are crucial to proper program risk management and control of operations, safety and business functions.

Section 3: Addresses key performance requirements and tasks necessary to efficiently perform, manage, and administer the centralized headquarters components of DOS Air Wing at Patrick Air Force Base, Florida. The CONUS HQ is vital to the program management and support of OCONUS operations and serves as a key training center and supply chain hub.

Sections 4 -10: Addresses key performance requirements unique to the OCONUS sites and not addressed in Section 2.

1.A.1.a PWS Modification PWS Modification. This PWS provides the framework for the contractor and lays out the requirements, tasks, and performance standards required for success.

Requirement changes dictated by USG, process improvements, quality management, contract life-cycle management, and other systemic or programmatic changes will subsequently require changes to the PWS. These changes will be accomplished through modifications to the contract.

1.A.1.bIndefinite Quantity Indefinite Delivery (IDIQ)Indefinite Quantity Indefinite Delivery (IDIQ). IDIQ contracts will be utilized in support of DOS Air Wing program objectives. These are usually in support of projects related to aircraft acquisition, aircraft leasing, retrofit , critical flight safety and other DoS contracts. Task orders may be issued for additional tasks in accordance with Section G of the contract. PSO will monitor and report on all of these contracts, and all contracts under DOS Air Wing administration.
1.A.2DOS AIR WING GLOBAL AVIATION PROGRAMDOS AIR WING GLOBAL AVIATION PROGRAM
1.A.2.aIntroductionIntroduction: The Bureau for International Narcotics and Law Enforcement Affairs, Office of Aviation (INL/A), interchangeably referred to as DoS Air Wing, provides aviation support for the eradication and interdiction of illicit drugs, training of contractor and host nation personnel, movement of personnel and equipment, reconnaissance, personnel recovery (PR), medical evacuation, security of personnel and equipment, and ferrying of aircraft.

Operational missions may include but are not limited to: aerial eradication, manual eradication support, interdiction support, air assault, border security, external load, forward resupply, aerial transportation of personnel and cargo, Search and Rescue (SAR), SAR/MEDEVAC, disabled aircraft recovery, armed helicopter escort, maintenance test flights, aerial reconnaissance, surveillance and verification. Applicable missions are performed by contractor personnel at CONUS and OCONUS.

These operations are accomplished through multiple contracts, managed by the USG Program Office (INL/A), employing the Program Support Office (PSO) to plan, integrate, communicate, de-conflict, monitor and report on the associate Contractors who perform specialized services in the functional areas of flight operations, aircraft maintenance, logistical support, IT and communications, safety compliance, training support, acquisitions, and fleet-wide critical flight safety projects. In addition to specific goals and requirements relative to their contracted functional specialty and published standards of performance, each associate contractor on the DOS Air Wing program, including the PSO as integrator, is bound by the INL/A vision, mission, goals, and objectives in their respective contracts. Additionally, each contractor on the DOS Air Wing program is bound by an associate contractor agreement.

1.A.2.b Historical Information Historical Information: The Department of State Aviation Program, Air Wing, has been an instrument of national policy for over 30 years in drug producing countries. Aviation provides crucial mobility for reaching remote locations not accessible by other means due to poor road networks, security concerns and travel time. In many locations, the Department’s air assets provide the only means of medical evacuation, search and rescue and humanitarian support.

Historical Timeline:

• Program started in 1976 with eradication of poppy and marijuana in Mexico

• Conducted operations in Mexico, Colombia and Burma in the late 70’s

• First T-65 Turbo-Thrush procured in 1982

• Program expanded into South America in late 80’s

• Colombia expansion in mid-90’s

• Pakistan operations initiated in 2002

• Afghanistan operations initiated in 2005

• New operations in Guatemala began in 2008

• Support operations in Baghdad and Kabul in late 2009 •Operations in Honduras in 2012 •Nationalization of Bolivia in 2013 1.A.2.c INL/A Vision, Mission, Goals, and Objectives INL/A Vision, Mission, Goals, and Objectives.

Ultimately, INL/A seeks to accomplish its vision, mission and goals:

Vision: Be the provider of aviation services for the Department of State. Provide safe, secure and flexible aviation support to manage the aviation needs of the Department.

Mission: Provide aviation management, expertise and resources to strengthen law enforcement, support counter-narcotics, counter-terrorism efforts and provide safe and efficient aviation support to meet all Department of State aviation requirements.

Goal 1: Human Capital - Recruit and retain a highly adaptable, technically competent and diverse workforce. This goal focuses on the need to improve recruitment and retention of Office of Aviation technical and management personnel.

Objective 1.1: Recruit and retain exceptional aviation professionals.

Objective 1.2: Train and support incumbent professionals.

Objective 1.3: Support our professionals’ need to balance work-life with home-life.

