S06 - 6c-695-22-117-Drawings Vol 1 General_Site_AESOC_Code_HazMat_13_pages 02.pdf

PDF 14 MB Posted

Attached to
Z2DA--695-22-117 CN New Audiology Clinic 5BN
Solicitation number
36C25225B0024
Issued by

About this file

This document is a set of architectural and engineering design drawings for the VA Milwaukee Renovate 111 Audiology 5BN project. The project involves renovating Building 111 at the Clement Zablocki VA Medical Center in Milwaukee, Wisconsin, with work spanning the third through sixth floors. The design is for a fully sprinklered healthcare occupancy space, with detailed floor plans showing the reconfiguration of medical and administrative spaces.

The design documents are prepared by a joint venture between Alliance and Seven Generations A+E, with IMEG as the engineering consultant and ARC Environmental providing environmental engineering support. The project is being managed by the VA Office of Construction and Facilities Management, with a project number of 695-22-117. The drawings include comprehensive plans for construction phasing, code compliance, barrier-free design, hazardous materials management, and detailed floor plans for each level showing room layouts, fire safety zones, and infrastructure modifications.

View the file

Other files

File Type Posted
36C25225B0024 0009.docx DOCX document
36C25225B0024 0008.docx DOCX document
S06 - Response 12.31.25 Pre-Bid RFIs_695-22-117_1.14.26 RFI 154.xlsx XLSX spreadsheet
36C25225B0024 0007.docx DOCX document
S06 - Response 12.31.25 Pre-Bid RFIs_695-22-117_1.12.26 RFIs 152_153.xlsx XLSX spreadsheet
S06 - Wage Determination 0006.txt TXT text file
S06 - Amendment 0006 2of2 (1).pdf PDF
0006 Narrative.pdf PDF
S06 - Response 12.31.25 Pre-Bid RFIs_695-22-117_12.9.25 RFIs 1 -151.pdf PDF
S06 - 36C25225B0024 0006.pdf PDF
S06 - Amendment 0006 1of2.pdf PDF
36C25225B0024 0005.docx DOCX document
36C25225B0024 0004.docx DOCX document
S06 - 36C25225B0024 0003.pdf PDF
S06 - Pre-bid Site Visit 30 attended 20251120.pdf PDF
S06 Spec section 00 01 15 list of Drawings sheets pp 123 w notes.pdf PDF
S06 - 6a -695-22-117 VAMKE Audiology_100pc CD_Vol One Specifications Div 00-14.pdf PDF
S06 - 695_22_117 Drawing Sheet AI406 reissuse 13 Nov 2025.pdf PDF
36C25225B0024 0002.docx DOCX document
S06 - P000 - PLUMBING COVERSHEET.pdf PDF
Copy of S06 - Pre-Bid RFIs_695-22-117_11.18.25.xlsx XLSX spreadsheet
36C25225B0024 0001.docx DOCX document
ATTACHMENT 1_VAAR 852.219-75 JAN2023_REQUIRED TO COMPLETE.pdf PDF
S02 - Wage Determination WI 20250905.pdf PDF
S02 - MAP of East Entry for Site Visit 10.16.2025.pdf PDF
S02 -695-22-117 VAMKE Audiology - 100pc CD - Vol One Specifications Div 00-14.pdf PDF
S02 - 695-22-117 Sole Source Justification_Nurse Call_Executed.pdf PDF
S02 - 695-22-117 Drawings Vol 2 Mechanical Sheets 17.pdf PDF
S02 - 695-22-117 Fire Alarm System Single Source Justification_Executed.pdf PDF
36C25225B0024_1.docx DOCX document
S02 - 695-22-117_Drawings Vol 1_Architectural Plans Sheets16.pdf PDF
S02 - 695-22-117 Drawings Vol 1_Architectural_Sec_Details_WallTypes Sheets 8.pdf PDF
S02 - 695-22-117 Drawings Vol 2_ FireProtection Sheets 6.pdf PDF
S02- 695-22-117 Door Hardware Single Source Justification_Executed.pdf PDF
S02 - 695-22-117 VAMKE Audiology - 100pc CD - Vol Two Specifications Div 21-28.pdf PDF
S02 - 695-22-117 Bldg Automation n HVAC Cntrl System Single Source Justification_Executed.pdf PDF
S02 - 695-22-117 Vol 2 Drawings Electrical Low Voltage Sheets 14.pdf PDF
S02 - 695-22-117 Drawings_ Vol 2 Plumbing_Med Gas_Pneumatic Tube Sheets 11.pdf PDF
S02 - 695-22-117 Drawings Vol 1 Equip_Sound Booths_Interiors_Signage Sheets 12 02.pdf PDF
S02 - 695-22-117 Drawings Vol 1 Furniture_7 sheets.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10

