S02 - Wage Determination WI 20250905.pdf

PDF 64 KB Posted

Attached to
Z2DA--695-22-117 CN New Audiology Clinic 5BN
Solicitation number
36C25225B0024
Issued by

About this file

This document is a Davis-Bacon wage determination for building construction projects in Milwaukee, Ozaukee, Washington, and Waukesha Counties in Wisconsin, effective for 2025. The wage determination details minimum wage rates for various construction trades and worker classifications, with rates ranging from $37.13 for sound and communications installers to $61.96 for elevator mechanics. The document specifies different minimum wage requirements based on contract dates: contracts entered on or after January 30, 2022, must pay at least $17.75 per hour, while contracts awarded between January 1, 2015, and January 29, 2022, must pay at least $13.30 per hour. The wage rates include both hourly wages and fringe benefits, and cover trades such as asbestos removal workers, boilermakers, carpenters, electricians, painters, plumbers, and truck drivers, among others.

View the file

Other files

File Type Posted
36C25225B0024 0009.docx DOCX document
S06 - Response 12.31.25 Pre-Bid RFIs_695-22-117_1.14.26 RFI 154.xlsx XLSX spreadsheet
36C25225B0024 0008.docx DOCX document
36C25225B0024 0007.docx DOCX document
S06 - Response 12.31.25 Pre-Bid RFIs_695-22-117_1.12.26 RFIs 152_153.xlsx XLSX spreadsheet
S06 - Wage Determination 0006.txt TXT text file
S06 - Response 12.31.25 Pre-Bid RFIs_695-22-117_12.9.25 RFIs 1 -151.pdf PDF
0006 Narrative.pdf PDF
S06 - Amendment 0006 2of2 (1).pdf PDF
S06 - Amendment 0006 1of2.pdf PDF
S06 - 36C25225B0024 0006.pdf PDF
36C25225B0024 0005.docx DOCX document
36C25225B0024 0004.docx DOCX document
S06 - Pre-bid Site Visit 30 attended 20251120.pdf PDF
S06 - 36C25225B0024 0003.pdf PDF
S06 Spec section 00 01 15 list of Drawings sheets pp 123 w notes.pdf PDF
S06 - P000 - PLUMBING COVERSHEET.pdf PDF
S06 - 6c-695-22-117-Drawings Vol 1 General_Site_AESOC_Code_HazMat_13_pages 02.pdf PDF
S06 - 6a -695-22-117 VAMKE Audiology_100pc CD_Vol One Specifications Div 00-14.pdf PDF
S06 - 695_22_117 Drawing Sheet AI406 reissuse 13 Nov 2025.pdf PDF
Copy of S06 - Pre-Bid RFIs_695-22-117_11.18.25.xlsx XLSX spreadsheet
36C25225B0024 0002.docx DOCX document
36C25225B0024 0001.docx DOCX document
S02 - 695-22-117 VAMKE Audiology - 100pc CD - Vol Two Specifications Div 21-28.pdf PDF
S02 - 695-22-117 Drawings Vol 1_Architectural_Sec_Details_WallTypes Sheets 8.pdf PDF
S02- 695-22-117 Door Hardware Single Source Justification_Executed.pdf PDF
ATTACHMENT 1_VAAR 852.219-75 JAN2023_REQUIRED TO COMPLETE.pdf PDF
S02 - 695-22-117 Vol 2 Drawings Electrical Low Voltage Sheets 14.pdf PDF
S02 - 695-22-117 Drawings_ Vol 2 Plumbing_Med Gas_Pneumatic Tube Sheets 11.pdf PDF
S02 - 695-22-117 Drawings Vol 1 Furniture_7 sheets.pdf PDF
S02 - 695-22-117 Drawings Vol 1 Equip_Sound Booths_Interiors_Signage Sheets 12 02.pdf PDF
S02 - MAP of East Entry for Site Visit 10.16.2025.pdf PDF
S02 - 695-22-117 Bldg Automation n HVAC Cntrl System Single Source Justification_Executed.pdf PDF
S02 - 695-22-117 Sole Source Justification_Nurse Call_Executed.pdf PDF
S02 -695-22-117 VAMKE Audiology - 100pc CD - Vol One Specifications Div 00-14.pdf PDF
S02 - 695-22-117 Drawings Vol 2_ FireProtection Sheets 6.pdf PDF
S02 - 695-22-117 Drawings Vol 2 Mechanical Sheets 17.pdf PDF
S02 - 695-22-117_Drawings Vol 1_Architectural Plans Sheets16.pdf PDF
S02 - 695-22-117 Fire Alarm System Single Source Justification_Executed.pdf PDF
36C25225B0024_1.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: WI20250001 09/05/2025

Superseded General Decision Number: WI20240001

State: Wisconsin

Construction Type: Building

Counties: Milwaukee, Ozaukee, Washington and Waukesha Counties in Wisconsin.

BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 01/10/2025 2 02/21/2025 3 03/14/2025 4 05/23/2025 5 06/06/2025 6 06/27/2025 7 07/11/2025 8 08/08/2025 9 08/15/2025 10 08/29/2025 11 09/05/2025

ASBE0019-001 06/01/2025

Rates Fringes

Asbestos Removal worker/hazardous material handler Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not.............$ 45.88 38.15

BOIL0107-001 01/01/2025

10/6/25, 2:57 PM SAM.gov https://sam.gov/wage-determination/WI20250001/11 1/7

Rates Fringes

BOILERMAKER

Boilermaker.................$ 46.52 34.63

BRWI0005-001 06/01/2025

Rates Fringes

TERRAZZO WORKER..................$ 42.24 26.78

TILE LAYER.......................$ 41.27 26.78

BRWI0008-001 06/01/2025

Rates Fringes

BRICKLAYER.......................$ 45.72 27.42

BRWI0008-003 06/01/2025

Rates Fringes

Marble Mason.....................$ 45.72 27.42

CARP0231-001 06/01/2025

Rates Fringes

Carpenter & Soft Floor Layer (Including Acoustical work and Drywall hanging;

Excluding Batt Insulation).......$ 47.73 31.52

CARP2337-002 06/03/2024

Rates Fringes

MILLWRIGHT.......................$ 42.31 32.21

CARP2337-008 06/03/2024

Rates Fringes

PILEDRIVERMAN....................$ 42.21 34.07

ELEC0494-001 06/01/2025

Rates Fringes

ELECTRICIAN......................$ 50.86 28.26

* ELEC0494-003 06/01/2025

Rates Fringes

Sound & Communications Installer...................$ 37.13 21.58 Technician..................$ 37.13 21.58

Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems. Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system.

work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products

ELEV0015-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 61.96 38.435+a+b

FOOTNOTE:

a. PAID VACATION: 8% of regular basic for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0139-001 06/01/2025

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA

COUNTIES

https://sam.gov/wage-determination/WI20250001/11 2/7

Power Equipment Operator Group 1.....................$ 55.21 28.55 Group 2.....................$ 54.71 28.55 Group 3.....................$ 54.21 28.55 Group 4.....................$ 52.72 28.55 Group 5.....................$ 48.74 28.55 Group 6.....................$ 43.59 28.55

HAZARDOUS WASTE PREMIUMS:

EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or w/o attachments with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Self-Erecting Tower Cranes over 4000 lbs lifting capacity; All Cranes with Boom Dollies; Boring Machines (directional); Master Mechanic.

$0.50 additional per hour per 100 tons or 100 ft of boom over 200 ft or lifting capacity of crane over 200 tons to a maximum of 300 tons or 300 ft. Thereafter an increase of $0.01 per ft or ton, whichever is greater.

GROUP 2: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; or Cranes, Tower Cranes Portable Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leadsand/or jib lengths measuring 175 feet or less; Backhoes (excavators) 130,000 lbs and over; Caisson Rigs; Pile Drivers; Boring Machines (vertical or horizontal), Versi-Lift, Tri-Lift, Gantry 20,000 lbs & over.

GROUP 3: Backhoe (excavator) under 130,000 lbs;Self-erecting Tower Crane 4000 lbs & under lifting capacity;Traveling Crane (bridge type); Skid Rigs; Dredge Operator; Mechanic;

Concrete Paver (over 27E); Concrete Spreader and Distributor; Forklift/ Telehandler (machinery- moving / steel erection); Hydro Blaster, 10,000 psi and over

GROUP 4: Material Hoists; Stack Hoists; Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 5 tons or under (tractor or truck mounted); Hoist (tuggers 5 tons & over); Hydro-Excavators/Daylighters; Concrete Pumps Rotec type Conveyors; Tractor/Bulldozer/End Loader (over 40 hp);

Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier;

Welder; Bituminous Plant and Paver Operator; Roller over 5 tons; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Rotary Drill Operator and Blaster; Percussion Drill Operator; Air Track Drill and/or Hammers; Gantrys (under 20,000 lbs); Tencher (wheel type or chain type having 8 inch or larger bucket); Milling Machine; Off-Road Material Haulers.

GROUP 5: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machines (road type); Rubber Tired Roller;

Concrete Batch Hopper; Concrete Conveyor Systems; Grout Pumps; Concrete Mixers (14S or over); Screw Type Pumps and Gypsum Pumps; Tractor, Bulldozer, End Loader (under 40 hp);

Trencher (chain type, bucket under 8 inch); Industrial Locomotives; Rollers under 5 tons; Stump Grinder/Chipper (Large); Timber Equipment; Firemen (pile drivers and derricks); Personnel Hoist, Telehandler over 8000 lbs;

Robotic Tool Carrier with or without attachments

GROUP 6: Tampers - Compactors (riding type); Assistant Engineer; A-Frames and Winch Trucks; Concrete Auto Breaker;

Hydrohammers (small); Brooms and Sweepers; Hoist (tuggers under 5 tons); Boats (Tug, Safety, Work Barges, Launch);

Shouldering Machine Operator; Prestress Machines; Screed Operator; Stone Crushers and Screening Plants; Screed Operators (milling machine), Farm or Industrial Tractor Mounted Equipment; Post Hole Digger; Fireman (asphalt plants); Air Compressors over 400 CFM; Generators, over 150 KW; Augers (vertical and horizontal); Air, Electric, Hydraulic Jacks (slipform); Skid Steer Loaders (with or without attachments); Boiler Operators (temporary heat);

Refrigeration Plant/Freeze Machines; Power Pack Vibratory/Ultra Sound Drivers and Extractors; Welding Machines; Heaters (mechanical); Pumps; Winches (small electric); Oiler and Greaser; Rotary Drill Tender;

Conveyor; Forklifts/Telehandler 8000 lbs & under;

Elevators: Automatic Hoists; Pumps (well points);

Combination Small Equipment Operators

IRON0008-005 06/01/2025

Rates Fringes

IRONWORKER.......................$ 47.52 33.67

https://sam.gov/wage-determination/WI20250001/11 3/7

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

LABO0113-001 06/02/2025

Rates Fringes

LABORER

(1) General Laborer (Including Plaster Tender)..$ 40.48 23.92

(2) Air & Electric Equipment, Mortar Mixer, Scaffold Builder, Erector, and Swing Stage.............$ 40.62 23.92

(3) Jackhammer Operator, Gunnite Machine Man.........$ 40.77 23.92

(4) Caisson Worker - Topman.$ 40.86 23.92

(5) Construction Specialist.$ 41.09 23.92

(6) Nozzleman...............$ 41.13 23.92

(7) Caisson Work............$ 41.28 23.92

(8) Barco Tamper............$ 41.97 23.92

LABO0113-010 06/02/2025

Rates Fringes

Asbestos Laborer Asbestos Abatement [Preparation, removal, and encapsulation of hazardous materials from non-mechanical systems].........$ 40.48 23.92

PAIN0781-001 06/01/2025

Rates Fringes

Painters:

(1) Brush, Roller...........$ 42.44 24.87

(2) Spray & Sandblast.......$ 43.19 24.87

(3) Drywall Taper/Finisher..$ 42.79 24.87

PAIN1204-002 06/01/2025

Rates Fringes

GLAZIER..........................$ 49.79 25.15

PLAS0599-004 06/01/2025

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 43.27 25.69

PLAS0599-005 06/01/2025

Rates Fringes

PLASTERER........................$ 39.89 28.04

PLUM0075-001 06/01/2025

Rates Fringes

PLUMBER (Including HVAC work)....$ 60.05 27.90

PLUM0601-001 06/01/2025

Rates Fringes

PIPEFITTER (Including HVAC work)............................$ 58.92 31.34

SFWI0183-001 07/01/2025

Rates Fringes

SPRINKLER FITTER.................$ 52.40 34.31

SHEE0018-001 06/01/2025

Rates Fringes

Sheet Metal Worker (Including HVAC duct work and Technicians).....................$ 58.03 29.98

TEAM0662-003 06/01/2025

Rates Fringes

TRUCK DRIVER

1 & 2 Axles.................$ 39.57 28.70 3 or more Axles.............$ 39.72 28.70

* SUWI2002-002 01/23/2002

https://sam.gov/wage-determination/WI20250001/11 4/7

Asbestos Worker/Heat and Frost Insulator..................$ 25.36 8.37

Laborers:

Concrete Worker.............$ 16.34 ** 3.59 Landscape...................$ 8.73 ** 8.40

ROOFER...........................$ 18.01 3.28

Tile & Marble Finisher...........$ 13.89 ** 7.43

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to https://sam.gov/wage-determination/WI20250001/11 5/7 reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

https://sam.gov/wage-determination/WI20250001/11 6/7

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

https://sam.gov/wage-determination/WI20250001/11 7/7