Goal 2: Aviation Support - Provide safe and professional aviation support, while providing the best value in aircraft and technical integration services. This goal focuses on improving platform performance and cost efficiency by reducing the overall age of the fleet and providing more capabilities and upgraded technology.

Objective 2.1: Improve platform performance, reliability and cost efficiency by reducing the overall age of the fleet and providing more capabilities and upgraded technology Objective 2.2: Strengthen responsiveness, and requirements analyses for current and future programs. Continuously evaluate the fleet to best meet safety, security, responsiveness, and reliability requirements.

Objective 2.3: Act as the airworthiness authority for all Department of State titled aircraft.

Goal 3: Responsiveness to Customers - Provide high quality aviation support that responds to customers’ needs -- aircraft operations, maintenance, logistics, acquisitions and technical integration, to include outsourcing. This goal focuses on improvement of service to INL/A customers by providing all aircraft operations, including integration of technology on INL/A platforms and charter aircraft.

Objective 3.1: Improve customer satisfaction in aviation services by evaluating requirements in providing cost effective and reliable aircraft.

Objective 3.2: Recognition as the sole provider for all aviation support requirements within the Department.

Objective 3.3: Support the QDDR intent of “Preventing and Responding to Crisis and Conflict”: by providing aviation services quickly and securely to move diplomats and support personnel to global hotspots on demand.

Goal 4: Strategic Plans- Review, assess and develop plans for current and future Department of State aviation needs. This goal focuses on developing the Departments aviation requirements based on current and forecasted diplomatic missions.

Objective 4.1: Develop plans to provide aviation systems to emerging global requirements Objective 4.2: Determine the “fleet modernization” way forward to meet current and future operational needs.

Objective 4.3: Develop contingency plans (Risk Management) for Department of State aviation missions.

1.A.2.d Mission Environment Mission Environment: The mission is performed in several overseas nations under conditions which may be permissive or non-permissive, and which can be austere. INL/A may operate in denied areas under extremely hostile and very austere conditions. Operations are currently performed in Central Florida, Colombia, Honduras, Peru, Pakistan, Afghanistan, and Iraq.

1.A.2.e Rules of Engagement/Command Authority Environment Rules of Engagement/Command Authority: In most cases contractors fall under Chief of Mission (COM) authority and are required to follow all rules policies and procedures as established by resident RSO. In nearly all cases security is provided by COM, Host Nation Police or Military, or security forces contracted by same. In any case or location where INL/A is required to provide dedicated armed security, the Operations contract (SQAMMA13R0391) will undertake the provision of such.

Within that security arrangement the contractor is required to execute an internal force protection program not unlike the required, integral safety program. In cases where the arming of aircraft or personnel are required, the rules of engagement (ROE) will be established by presiding USG command authority.

1.A.2.f (Fig. 1)Acquisition Strategy
1.A.2.f (Fig. 2)Acquisition Strategy
1.A.2.f(Fig. 3)Federal Organization
1.A.2.f(Fig. 4)INL/A Contracts Division
1.A.2.gMission Objectives:Mission Objectives: INL/A is primarily responsible for supporting the U.S. Embassy Country Teams (generally through the INL- Post of each Embassy) in their effort to assist host nation governments in the eradication and interdiction of illicit crops as mandated in the Foreign Assistance Act of 1961. Other missions include border patrol and other security-related aviation activities. INL/A also supports the Embassy Country Team to instill these aviation capabilities within the host nation where applicable. In addition to foreign assistance support, INL/A also supports passenger and cargo movement as required by post.
1.A.2.hMission Requirements:Mission Requirements: In order to fulfill its core mission of providing aviation management, expertise and resources to strengthen law enforcement, support counter-narcotics, counter-terrorism efforts and provide safe and efficient aviation support to meet all Department of State aviation requirements, INL/A will perform operational missions which may include, but are not limited to: aerial eradication, manual eradication support, interdiction support, air assault, border security, external load, forward resupply, aerial transportation of personnel and cargo, Personnel Recovery (PR), CASEVAC/MEDEVAC, disabled aircraft recovery, armed helicopter escort, maintenance test flights, aerial reconnaissance, surveillance and verification. Applicable missions are performed by contractor personnel at CONUS and OCONUS locations.

Each associate contractor on the INL/A team is responsible for conducting and overseeing their respective functions to ensure overall INL/A air operations and aviation support missions are accomplished successfully and safely, while complying with all established ITAR/EAR, and other applicable regulations. Missions include conducting operations within the allocated flight hours for each aircraft, by country program. Where applicable, the goal is to transition all specified mission requirements to host-nation personnel at the earliest date possible. Due to the evolving nature of the mission, the contractor must remain flexible and be able to react to changing conditions quickly.

1.A.2.iNationalization:Nationalization: USG nationalization goals include reducing contractor presence in each applicable host nation over time. Since nationalization goals vary from country-to-country, specifics contractual requirements and goals shall be provided in each countries section of the PWS. Where applicable, the contractor will provide operations, standardization, training and safety oversight to ensure compliance with USG directives and the safe execution of the air support mission. The contractor will maintain record compliance in accordance with each country's requirements.
1.A.2.jProgram management and safetyProgram management and safety: The contractor will resource to meet program management requirements and goals. The contractor will provide a thorough understanding of the requirements and provide innovative technical and cost approaches to meet those requirements. INL/A encourages the Contractor to provide change proposals that promotes, increased contract efficacy, value, cost reductions, and safety. Safety must be foremost whenever conducting operations irrespective of the requirement or the threat environment. The contractor integrates all resources to achieve objectives and maintain the ability to deploy and adapt these resources to changing operational conditions. Due to the evolving nature of the mission, the contractor will be prepared to react to changing conditions quickly, with minimal impact to current operations. The contractor will be responsive to the requirements of the INL/A staff, the Embassy, and COM. Program management described in Section 2 is charged with ensuring personnel are focused on mission requirements, and customer satisfaction.

The Program Support Office (PSO) will augment the USG Safety staff by providing a qualified counterpart to the INL/A Safety Officer at Patrick AFB, FL to assist in management and oversight of the global INL/A Safety Program. The PSO will additionally provide a qualified Safety presence at each main operating base to ensure effective and consistent Safety oversight at all OCONUS locations in liaison with the INL/A Safety staff.

1.A.2.k DOS Air Wing Safety Program DOS Air Wing Safety Program: Implementation and management of the INL/A Safety Program will be a shared responsibility, with the Program Support Office (PSO) as lead administrators on behalf od INL/A and all associate contractors supporting and participating. The base line through all contracts will be the INL/A Safety Directives. Every associate contractor is required by its core contract and the ACA to comply with their respective responsibilities under the Safety Directives (SOP).

1.A.3Associate ContractsAssociate Contracts
1.A.3.aProgram Service OfficeProgram Support Office. (SAQMMA13R0044 Aviation Program Support Services

PSO Mission): The Program Support Office (PSO) will augment the USG Program Management Office's (PMO) capability to administer and oversee global DOS Air Wing operations by providing the integration, communication, de-confliction, planning and project management techniques required across a composite team of associate contractors, and performing comprehensive work requirements in the major categories of Program Operations; Program Office Support; Program Planning; Program Acquisition Support; Program Safety; Program Evaluation. Single Point, Program Wide Integration, Coordination and Implementation. Will provide a comprehensive safety program which includes aviation safety, FOD prevention, weapons and munitions safety, and occupational safety and industrial hygiene, including hazard communication. Comply with Department of State and other USG Directives for reporting and investigating injuries and incidents. Establish and maintain a safety program that complies with SMS requirements as required by ICAO, FAA, and ICAP. Track hazards and deficiencies, report aircraft accident facts, and assist with investigations. Track aircraft-related incidents relative to the number of hours flown. Track other safety incidents relative to man-hours worked. Establish and maintain a system to classify, evaluate, and track hazards during all phases of program and accident/incident investigations, and maintain a risk management file. The use of NTSB aircraft incident reporting criteria is explained in the INL/A Safety Directives. OSHA injury and illness rates are normally reported by Incident Rate Experience (IRE) as explained in OSHA Form 300.