695-22-117 VA MILWAUKEE RENOVATE 111 AUDIOLOGY 5BN

MILWAUKEE, WI 53295

PROJECT TEAM

OWNER:

OFFICE OF CONSTRUCTION

AND FACILITIES MANAGEMENT

5000 W NATIONAL AVE,

MILWAUKEE, WI 53295

COR: KATHERINE S. GEORGESON, FAIA NCARB, LEED AP

ARCHITECT

FACILITY MANAGEMENT DIVISION

414.384.2000

ARCHITECTURE/ENGINEERING:

ALLIANCE I SEVEN GENERATIONS A+E

PROJECT MANAGER: JENNIFER YARD

600 E. MICHIGAN AVENUE - SUITE B

KALAMAZOO, Ml 49007

PHONE: 269.927.0144

1635 PRINCE STREET

ALEXANDRIA VA22314

PHONE: 206.617.8485

ENGINEERING:

IMEG

SENIOR PRINCIPAL: KRIS COTHARN

1800 DEMING WAY SUITE 200

MIDDLETON, WI 53562

PHONE: 608.223.9600

FAX: 608.223.9601

ENVIRONMENTAL:

ARC ENVIRONMENTAL

ENVIRONMENTAL ENGINEER: STACY KAHATAPITIYA

1311 HAUBERT STREET

BALTIMORE, MD 21230

PHONE: 410.659.9971

GENERAL NOTE:

IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS,

THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUALITY OF WORK, AS

DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.

CONSULTANT

100% BID DOCUMENTS 05/09/2025

95% CONSTRUCTION DOCUMENTS RESUBMITTAL 04/12/'}JJ24

95% CONSTRUCTION DOCUMENTS 08/30/2023 <•IMEG

65% DESIGN DEVELOPMENT 06/16/'}JJ23 www.imegcorp.com

35% SCHEMATIC DESIGN 04/20/2023

Revisions: Date:

VA FORM 08 - 6231

1 2 3

DRAWING INDEX

VOLUME ONE

GENERAL

G00l COVER SHEET G002 GENERAL INFORMATlON &SYMBOL LEGEND AElOSP CONSTRUCTION AND SITE PLAN AESOC3 lHI RD FLOOR SOC PLAN

AESOC4 FOURTH FLOOR SOC PLAN

AESOC5 FIFTH FLOOR SOC PLAN

AESOC6 SIXTH FLOOR SOC PLAN

G200 FIFTH FLOOR PHASING PLAN

G205 FIFTH FLOOR CODE COMPLIANCE PLAN

G215 FIFTH FLOOR BARRIER-FREE COMPLIANCE PLAN

HA220 HAZARDOUS MATERIALS PLAN FOURTH FLOOR

HA221 HAZARDOUS MATERIALS PLAN FIFTH FLOOR

HA222 HAZARDOUS MATERIALS PLAN ROOF

ARCHITECTURAL

AIC002

AIC104

AIC105

AD105

AD106

AD124

AD125

AD2DO

AE105

AE105A

AE106

AE107

AE108

AE109

AE124

AE125

AE2DO

AE3DO

AE301

AE302

AE320

AE321

AE322

AE600

INFECTION CONTROL GENERAL INFORMATION

lHIRD AND FOURTH FLOOR INFECTION CONTROL PLAN

FIFTH FLOOR INFECTION CONTROL PLAN - DEMO

FIFTH FLOOR DEMOLITION PLAN

ROOF DEMOLITION PLAN

3RD &4TH FLOOR REFLECTED CEILING DEMOLITION PLAN

FIFTH FLOOR REFLECTED CEILING DEMOLITION PLAN

EXTERIOR DEMOLITION ELEVATIONS

FIFTH FLOOR PLAN

FIFTH FLOOR PLAN DIMENSIONS

ROOF PLAN

ROOF DETAILS

FIFTH FLOOR RAISED FLOOR DETAIL

FIFTH FLOOR RAISED FLOOR DETAIL CONTINUED

lHIRD AND FOURTH FLOOR REFLECTED CEILING PLAN

FIFTH FLOOR REFLECTED CEILING PLAN

EXTERIOR ELEVATIONS

BUILDING SECTIONS

BUILDING SECTIONS

BUILDING SECTIONS

CEILING DETAILS

WALL SECTIONS

ENLARGED PLAN DETAILS

WALL TYPES

DOOR AND FRAME SCHEDULE

ENLARGED EQUIPMENT PLANS

AE601

Al405 Al406 Al407 Al520 Al521 IDDOl

ID105

ID106

1D107 1D205 1D206

ID207

SOUND BOOTHS ENLARGED PLAN & INlERIOR ELEVATIONS

SOUND BOOTH PLAN

CASEWORK DETAILS

CASEWORK DETAILS

INTERIOR FINISH KEY AND DETAILS

FIFTH FLOOR FINISH PLAN

INTERIOR ELEVATIONS

INTERIOR ELEVATIONS

FIFTH FLOOR INTERIOR SIGNAGE PLAN

SIGN TYPE

SIGN TYPE

SYSTEM FURNITURE

AF105 OVERALL FURNITURE PLAN

AF205 FURNITURE PLUMBING CL

AF300 FURNITURE DETAILS

AF301 FURNITURE DETAILS

AF302 FURNITURE DETAILS

AF303 FURNITURE DETAILS

AF4DO FURNITURE CONSTRUCTION DETAILS

VOLUME TWO

FIRE PROTECTION

FAOOl FIRE ALARM GENERAL FAlOl FIFTH FLOOR FIRE ALARM DEMO PLAN FA20l FIFTH FLOOR FIRE ALARM PLAN FXDOl FIRE SPRINKLER GENERAL

FX101 FIFTH FLOOR FIRE SPRINKLER DEMO PLAN

FX201 FIFTH FLOOR FIRE SPRINKLER PLAN

PLUMBING

P000 PLUMBING COVERSHEET

PD104 FOURTH FLOOR PLAN- PLUMBING- DEMOLITION

PD105

P204 P205 P206 P300

FIFTH FLOOR PLAN - PLUMBING- DEMOLITION

FOURTH FLOOR PLAN - PLUMBING

FIFTH FLOOR PLAN - PLUMBING

ROOF PLAN - PLUMBING

PLUMBING DIAGRAMS

E ll1.11�l9t1 51

DOWNER

WOODS

E ltB>Wood !I l,d ENDERIS PARK. SHERM.AN PARK WLOC111nST

'ilJ r FHVERWEST

UPPER.

EAST SIDE

r,fORTH DIVISION � E(:{)111l"IS1

'!:.- MURRA'I" ],11LL

'i!

WNcr1l1A� WNortl'lA� WN<>NnAw; _

;t Allis

\ND

T u, .J BREWEWS 1-!lLL., @ • <f , 'l'l 1$'

Mllwauk�l!'t / ��I\� R1veiw-alk 0Jstnct T LOWE-R �-..;

EAST SlDE �..,, h&dre1 zn M,lw K e gh

"'f"' Schoo b1 ih Arl!i Q e Park

! n v� -ran<:

M1lwau�eQ • y Publf Museum T \ ww=,,.,,� Milwaukee

Lt-'fTON PARK

WHITE MANOR

WOI-Ja'!lllll.lA�

$- L VONS PARK

ALVERNO

HONEY CREEi<

MAI\IOR

SOUTHGATE wO'l!ahwieAve

"�� W Miirl)an ;,,,•e

� SOLJTI-IPOINT MORGANDALE

H mi1111dt

TIPPECANOE

FERNWOOO

St Francis

NORTH

VICINITY MAP

MILWAUKEE, WISCONSIN

VOLUME ONE

100% BID DOCUMENTS

MEDICAL GAS

MGOO0 MEDICAL GJ\S COVERSHEET

MGDl0S FIFTH FLOOR PLAN - MEDICAL GJ\S- DEMOLITION

PNEUMATIC TUBE EQUIPMENT PLANS

PTlOO PNEUMATIC TUBE FIFTH FLOOR PLAN PT101 PNEUMAllC TUBE MECHANICAL RISER DIAGRAM PT102 PNEUMAllC TUBE COMMUNICATION RISER DIAGRAM

MECHANICAL

MOOD HVAC COVERSHEET

MD104

MD105

MD115

MD116

Ml04 M105 M106 M115 M116 M200 M201 M300 M301 M400 M401 M500

ELECTRICAL

EDOO

ED105

EDl 15 E105 El 15

FOURlH FLOOR PLAN - PIPING - DEMO

FIFTH FLOOR PLAN - PIPING - DEMOLITION

FIFTH FLOOR PLAN - VENTILATION - DEMOLITION

FIFTH FLOOR ROOF PLAN - VENTILATION - DEMOLITION

FOURlH FLOOR PLAN - PIPING

FIFTH FLOOR PLAN - PIPING

FIFTH FLOOR ROOF PLAN - PIPING

FIFTH FLOOR PLAN - VENTILATION

FIFTH FLOOR ROOF PLAN - VENTILATION

ENLARGED SECTIONS - MECHANICAL

ENLARGED SECTIONS - MECHANICAL

HVAC DETAILS

HVAC DETAILS

HVAC DIAGRAMS

HVAC DIAGRAMS

HVAC SCHEDULES

ELECTRICAL COVERSHEET

FIFTH FLOOR PLAN - LIGHTING - DEMOLITION

FIFTH FLOOR PLAN - POWER - DEMOLITION

FIFTH FLOOR PLAN - LIGHTING

FIFTH FLOOR PLAN - POWER

El 16 SIXTH FLOOR PLAN - POWER

E6DO ELECTRICAL SCHEDULES

LOW VOLTAGE

TY105

TY401

TY501

TY502

TY503

TY601

TY602

BLUEM0UND

HEIGHTS

L

W□mn'SI l'> V, ..., ui

' ? E � .. 5- i:. a l!/ w � �

JOHNSON'S

WOODS

W Mter!il

FIFTH FLOOR PLAN - LOW VOLTAGE

TELECOM ROOM PLAN VIEW AND ELEVATIONS

LOW VOLTAGE STANDARD DETAILS

SECURITY DETAILS

TELECOM DETAILS

TYPICAL DATA TERMINATION DETAIL

PA SYSTEM ONE LINE DIAGRAM

MI hell Boulevard

Park family Field

[ i

Quad Par� MERRI Ll PARi<

W Clyl lo'/SIP•W• THE VALLEY ,�u WS1, P.]GSVILLE l w�,IIP rlto7

• w >

PROJECT LOCATION ·;'-t,f 1!'.

�I.I. �

"' lvay � W Cane\ r;

N°ATIO

• w ' t � Dnt>I fler Public St hi ol9 �

SILVER CITY

W'$wtt

- ...____ CLEMENT ZABLOCKI VA MEDICAL CENTER CAMPUS Notre D.:tme Sd Mll\','-ilUkec Prim urntiaro St

NORTH

W G111e11fleld Ave

WLillrilt.:1111 �

V'J 'S1

West Milwaukee

M1lwauke,.

Park

WBum'1am St y ,, W Mitatmll SI

W Burnham st

VA CAMPUS MAP

MILWAUKEE, WISCONSIN

i w Llr�rum �

BURNHAM PARK

Cdrmen l-hgh Si;hoti of -r, I

ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Tille

COVER SHEET

Phase

100% BID DOCUMENTS

Project Tille

VA MILWAUKEE RENOVATE 111

AUDIOLOGY 5BN

Project Number

695-22-117

Joint Venture

600 E. Michigan Avenue, Suite B Kalamazoo, Ml 49007 P:269.927.0144 www.7GenAE.com

1635 Prince Street Alexandria, VA22314 P: 202.617.8485 www.alliance.us.com

Se tember 10, 2024

VA

U.S, Department of Veterans Affairs

Approved:

Sprinkler:

FULLY SPRINKLERED

Location

5000 W NATIONAL AVE, MILWAUKEE, WI 53295

Issue Date

MAV09, 2025

Checked

JY/MH

Drawn

AB/AH

Building Number

1 1 1

Drawing Number

GOOl

7GAE PROJECT NO.: 222144

A

B

C

D

E

F

ACCOMPANYING 36C25225B0024 AMENDMENT 0002

File details come from the government source that posted it. Updated .