Appendix J-8 - Altronix Power Supply Worksheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Domestic Security Installation Services - 100% Small Business Set-Aside
Solicitation number
SAQMMA11R0187
Issued by

About this file

Appendix J-8 - Altronix Power Supply Worksheet

View the file

Other files

File Type Posted
SF30 Domestic Security Installation Services A003.docx DOCX document
Appendix J-22 - STAC Overview.docx DOCX document
DME Solicitation Document - A002.docx DOCX document
SF30 Domestic Security Installation Services A002.docx DOCX document
Appendix J-1 - Projected Workload Table - A002.xlsx XLSX spreadsheet
SF30 Continuation Pages - A002.docx DOCX document
Exhibit B - Pricing Tables - A002.xlsx XLSX spreadsheet
Exhibit B - Pricing Tables - A001.xlsx XLSX spreadsheet
DME Solicitation Document - A001.docx DOCX document
SF30 Continuation Pages - A001.docx DOCX document
Appendix J-1 - Projected Workload Table - A001.xlsx XLSX spreadsheet
SF30 Domestic Security Installation Services A001.docx DOCX document
Appendix J-18 - Preventive Maintenance Procedure Times.docx DOCX document
Appendix J-16 - Medium Project.pdf PDF
Appendix J-14 - UL-681 Quality Audit Checklist.xlsx XLSX spreadsheet
Appendix J-7 - Quality Audit Review of DME SOW Example.xlsx XLSX spreadsheet
Exhibit B - Pricing Tables.xlsx XLSX spreadsheet
Appendix J-1 - Projected Workload Table.xlsx XLSX spreadsheet
Appendix J-3 - Facility Security Engineering Division Overview.docx DOCX document
Exhibit A - Past Performance Questionnaire.docx DOCX document
Appendix J-17 - Large Project.pdf PDF
Appendix J-19 - First Responder Historical Work Order Data.docx DOCX document
Appendix J-11 - CCTV Martix Worksheet.xlsx XLSX spreadsheet
Appendix J-20 - Bidders Form DD 254.pdf PDF
Appendix J-12 - DME Infastructure Checklist.xlsx XLSX spreadsheet
Appendix J-15 - Small Project.pdf PDF
DME Solicitation Document.docx DOCX document
Appendix J-9 - Intrusion Detection Zone Checklist.xlsx XLSX spreadsheet
DME SF-33.docx DOCX document
Appendix J-5 - CMMS SOP Listing.docx DOCX document
Appendix J-21 - SCA Wage Determination.pdf PDF
Appendix J-4 - Domestic Customers and Facilities.docx DOCX document
Appendix J-2 - Acronyms and Definitions.docx DOCX document
Appendix J-10 - ACS Door Worksheet.xlsx XLSX spreadsheet
Appendix J-6 - Applicable Authorities and Publications.docx DOCX document
Appendix J-13 - DME iSTAR Panel Worksheet.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CWS0003R1C0

ALTRONIX POWER SUPPLY WORKSHEETAUDITOR(S)DEVICE LOCATION
DATEPROJECT NUMBER
STATUS KEY: √ = OK / PASS X = NO / FAIL N I = NOT INSTALLED N A = NOT APPLICABLE N T = NOT TESTED
QUALITY POINTSTATUSREMARKSNo.
Verify power supply installed IAW plan set &/or change order.1
Statement of Work
Verify power supply securely mounted.2
2002 NEC, paragraph 110.13(a)
Verify minimum 4" vertical spacing between power supplies.3
DME Design Standards pg.STD-019
Verify door on power supply can be opened 90 degrees.4
2002 NEC, paragraph 110.26(A)(2)
Verify minimum 30" workspace in front of panel.5
2002 NEC, paragraph 110.26(A)(2)
Verify power supply is bonded.6
2002 NEC, paragraph 250.90
Verify power supply is uniquely identified with label.7
Statement of Work and Drawings --Multiple power supplies
Verify electric panel & breaker number are indicated on front of power supply.8
Statement of Work
Verify breaker number indicated on power supply cover is correct breaker.9
2002 NEC, paragraph 408.4
Verify ER panel legend is correctly labeled for power supply.10
2002 NEC, paragraph 408.4
Verify LED indicator lamp functioning.11
Altronix power supply installation instructions
Verify all cables exiting power supply are labeled.12
Statement of Work
Verify labeling on cable(s) is legible.13
Statement of Work
Verify cable management inside power supply is installed in a workmanlike manner.14
2002 NEC, paragraph 110.12
Verify one 12VDC battery is installed.15
Verify power supply continues to function with AC power removed.16
Altronix Installation Instructions
Verify AC Power Fail alarm output connects to input on I*STAR Panel.17

Verify DC Power Fail alarm output connects to input on I*STAR Panel. 18

&"Times New Roman,Regular"U.S. Department of State

Solicitation No. SAQMMA11R0187&"Times New Roman,Bold"APPENDIX J-8
ALTRONIX POWER SUPPLY WORKSHEET&"Times New Roman,Regular"Domestic Security Installation Services

Section J: Appendices

&"Times New Roman,Regular"Appendix J-8 Altronix Power Supply Worksheet &"Times New Roman,Regular"J-8-&P

File details come from the government source that posted it. Updated .