1.A.3.bFlight ServicesOperations activities include mission support, operational mission planning, operational mission execution, and post mission analysis for fixed-wing and rotary-wing aircraft operations. Approved operational missions may include but are not limited to: aerial eradication, manual eradication support, interdiction support, air assault, border security, external load, forward resupply, aerial transportation, Personnel Recovery (PR), medical evacuation (MEDEVAC), casualty evacuation (CASEVAC), disabled aircraft recovery, armed helicopter escort, maintenance test flights, aerial reconnaissance, surveillance, verification and humanitarian relief. Applicable missions are performed exclusively by contractor personnel at CONUS locations, Iraq, and Afghanistan. Missions are performed by a mix of contractor and host nation personnel in Colombia. Missions are performed exclusively by host nation personnel, with contractor technical assistance and oversight at all remaining OCONUS locations. Operations support consists of an aviation life support equipment (ALSE) program management, intelligence, armament, force protection, operational mission planning, downed airmen activities (survival/evasion/escape procedures), and maintaining tactical communications.
1.A.3.cMaintenance ServicesThe Maintenance Services contract will provide all necessary maintenance services to ensure that fully mission capable aircraft are available to perform the many varied tasks as required by INL (post) and other applicable embassy officials. The goal is to provide effective maintenance support system that uses state-of-the-art business practices and streamlined processes that minimize infrastructure requirements in all fields of operation. Special focus shall be placed upon the induction of new aircraft into the contract schedule.
1.A.3.dLogistics ServicesLogistics Services contract will provide all necessary logistics services to ensure that fully mission capable aircraft are available to perform the many varied tasks as required by INL (post) and other applicable embassy officials. The goal is to provide effective logistical support system that uses state-of-the-art business practices and streamlined processes that minimize infrastructure requirements in all fields of operation. Special focus shall be placed upon the sourcing of replacement parts for obsolete fleet aircraft. This contract may also provide for Facilities Maintenance, Janitorial, Fuel servicing and food services at some locations.
1.A.3.eIT ServicesThe IT Services contract will provide Information Management (IM) support to contractor and Government personnel including seat management at various sites. Contract will provide for an enterprise-wide, web-based reporting system that provides information necessary to the successful management and execution of the contract. Provide an automated change request process to establish a prompt and efficient handling of all changes to INL/A infrastructure Per IT Policy 2140 Change Management Policy. Provide full life cycle management of information systems to include unclassified telecommunications, data processing, and computer systems. Comply with FISMA, FIPS, NIST, and applicable sections of FAM/FAH.
1.A.3.fTrainingTraining. The INL/A contract for Training Support is intended to be separate from existing, steady-state training requirements held by the various associate contractors. Training support under this contract is limited to such training which is not germane to the other associate contractor requirements. Typically it will include training for USG personnel, and select HN personnel as required by US Embassy staff. In both cases, these are outside the parameters of training requirements contracted under the functional prime contractors in the DOS Air Wing program. Training services under this delivery method are normally by task order, and often IDIQ. Normal regimen includes, but is not limited to Initial Entry Rotary Wing (IERW) course, cockpit transition courses, and periodic pilot recertification.
1.A.3.gSafety ComplianceSafety Compliance: The Safety Compliance contract will be an IDIQ type support contract to conduct independent, third party inspections at the request of USG. They may be tasked to support in safety related training or testing activities. They are independent of the daily working of the INL/A Safety Program, which is run by the PSO and associate contractors as a daily routine.
1.A.3.hOther Supporting ContractsOther Supporting Contracts: Program management of various acquisition and maintenance contracts in support of INL/A exclusive of the functional pillar contracts.
1.A.3.iContingent and Exigent OperationsContingent and Exigent Operations: Program management of various supporting contracts such as aircraft leasing, food service, guard service and other short term requirements that are contracted by INL/A exclusive of the functional pillar contracts.
1.A.4Contingent and Exigent OperationsContingent and Exigent Operations
1.A.4.aContingency OperationsContingency Operations: Using existing assets, provide mission capable and qualified crews. The contractor will, with a minimum notice, provide mission capable and qualified crews to deploy from existing sites to perform duties in other regions or countries within the region. These missions could last up to three months and will require logistical support to perform flight operations. These flight operations could consist of any aviation support missions as directed.
1.A.4.bEmergency/Humanitarian OperationsEmergency/Humanitarian Operations: The contractor will, with in one (1) hour of notification, provide qualified personnel to plan missions in support of natural disaster response, hurricane evacuations, humanitarian assistance, or other emergency operations as directed.
1.A.4.cSurge OperationsSurge Operations: Surge operations is defined as reaction to a COM directed operation throughout the country of assignment. Using existing assets, the contractor will provide mission capable and qualified crews for surge operations.
1.A.5NationalizationNationalization: Program management of Nationalization projects required in some associate contracts, at some sites. Monitor and report on USG nationalization plans, goals and timelines. Track revised contract objectives and contractor projects to meet them. Since nationalization goals vary from country-to-country, specific contractual requirements are provided to each affected associate contractor on the DOS Air Wing program.
1.A.6Enterprise Software TransitionEnterprise Software Transition: Primary management information system (MIS): DOSAW intends to transition from existing MIS application, known as Air Wing Information System (AWIS), for perpetual, near real-time tracking of all critical DOSAW program data. The program or application to carry the data will be proposed by the Maintenance contractor, as they will input and maintain the preponderance of data, and the accuracy of their data is so critical to safety. The proposed application must carry all the data currently handled in AWIS, plus all the data currently carried by various other applications or programs within the GINL enterprise system. Successful end-state will be a single, robust application to replace and improve upon AWIS, which carries all or most of the requisite data across the entire program. The application will carry all manner of critical information between Operations, Maintenance, Logistics, IT, PSO, and USG. Ultimately DOSAW will require a true Joint Information Environment (JIE) inside the enterprise system. The principal MIS and any other approved programs and applications running inside the enterprise system must cross-talk and complement one another.

