S02 - 695-22-117 Drawings Vol 2_ FireProtection Sheets 6.pdf
PDF 5 MB Posted
- Attached to
- Z2DA--695-22-117 CN New Audiology Clinic 5BN
- Solicitation number
- 36C25225B0024
About this file
These documents are Fire Sprinkler and Fire Alarm design drawings for the VA Milwaukee Renovate 111 Audiology SBM project, specifically focusing on an existing healthcare facility that will be fully sprinklered. The drawings, prepared by IMEG and Arc Architects, detail the fire protection systems for the fifth floor, including comprehensive fire alarm and sprinkler installation plans.
The technical drawings include multiple detailed views such as typical fire alarm device mounting guidance, duct smoke detector details, fire alarm device mounting heights, sprinkler arm over details, and audiology booth sprinkler details. The plans cover Zone 5B, an existing healthcare space, and provide extensive technical specifications for demolition and installation of fire protection systems, with particular attention to mounting heights, device placement, and system integration. The documents are part of a VA Office of Construction and Facility Management project, with the drawings dated May 20, 2023.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .