S02 - 695-22-117_Drawings Vol 1_Architectural Plans Sheets16.pdf
PDF 9 MB Posted
- Attached to
- Z2DA--695-22-117 CN New Audiology Clinic 5BN
- Solicitation number
- 36C25225B0024
About this file
These architectural documents are detailed construction plans for the VA Milwaukee Renovate 111 project, specifically for a fully sprinklered medical facility. The plans include comprehensive floor plans, demolition plans, roof plans, and detailed construction drawings for the third through fifth floors. The documents cover various technical aspects such as infection control, ceiling plans, raised floor details, and exterior demolition elevations. Prepared by IMEG and ATC Architecture, the plans are for the Office of Construction and Facilities Management, with a focus on precise architectural and engineering specifications for a healthcare renovation project.
The drawings include technical details like construction wall partitions, infection control risk assessments, floor and ceiling penetration details, and specific room layouts. Highlighted areas are marked in red, indicating specific zones of demolition, reconstruction, or modification. The plans show multiple floor levels with grid-based layouts, including details for stairs, platforms, service areas, and various room configurations typical of a medical facility. The documents are dated May 20, 2020, and are part of a comprehensive set of construction documents for a VA medical facility renovation.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAMIWGeorgK Rectangle
THE VA RESERVES THE RIGHT TO ANY REMOVED MATERIALS OR ITEMS.
CONTRACTOR TO COORDINATE WITH COR.
File details come from the government source that posted it. Updated .