Step #1 of the process is underway. DOSAW has a consultant conducting an independent analysis of the current AWIS system and its capabilities. We are also surveying the complete extent of data being carried by augmenting programs and applications, where AWIS cannot carry the data. We’ll identify cases where data in either of these columns cannot cross-talk. Closing the gap between the current capability to integrate and automate data, and future requirement to integrate and automate data will be the target of the aim of DOSAW. The mid- and high-level requirements for the MIS will be collected in advance and included in the Maintenance Services RFP. These requirements will include entries from the following organizations: Flight Operations, Logistics, PSO, IDIQ supporting contracts, Information Technology, Safety Compliance, Training, and Maintenance. Version 2 of the pillar contracts will include the results of this analysis. PSO version 3 will include those results as well.

Step #2 of the project will commence with the arrival of the PSO infrastructure architect, who will serve as the initial program manager until the Maintenance and IT partners arrive. PSO will form an integrated project team (IPT) early on consisting of DOSAW and incumbent contractor to plan the project and move it forward to the extent possible. Once the Maintenance contract is awarded, and the MIS application is known, the PSO PM will continue to push ahead with that information. If possible, DOSAW will bring on the selected software, or the Maintenance and IT Subject matter experts, or both, to join the IPT as early as possible in advance of transition commencement.

Step #3 begins with the arrival of the partner contractors. All will be represented in the IPT for this MIS project. Maintenance will become the subject matter expert for the software it proposed. IT and other arriving associate contractors will join the IPT as integral integral partners. PSO will continue to lead the IPT as project manager until project is complete. The IPT will provide guidance to the MIS Project Manager including decisions and directions as the MIS system goes through the typical project life-cycle phases to include: planning, development, implementation, monitoring & controlling, and project close-out (or transition to O&M). The government’s ability to monitor and control the appropriate milestones and activities of the vendor’s MIS Project will be accomplished via Readiness Reviews and Control Gate meetings. These meetings will be used to discuss business case solutions (or application modules within the larger MIS solution), risk analysis, availability of resources and possible changes in requirements.

The Integrated Project Team (IPT) will be comprised of working-level government employees from each of the above-mentioned INL/A organizations (i.e., functional areas) and non-government subject matter experts from the associate partner contractors. This team will work together to identify and address MIS Project-related issues and may recommend possible solutions. This working-level IPT will establish an INL/A Control Board as a forum to approve or disapprove proposed systems changes. Members of the IPT that may also participate in lab testing of use case scenarios to help verify the functional requirements are met within the new MIS system. This will be especially critical during the User Acceptance Review and Deployment Readiness Review of the MIS Project implementation effort. In essence, the Maintenance Services contract awardee will be required to provide the “how to” of the MIS Project solutions and the IPT will help monitor and control the work via readiness reviews and control gates.

AWIS will continue to be the primary MIS system during the transition while the new MIS is being developed and tested in the background. DOSAW understands the work to replace the existing Air Wing Information System (AWIS) system with a new MIS system will take more time than allowed by the 6-month transition period. While we are prepared to operate with AWIS as a primary for 1-2 years, that is not our aim. We seek to transition fully as soon as it may be safely and reliably accomplished. Once the implementation of the MIS Project is finalized and the existing AWIS application and hardware is decommissioned, the O&M services will transition to the vendor supporting the IT Services organization.

1.A.7 Government Furnished Property Government Furnished Property - Information and Documentation: USG will make available, for contractors use in planning, proposing and transitioning, all requisite information relative to continued program performance. The data sets are varied and have different levels of sensitivity. All will be released at the appropriate phase of competition, as determined by the Contracting Officer.

INL/A will provide widest possible array of data with this solicitation. This will include, but is not limited to technical manuals and drawings, maintenance manuals, operational manuals and directives. The bulk of the technical library is unclassified. As such it will be made largely available to contractors on line, via the INL/A web site at https://www.flydos.us/, or will be provided upon request of specific exhibits. Access to data posted at FBO is unhindered. Access to data at the web site, or by specific request, will be controlled by INL/A. Portions of the technical library that are affected by ITARS control would still be available at the web site, but will require the user, once granted access, to acknowledge their requirements under ITARS relative to safeguarding and controlling access and reproduction. Any portions of data restricted by copyright or other limited distribution will be posted as being in the inventory at INL/A. A contractor requiring access to these will coordinate directly with INL/A to determine if I it will be provided, and the means of transmission. Finally, a portion of technical data in the library, as much as 40%, is available in hard copy only. That will be a physical library located at INL/A facility in Melbourne, Florida.

A more sensitive data set includes historic data covering actual “burn rates” over a recent period. This would include such information as maintenance data, test data, part usage, shipping data, fuel burn rates, flight hours, and the like. The incumbent will consider all such data as sensitive. The competing companies will consider all such data as required for adequate planning and a competitive proposal. As such, the Contracting Officer will determine what data sets will be released, when, covering what level of detail, over what period of time, and to whom, and how it will be released. To best control the release, distribution, access, and monitoring of these sensitive data, they will be posted via GPE at http://www.fedbizopps.gov.

1.A.8Government Furnished FacilitiesGovernment Furnished Facilities: A list of the facilities available for contractor selection will be made available at time of solicitation/ request for proposal (RFP).
22-General Requirements2-General Requirements
2.AIntroduction: Information Technology ServicesINTRODUCTION: Information Technology Services:

This section of the PWS addresses the specific requirements assigned to the Information Technology Office which must be performed to ensure the DoS Air Wing objectives are met program-wide at all sites. Hereafter, the term “program-wide” shall be understood to include all prime contracts and sub-contracts under the DOS Air Wing Global Aviation Program. The term “all sites” shall be understood to include every geographical location in which DoS Air Wing operates. The contractor will maintain the flexibility to perform with changing mission requirements; employ new and emerging technologies; establish effective performance standards and metrics. The contractor will utilize Small Business Hub Zone Concerns. The order of precedence for regulatory guidance will be the Contract, DoS Regulations and Directives, Federal and DoD Regulations and Directives, Industry Standards, Best Business Practices. This order of precedence delineates procedures contractor personnel will use while conducting operations affecting Government aircraft or other aircraft for which the Government assumes at least some of the risk of loss. Contractor's procedures, in conjunction with contractor Job Qualifications, will be used to establish certification of contractor and host nation personnel to perform requirements as stated throughout the PWS.

The IT Office has the responsibilities to provide a wide array of IT support to INL/A’s programs worldwide. This government owned, contractor operated accredited system sensitive but unclassified (SBU) IT network enterprise, wide area network (WAN), and applications platform that combines tactical/satellite connectivity, network monitoring, and end-point protection to provide IT and communications to multiple locations throughout six (6) countries.

INL/A requires the full range of IT services in order to develop and deliver new products, support high employee productivity, develop, secure and maintain new IT systems, and design, deploy, and maintain the underlying infrastructure.Y
2.A.1SCOPESCOPE: INL/A requires contractor support services to aid the organization in providing Information Technology and Information Assurance efforts. Support Services under this contract will cover the period from date of award to the end of contract performance. Provide project management, project oversight and technical services for system problem resolution, system upgrades, system monitoring, operating system patches, system security management, system administration support, firewall maintenance, information assurance, desktop support and configuration management efforts as described in Section 2.C, Performance Requirements. There are multiple contractors (i.e., from more than one contract vehicle or company) supporting INL/A global, DOS, and other government agencies tasked to work on related activities. The IT support contractor will work with these contractors as required to satisfy INL/A requirements, goals, and objectives as efficiently and effectively as possible. This may include, but not limited to, sharing or coordinating information resulting from the work required by this PWS or previous government efforts, and/or working as a team to perform tasks in concert.Y
2.A.2CORE SERVICESCORE SERVICES

• Internet

• Intranet

• Email

• Voice over IP (VoIP)

• Mobile computing

• Virtual Machines (VM)

• Application and Database hosting

• IT and Customer support

• Satellite (select locations)

• IT Security

• Cloud computing (may be a future requirement) in accordance with approved DOS standards

The INL Office of Aviation, Information Management Division (INL/A/IM) provides IT services oversight.Y
2.A.3INL/A SitesINL/A Sites
Each site supports a full complement of IT services to users in the field, regardless of location. Network Services will be provided via Satellite or a USG approved local ISP. Each site will be capable of rapid deployment utilizing the Rapid Deployment Node (RDN) kits via aircraft as well as ground-based transportation. Terrestrial connectivity can be facilitated at sites where reliable local Internet Service Providers are available.Y
2.A.4Safeguarding InformationInformation given to the Contractor during the life of this contract shall only be used for the purpose of carrying out the provisions of this contract. Agency information marked "For Official Use Only" or bearing other sensitivity markings shall be handled in accordance with 12 FAM 512 regulations and shall not be divulged or disclosed without Agency permission. Requests for disclosure shall be addressed to the Contracting Officer Representative (COR). In conjunction with its relationship with the government, the contractor may have access to sensitive acquisition information, strategic planning documents and other information related to effort. The contractor is expressly prohibited from disclosing any privileged information to any person outside this contract or applicable USG personnel. All contractor personnel shall be required to sign a Nondisclosure Statement prior to access to being granted. No contractor Personally Identifiable Information (PII) or corporate specific information will be stored on the government network.YYYYYYY
2.A.5DeliverablesAll deliverables become property of the USG, and the contractor shall maintain no copies or drafts after contract termination. The results of any and all security countermeasures the contractor may design or develop under this contract shall become and remain the property of the USG and shall not be published or disclosed in any manner. The contractor must insure the accuracy and completeness of all deliverables in accordance with referenced policy, regulations, laws, and directives. Errors, misleading statements, and/or incomplete information discovered shall be considered defects and shall be subject to correction by the contractor at no additional costs to the government.Y
2.BPersonnel- Minimum QualificationsPersonnel- Minimum QualificationsY
2.B.1Minimum QualificationsMinimum Qualifications: Personnel with USG dictated minimum requirements are identified in attachment J.11 of the contract. The qualifications of employees shall meet or exceed those prescribed by INL/A.

Temporary replacements who do not meet minimum qualification requirements will require USG approval. We define temporary incumbent lapses as, for vacation and business trips, no longer than 30 consecutive calendar days and no more than a total of 45 calendar days each year, unless approved by the USG.

Permanent replacements: In cases where incumbent lapses are not temporary, the Contractor shall provide a fully qualified replacement at Contractor expense.

Including these USG minimum requirements, plus any additional requirements you deemed necessary, consolidate these under Section J, List of Attachments, J.11, titled IT MinQuals Table.

Y
2.B.2Security Clearance RequirementsSecurity Clearance Requirements: US citizen contractor personnel must pass and possess a Moderate Risk Public Trust (MRPT) certification or Secret clearance, depending on contract requirement, prior to hire. Non-US citizens contractor personnel must pass and possess a US Embassy background investigation (BI) provided by the RSO from the US Embassy in their home nation. Comply with applicable portions of DoD Defense Security Services Directives (DS Standards) and 41 CFR 102-33, 12 FAM 570-579 and NISPOM.
2.B.2.aAdministrator Clearance RequirementsAdministrator Secret clearance. All IT administrators must possess a minimum of a Secret clearance. Per 3 FAM178, Security Clearance and Suitability Requirements, all personnel must maintain a clearance level of Secret to perform administrator-related functions on IT systems.Y
2.B.3U.S. government IdentificationThe contractor will be responsible for coordinating and assisting all contractors that require US Government identification (i.e. Facility Access card).
2.CPERFORMANCE REQUIREMENTS COMMON TO ALL SITESPERFORMANCE REQUIREMENTS COMMON TO ALL SITES
2.C.1Administration of the INL/A Program Wide Integrated Software Solution.Administration of the INL/A Program Wide Integrated Software Solution.
2.C.1.aEnterprise Software AdministrationProvide administration of the implemented enterprise solution.Administration includes, but is not limited to backups of databases, installation of software upgrades or patches, support to Certification and Accreditation process, user login, password resets, software training and reference material.One Enterprise wide software application supporting all associated contracts supporting this INL/A activities at various locations (currently eight). Up to 2000 personnel and other users throughout the scope of all IT support related to this program.1. Certification is maintained on all systems and applications annually.

2. DOS accreditation standards are met: 0 critical finds, no more than 5 moderate findings, 65% of the low findings must be mitigated.

3. No more than one (1) valid customer complaint per month.Y
2.C.2IT Customer Support ServicesIT Customer Support ServicesIT Cusotmer support Services includes but not limited to...first level support (Tier 1 and Tier 2), IT Service Desk and IT Service Delivery, initial troubleshooting. This service requires that a frontline support staff be highly trained in order to help resolve problem on the first engagement.

(40) USG Personnel at PAFB Up to (54) USG Personnel in Colombia Up to (4) USG Personnel in Peru Up to (3) USG Personnel in Pakistan Up to (8) USG Personnel in Afghanistan Up to (8) USG Personnel in Iraq

See belowY
2.C.2.aTroubleshoot issuesTroubleshoot the issue and determine the cause of the problemUser workstations and/or accessories may go bad and will need to be replaced. User may have various access or software issues that need to be resolved.Monthly avg estimate: 110Within 2 hours of opening of a service request

< 1 hour = exceed > 1 but < 2 hours = Met

> 2 hours = failedY
2.C.2.bAnswer all callsAnswer every call by support staff (not automated system) for support (7 x 24 x 365)A system to record date and time of incoming phone calls will enable data collection for the purpose of generating statistics and provide reports of phone calls made to the Help Desk. These phone calls must be answered by a human in order to address critical situations that may arise in other time zones (i.e. Iraq, Afghanistan, etc.)Monthly avg estimate: 105Every phone call

< 1% dropped call = exceed 1% but 5% hours = met

> 5% = failedY
2.C.2.cEnter service request into a ticketing systemAnswer all phone calls, discuss during a "walk-up", or read e-mail and enter service request details into a ticketing system.Users will need to contact a help desk via phone, "walk-up", or e-mail for support. The help desk personnel will need to open a ticket and record the relevant contact information and the details of the problem.Monthly avg estimates: PAFB- 250

Colombia- 150 Peru- 50 Pakistan- 35 Afghanistan- 150 Iraq- 200 Within 2 hours of opening of receiving an e-mail < 1 hour = exceed > 1 but < 2 hours = met

> 2 hours = failedY
2.C.2.dProvide ticket numberProvide a ticket number to the user during the initial phone conversation or immediately after create a ticket from e-mail.Users will need to contact a help desk via phone or e-mail for support. The help desk personnel will need to open a ticket and record the relevant contact information and the details of the problemMonthly avg estimates: PAFB- 250

Colombia- 150 Peru- 50 Pakistan- 35 Afghanistan- 150 Iraq- 200 Within during a phone call requesting service > 96% hour = exceed > 90% - 95% = met

< 90% = failedY
2.C.2.eResolve problems on initial callAttempt to resolve the problems via the initial phone call.Users will need to contact a help desk via phone or e-mail for support. The help desk personnel will need to open a ticket and record the relevant contact information and the details of the problem. Must provide a system to track the statistics of phone calls made to the Help Desk.Monthly avg estimate: 105
(Approx 50% resolved)During Initial Phone Call

> 96% hour = exceed > 90% - 95% = met

< 90% = failedY
2.C.2.fReplace failed hardwareReplace failed hardware.User workstations and/or accessories may go bad and will need to be replacedMonthly avg estimate: 15Within 72 hours of opening of the service request

< 24 hour = exceed > 24 but < 72 hours = met

> 72 hours = failedY
2.C.2.gReconfigure, re-install, or modify softwareReconfigured application, re-installed software, or modified software settings.User workstations and/or accessories may go bad and will need to be replacedMonthly avg estimate: 10Within 4 hours of opening of the service request

< 2 hour = exceed > 2 but < 4 hours = met

> 4 hours = failedY
2.C.2.hConfirmation before closing ticketReceive e-mail or phone confirmation from the user that the problem has been resolved before closing a ticketMust close service request tickets only when the customer problem has been resolvedMonthly avg estimate: 90Every service request

> 98% users contacted = exceed 95% to 98% users contacted = met < 95% = failed 2.C.2.i Resolution entered into ticket at closing Enter the resolution to the problem upon closing the ticket Must document the resolution for each service request Monthly avg estimate: 90 Every service request > 98% problems entered = exceed 95% to 98% problems entered = met < 95% = failed 2.C.2.j Customer satisfaction survey Send a customer satisfaction survey to the POC in each service request after closing the ticket. Customer Satisfaction must be measured Monthly avg estimate: 95 Every service request > 98% surveys sent = exceed 95% to 98% surveys = met < 95% = failed 2.C.2.k Notify end-users of potential changes Notify end-users of potential changes to the network that may affect their operations. Before affecting network or application changes, the end-users must be notified of the potential impact to their operations. A draft document will need to be created and provided to the government for approval or modification prior to sending to the end-users. All changes affecting users (est. 10 per month) Sending government approved text to end users before affecting change > 95% = exceed 90% to 95% = met

< 90% is failedY
2.C.3Operations SupportOperations SupportOperations support includes but not limited to…second level support (Tier 2), network monitoring, system access, general systems administration
2.C.3.aMaintain network availabilityMaintain network availability of 98% for all networksContinuous connectivity between sites through service provider circuits is paramount to continuity of operations. Monitoring of the network connections (Primary, alternate, and redundant paths) will ensure problems are found as quickly as possible so that these problems can be resolved as quickly as possible. Constant monitoring of connectivity (i.e. logical connections) and quality (i.e. latency) from the server room to the Internet and connections to remote locations.28 circuitsdivide total minutes of all circuit outages per month by total minutes of all circuits in a month

< 2% = exceed 2% = met

> 2% = failedY
2.C.3.bMonitor circuitsMonitor circuits and create a service request ticket for circuit outages and for circuits with 20% degradation of circuit qualityMaintaining continuous connectivity between sites through service provider circuits is paramount to continuity of operations. Monitoring of the network connections (Primary, alternate, and redundant paths) will ensure problems are found as quickly as possible so that these problems can be resolved as quickly as possible. Constant monitoring (manually or automated via software tools) of connectivity (i.e. logical and physical connections) and quality (i.e. 20% increase in latency for over 15 minutes from average) from the server room to the Internet and onward to remote locations will ensure circuit failures and degradation is resolved as quickly as possible.5 Outages per monthOpen a service request ticket within 30 minutes of failure or degradation of circuit quality

> 95% = exceed 90% to 95% within 30 minutes = met

< 90% within 30 minutes = failedY
2.C.3.cTest RDN kitsTest Rapid Deployment Node (RDN) kits to ensure 100% operations.Rapid Deployment Nodes (RDN) kits are portable kits that include hardware (i.e. servers, switches, routers, security appliances, and power supplies). These kits are tested to ensure operational readiness. There are 12 kits that are in current operation in the field or in stock ready for deployment.1 kit tested and/or repaired per 90 daysComplete 100% functional testing of each RDN kit components before shipment to the field

100% = met

<100% = failedY

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .