Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseStampConsultants
321 4 5 6 7 8 9 10
INDIANTOWN GAP NATIONAL
CEMETERY
LEBANON COUNTY, PA
VA 813-028
02.18.2022 JCH WCS
PHASE 5 DEVELOPMENT
RFP DOCUMENTS
# Revisions Date
Sprinkler Status
INTEGRITY FEDERAL SERVICES
MARTINSBURG, WV
(304) 725-8456
HONOR ENGINEER COMPANY
HARRISBURG, PA
(717) 533-9077
MABBETT & ASSOCIATES, INC.
STONEHAM, MA
(781) 275-6050
PENNONI ASSOCIATES INC.
MECHANICSBURG, PA
(717) 620-5925
COMMANDER'S CONCEPTS COMMISSIONING
FOREST, VA
(713) 492-1922
AQUA ENGINEERING, INC
FORT COLLINS, CO
(970) 372-6104
BARBER & HOFFMAN, INC.
CRANBERRY TOWNSHIP, PA
(724) 741-0848
Architect/Engineer of Record
AE Works, LTD.
418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com
THE LA GROUP
SARATOGA SPRINGS, NY
(518) 587-8100
AL
TE
RN
AT
E
® CJ501
SWM DETAILS
IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-310 SYSTEM
1. STORMTECH SC-310 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE-CONSTRUCTION MEETING WITH THE INSTALLERS.
2. STORMTECH SC-310 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS.
STORMTECH RECOMMENDS 3 BACKFILL METHODS:
· STONESHOOTER LOCATED OFF THE CHAMBER BED.
· BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.
· BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR.
4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS.
5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE.
6. MAINTAIN MINIMUM - SPACING BETWEEN THE CHAMBER ROWS.
7. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm).
8. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER.
9. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE
RUNOFF.
NOTES FOR CONSTRUCTION EQUIPMENT
1. STORMTECH SC-310 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC-310 & SC-740 CHAMBERS IS LIMITED:
· NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.
· NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION
GUIDE".
· WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING.
USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE
"DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY.
CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT.
SC-310 STORMTECH CHAMBER SPECIFICATIONS
1. CHAMBERS SHALL BE STORMTECH SC-310 OR EQUIVALENT.
2. CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE OR POLYETHYLENE COPOLYMERS.
3. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2922 (POLETHYLENE) OR ASTM F2418-16a (POLYPROPYLENE), "STANDARD SPECIFICATION FOR CORRUGATED WALL STORMWATER COLLECTION
CHAMBERS".
4. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION.
5. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT
AND MULTIPLE VEHICLE PRESENCES.
6. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK.
7. REQUIREMENTS FOR HANDLING AND INSTALLATION:
· TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
· TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”.
· TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 400 LBS/IN/IN. THE ASC IS DEFINED IN SECTION
6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE
GOLD OR YELLOW COLORS.
8. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS:
· THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER.
· THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM
F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE.
· THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2922 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN.
9. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.
6" (150 mm)
NOTES
· MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECHNICAL NOTE 6.32 FOR MANIFOLD SIZING GUIDANCE.
· DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD
COMPONENTS IN THE FIELD.
· THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET.
· THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE
SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED.
· THE SITE DESIGN ENGINEER MUST REVIEW THE PROXIMITY OF THE CHAMBERS TO THE SLOPE AND CONSIDER EFFECTS OF POSSIBLE SATURATED SOILS ON THE SLOPE'S INTEGRITY.
INSPECTION PORT (TYP 2 PLACES)
ISOLATOR ROW PLUS
(SEE DETAIL / TYP 2 PLACES)
OUTLET STRUCTURE (OS-8) PER PLAN
MAXIMUM OUTLET FLOW 11.0 CFS
PLACE MINIMUM 12.5' OF ADSPLUS125 WOVEN GEOTEXTILE
OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET
FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS
12" PREFABRICATED END CAP, PART# SC310EPE12B
TYP OF ALL SC-310 12" BOTTOM CONNECTIONS
PROPOSED LAYOUT
120 STORMTECH SC-310 CHAMBERS
24 STORMTECH SC-310 END CAPS
14 STONE ABOVE (in) 6 STONE BELOW (in)
40 % STONE VOID
5,257 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED)
3,495 SYSTEM AREA (ft²) 251 SYSTEM PERIMETER (ft)
PROPOSED ELEVATIONS
511.33 MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED)
505.33 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC)
504.83 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC)
504.83 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT)
504.83 MINIMUM ALLOWABLE GRADE (TOP OF RIGID PAVEMENT)
504.50 TOP OF STONE
503.33 TOP OF SC-310 CHAMBER
502.08 30" X 12" CROWN MATCHING MANIFOLD INVERT (12" PIPE)
502.08 18" X 12" CROWN MATCHING MANIFOLD INVERT (12" PIPE)
502.08 12" ISOLATOR ROW PLUS CONNECTION INVERT
502.00 BOTTOM OF SC-310 CHAMBER
501.58 18" X 12" CROWN MATCHING MANIFOLD INVERT (18" PIPE)
501.50 BOTTOM OF STONE
500.59 30" X 12" CROWN MATCHING MANIFOLD INVERT (30" PIPE)
12" PREFABRICATED END CAP, PART# SC310EPE12BR
TYP OF ALL SC-310 12" ISOLATOR ROW PLUS CONNECTIONS
30" X 12" ADS N-12 CROWN MATCHING REDUCING MANIFOLD
12" INVERT 0.9" ABOVE CHAMBER BASE
30" INVERT 16.95" BELOW CHAMBER BASE
18" X 12" ADS N-12 CROWN MATCHING REDUCING MANIFOLD
12" INVERT 0.9" ABOVE CHAMBER BASE
18" INVERT 5.0" BELOW CHAMBER BASE
MAXIMUM INLET FLOW 13.0 CFS
STRUCTURE PER
PLAN W/WEIR
STRUCTURE PER
PLAN W/WEIR
84.21'
72.37'
.5
0'
.5
0'
SUMP DEPTH TBD BY
SITE DESIGN ENGINEER
(24" [600 mm] MIN RECOMMENDED)
CATCH BASIN
OR MANHOLE
SC-310 ISOLATOR ROW PLUS DETAIL
NTS
OPTIONAL INSPECTION PORT
SC-310 END CAP
COVER ENTIRE ISOLATOR ROW PLUS WITH ADS
GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE
5' (1.5 m) MIN WIDE
SC-310 CHAMBERSTORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND CHAMBERS
4' (1.2 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
12" (300 mm) HDPE ACCESS PIPE REQUIRED
USE FACTORY PRE-FABRICATED END CAP
WITH FLAMP PART #: SC310EPE12BR
WEIR
WEIR HEIGHT TBD BY
SITE DESIGN ENGINEER
ACCEPTABLE FILL MATERIALS: STORMTECH SC-310 CHAMBER SYSTEMS
PLEASE NOTE:
1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".
2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
COMPACTION REQUIREMENTS.
4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
NOTES:
1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2922 (POLETHYLENE) OR ASTM F2418-16a (POLYPROPYLENE), "STANDARD SPECIFICATION FOR CORRUGATED WALL STORMWATER COLLECTION
CHAMBERS".
2. SC-310 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION
CHAMBERS".
3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH
CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.
4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
5. REQUIREMENTS FOR HANDLING AND INSTALLATION:
· TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
· TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”.
· TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2922 SHALL BE GREATER THAN OR EQUAL TO 400
LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR
YELLOW COLORS.
MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL
CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
D
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF
THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR
UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE
MAY BE PART OF THE 'D' LAYER.
ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.
CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. N/A
PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED
INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
PREPARATION REQUIREMENTS.
C
INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP
OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE
TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A
PART OF THE 'C' LAYER.
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR
PROCESSED AGGREGATE.
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS
LAYER.
AASHTO M145¹
A-1, A-2-4, A-3
OR
AASHTO M43¹
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER
THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN
6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR
WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR
PROCESSED AGGREGATE MATERIALS. ROLLER GROSS
VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC
FORCE NOT TO EXCEED 20,000 lbs (89 kN).
B
EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE
FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹
3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED.
A
FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE
UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹
3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
D C
B
A
18" (450 mm) MIN*
8' (2.4 m)
MAX
6" (150 mm)
MIN
12" (300 mm) MIN 12" (300 mm) MIN34" (864 mm)6" (150 mm) MIN
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND
CLEAN CRUSHED, ANGULAR STONE IN A & B LAYERS
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED
INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY
OCCUR, INCREASE COVER TO 24" (600 mm).
PERIMETER STONE
(SEE NOTE 4)
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
SC-310
END CAP SUBGRADE SOILS
(SEE NOTE 3)
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
DEPTH OF STONE TO BE DETERMINED
BY SITE DESIGN ENGINEER 6" (150 mm) MIN
16" (406 mm)
INSPECTION & MAINTENANCE
STEP 1) INSPECT ISOLATOR ROW PLUS FOR SEDIMENT
A. INSPECTION PORTS (IF PRESENT)
A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN
A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED
A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
B. ALL ISOLATOR PLUS ROWS
B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS
B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE
i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY
ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE
B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
STEP 2) CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS
A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED
B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN
C. VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.
STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.
NOTES
1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS
OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.
2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.
NOTE:
INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST.
STORMTECH CHAMBER
CONCRETE COLLAR
PAVEMENT
12" (300 mm) MIN WIDTH
CONCRETE SLAB
6" (150 mm) MIN THICKNESS
4" PVC INSPECTION PORT DETAIL
(SC SERIES CHAMBER)
NTS
8" NYLOPLAST INSPECTION PORT
BODY (PART# 2708AG4IPKIT) OR
TRAFFIC RATED BOX W/SOLID
LOCKING COVER
CONCRETE COLLAR NOT REQUIRED
FOR UNPAVED APPLICATIONS
4" (100 mm)
SDR 35 PIPE
4" (100 mm) INSERTA TEE
TO BE CENTERED ON
CORRUGATION CREST
NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH) 34.0" X 16.0" X 85.4" (864 mm X 406 mm X 2169 mm) CHAMBER STORAGE 14.7 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE* 31.0 CUBIC FEET (0.88 m³) WEIGHT 35.0 lbs. (16.8 kg)
*ASSUMES 6" (152 mm) ABOVE, BELOW, AND BETWEEN CHAMBERS
BUILD ROW IN THIS DIRECTION
SC-310 TECHNICAL SPECIFICATION
NTS
OVERLAP NEXT CHAMBER HERE
(OVER SMALL CORRUGATION)
START END
34.0" (864 mm)
16.0" (406 mm)
90.7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH
A A
B C
9.9" (251 mm)
15.6" (396 mm)
PART # STUB A B C
SC310EPE06T / SC310EPE06TPC 6" (150 mm) 9.6" (244 mm)
5.8" (147 mm) --- SC310EPE06B / SC310EPE06BPC --- 0.5" (13 mm) SC310EPE08T / SC310EPE08TPC 8" (200 mm) 11.9" (302 mm)
3.5" (89 mm) --- SC310EPE08B / SC310EPE08BPC --- 0.6" (15 mm) SC310EPE10T / SC310EPE10TPC 10" (250 mm) 12.7" (323 mm)
1.4" (36 mm) --- SC310EPE10B / SC310EPE10BPC --- 0.7" (18 mm)
SC310EPE12B 12" (300 mm) 13.5" (343 mm) --- 0.9" (23 mm) SC310EPE12BR 12" (300 mm) 13.5" (343 mm) --- 0.9" (23 mm)
ALL STUBS, EXCEPT FOR THE SC310EPE12B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694.
* FOR THE SC310EPE12B THE 12" (300 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 0.25" (6 mm).
BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL.
NOTE: ALL DIMENSIONS ARE NOMINAL
PRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR"
PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"
PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"
PRE CORED END CAPS END WITH "PC"
OS-8 WEIR PLATE DETAIL
NOT TO SCALE5
1.25' (15")
1.9 2'
(2 3"
5'
TOP ELEVATION = 504.25
ELEVATION = 502.33
BOTTOM ELEVATION = 501.50
NOTE: THE FOLLOWING DETAILS ARE FOR ADD ALTERNATE 4: HONOR GUARD REPLACEMENT
DWG 97 of 302
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Pennsylvania Field Office
110 Radnor Road, Suite 101 State College, Pennsylvania 16801-4850
November 16, 2021
Fernando Fernández U.S. Department of Veterans Affairs Construction and Facilities Management Office Washington D.C.
Andrew Glucksman Mabbett & Associates 40 Old Louisquisset Pike North Smithfield, RI 02896
RE: USFWS Project #2021-0077 PNDI Review # 737860
Dear Messrs. Fernández and Gluckman:
Thank you for your emails of August 12, and October 26, 2021, which provided the U.S. Fish and Wildlife Service (Service) with additional information about the Indiantown Gap National Cemetery Phase 5 Expansion Project, located in Annville, Lebanon County, Pennsylvania. The following comments are provided pursuant to the Endangered Species Act of 1973 (87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) to ensure the protection of federally threatened and endangered species. We previously commented on this project by letter dated February 25, 2021.
The Department of Veterans Affairs (DVA) proposes to construct and operate the 5th Phase expansion of the Indiantown Gap National Cemetery. Based on the materials provided, the proposed expansion is on a 120-acre parcel, but the actual development will likely be much smaller (about 45 acres) and is located east of the existing developed portion of the cemetery.
The proposed project is located within the range of the federally listed, endangered, Indiana bat (Myotis sodalis); and the federally listed, threatened northern long-eared bat (Myotis septentrionalis) and bog turtle (Glyptemys muhlenbergii).
Indiana bat and Northern Long-eared bat
In our February 25, 2021, letter, we determined that with DVA’s commitment to a seasonal restriction on tree cutting to avoid the direct take of Indiana bats, the effects of the project on the
Indiana bat were insignificant or discountable. We also determined that the project was not located within 0.25 mile of a known northern long eared bat hibernaculum or within 150 feet from a known, occupied maternity roost tree; therefore, we concluded that any incidental take that may occur was in accordance with the Final 4(d) Rule and not in violation of the Endangered Species Act. These determinations included in our February 2021 letter remain unchanged.
Bog turtle
To determine the potential effects of the proposed project on bog turtles and their habitat, Bridger Thompson, a Qualified Bog Turtle Surveyor (QBTS), conducted Phase 1 bog turtle habitat assessments on October 7 and 8, 2020. According to the report, 18 wetlands extend to within 300 feet of the proposed limit of disturbance. Following the methods described under “Bog Turtle Habitat Survey” (Phase 1 survey) of the Guidelines for Bog Turtle Surveys (revised 2020), Mr. Thompson determined that the wetland referred to as Wetland INC-W-002 had the combination of soils, vegetation, and hydrology typical of habitat occupied by bog turtles.
In our February 2021 letter, we recommended that DVA retain a QBTS to conduct a Phase 2 survey for the wetlands that were found within 300 feet of the proposed project or avoid wetlands in the project area. Accordingly, to conduct a more detailed and thorough evaluation of these wetlands, Mr. Thompson also completed Phase 2 bog turtle surveys on Wetland INC-W- 002 on April 28; May 4, 12, and 19, 2021. According to the survey report, although the site contained suitable bog turtle habitat, and several amphibian and reptile species were observed (green frog, northern dusky salamander, eastern box turtle, grey tree frog), no bog turtles were found in this wetland. Based on our review of this information, including the project description, project location, and anticipated activities; and the failure to locate bog turtles in the subject wetland, we concluded that construction and implementation of the proposed eastern end of the project is not likely to adversely affect the bog turtle.
Additional Project Area Phase 1 Bog Turtle Survey
Since the Phase 2 survey conducted in April/May 2021, the DVA selected a project design that includes additional project tasks (referred to as Additional Project Area). Work includes repaving existing roadways within the existing developed western portion of the Cemetery;
widening existing paved walkways within the mowed and maintained cemetery grounds;
installing informational signage along existing roadways; and maintaining existing monuments and bridge structures (non-structural and cosmetic repairs). The DVA is not proposing direct impacts to wetlands or watercourses in the Additional Project Area.
To determine the potential effects of the modified proposed project on bog turtles and their habitat, QBTS Bridger Thompson conducted more Phase 1 bog turtle habitat assessments in the Additional Project Area on June 10, 2021. According to the report, 19 additional wetlands extend to within 300 feet of the proposed limit of disturbance. Following the methods described under “Bog Turtle Habitat Survey” (Phase 1 survey) of the Guidelines for Bog Turtle Surveys (revised 2020), Mr. Thompson determined that the wetlands referred to as Wetland INC-W-025, INC-W-026, INC-W-028, INC-W-029 had the combination of soils, vegetation, and hydrology typical of habitat occupied by bog turtles. We concur with these habitat determinations.
Because potential bog turtle habitat was found in the Additional Project Area past the timeline requirements for a 2021 Phase 2 bog turtle survey, the DVA has elected to assume the presence of bog turtles in these additional wetland areas and employ avoidance measures to ensure no adverse effects to bog turtles, in lieu of conducting Phase 2 bog turtle surveys. To avoid adverse effects to bog turtles, the DVA has committed to implementing avoidance and minimization measures for work in the Additional Project Area. Since the project duration for the Additional Project Area is relatively short (maximum of 1 month) the DVA will use 18-inch compost filter socks (CFS) adjacent to the Wetlands INC-W-025, INC-W-026, INC-W-028, INC-W-029, per email of October 26, 2021 (to cause less disturbance within the cemetery) in lieu of traditional exclusionary fencing. The short duration of the project ensures that the CFS would remain as an effective bog turtle barrier, and not be subject to compression, crushing and flattening, thus rendering it ineffective at excluding turtles from the project area. The DVA is committed to including these avoidance measures in an approved Sedimentation and Erosion Control Plan. If all construction is completed between November 1 and March 31 and no excavation in wetlands is proposed, the following measures are not necessary.
1) If any exclusionary fencing is entirely erected between November 1 and March 31, it will not be necessary to perform a pre-construction survey.
2) During the period between April 1 and October 31, one pre-construction bog turtle clearance search of the proposed project area of effect will be completed prior to any earth disturbance activity, fencing installation, or other construction. The search area will extend to include an area 10 feet beyond the planned Limit of Disturbance and any temporary staging areas. The pre-construction bog turtle clearance search must be performed by a qualified bog turtle surveyor, who will be obtained from the most current list of “U.S. Fish and Wildlife Service and Pennsylvania Fish and Boat Commission Recognized Qualified Bog Turtle Surveyors.” The bog turtle clearance search must be completed immediately prior to the installation of the habitat protection fence described below.
3) Except as otherwise noted within these avoidance measures, the pre-construction bog turtle clearance search shall be conducted according to the most current survey protocol provided by the U.S. Fish and Wildlife Service and the Pennsylvania Fish and Boat Commission. All Phase 2 survey procedures are applicable except that one pre-construction clearance search per wetland rather than the minimum of four searches per wetland shall be acceptable, and the time of year for performing the search has been extended.
4) If the pre-construction bog turtle clearance search occurs after June 15, herbaceous vegetation within the survey area shall be cut to a height of 4 to 6 inches prior to the survey in order to promote search effectiveness. Vegetation shall be cut using a hand-held trimmer/weed cutter and then carefully raked away from the area to be searched. The qualified surveyor shall conduct the vegetation clearing.
5) Immediately following the pre-construction bog turtle clearance search, a 30-inch-high silt barrier fence shall be erected at the edge of the Limit of Disturbance as habitat protection fencing in accordance with the approved Erosion and Sediment Pollution Control Plan. The habitat protection fence shall be constructed in upland habitat between identified suitable bog turtle habitat and the limit of disturbance to deter bog turtles from circumventing the barrier. No other construction activities may begin until installation of this habitat protection fencing is completed. The habitat protection fence will act as a barrier to prevent possible bog turtles from migrating out of wetlands and waterways into the construction area and to prevent construction activity and sediment from entering the wetland and waterway. The habitat protection fencing will be installed as indicated as soon as practicable following the turtle search and clearance by the qualified bog turtle surveyor. The fencing will be installed only after receiving approval to do so from the qualified bog turtle surveyor following completion of their site search for bog turtles.
6) Installation of all habitat protection fencing and silt barrier fence for erosion and sediment control shall be the responsibility of the contractor and shall be installed and removed by hand. The qualified bog turtle surveyor shall be present during the erection of the habitat protection fence to ensure that it is properly installed at the correct location and depth. Immediately following the fence installation, it shall be inspected by the qualified bog turtle surveyor to ensure that no trench, which could act as a pit-fall trap to turtles, occurs on either side of the fencing. After installation, the habitat protection fence will be inspected and logged daily by the contractor to ensure that no holes are present that turtles can crawl through. If at any time there are holes in the habitat protection fence, OR any turtle (alive, injured, or dead) is observed within the Limit of Disturbance, construction will stop immediately, and Permit Condition 11 below will be followed.
7) All work associated with the project shall be conducted in accordance with the Erosion and Sediment Pollution Control Plan approved by the County Conservation District.
8) All equipment and machinery shall avoid wetland/watercourse habitat upstream and downstream of the proposed construction area. Orange construction fence will be installed to delineate these avoidance areas and will act as a visual warning to prevent construction equipment and personnel from entering and disturbing the potential bog turtle habitat outside the Limit of Disturbance. The Township or its designated representative(s) shall identify and clearly delineate all wetlands for the contractor(s) and will either attach the orange construction fence onto the habitat protection fence or install it immediately in front of the habitat protection fence within the Limit of Disturbance.
9) No material shall be excavated, deposited, or positioned so as to lower the water table or impede the flow of water to any wetland areas; that is, implementation of the project shall not directly or indirectly affect the water quality and quantity of any wetland areas.
10) The qualified bog turtle surveyor shall forward the results of the pre-construction bog turtle survey in writing to the U.S. Fish and Wildlife Service and the Pennsylvania Fish and Boat Commission via mail, facsimile, or e-mail within 48 hours of installation of the habitat protection fence.
11) During construction, if any turtle is observed at a location within 100 feet from the Limit of Disturbance, then construction may continue so long as there are no holes in the habitat protection fence. However, if any turtle (alive, injured, or dead) is observed at any time within the Limit of Disturbance, OR if a hole is observed in the habitat protection fence, then construction will cease immediately, and the following steps will be taken:
a. The contractor will immediately inform the pre-designated site manager who will immediately contact the qualified bog turtle surveyor. The site manager will then immediately implement the following measures:
b. If the turtle appears dead or immobile, the turtle will be left where it was initially observed. If the turtle appears to be mobile, efforts will be made to temporarily contain the turtle until the qualified bog turtle surveyor can take possession of it.
Temporary containment will consist of placing the turtle in a thoroughly clean bucket that has a depth of more than 18 inches. Less than 1 inch of water should be placed in the bucket with the turtle to keep the animal cool and hydrated. The bucket should be placed in a quiet, well-shaded area, preferably within the wetland. The turtle should be handled as little as possible, and temporary containment must not exceed 6 hours.
c. The qualified bog turtle surveyor will identify the species of turtle found and document the location and condition of the turtle. The qualified bog turtle surveyor will also inspect the habitat protection fence and direct any repairs of the fence as needed. If there are holes in the habitat protection fence and/or the turtle is found to be a bog turtle, construction will not resume until the agency consultation procedures described herein are fully implemented, and the habitat protection fence is repaired to re-establish an effective turtle exclusion barrier.
d. If the qualified bog turtle surveyor identifies the turtle species as a bog turtle
(Glyptemys muhlenbergii), then this biologist will immediately notify endangered species biologists at both the U.S. Fish and Wildlife Service and the Pennsylvania Fish and Boat Commission. The elapsed time for contacting both of these jurisdictional agencies from the time of bog turtle discovery should be as soon as possible, but must not exceed 24 hours. Following arrival of the qualified bog turtle surveyor at the project site, the turtle may be handled only by this biologist according to the recommendations of the U.S. Fish and Wildlife Service and/or the Pennsylvania Fish and Boat Commission. The biologist will consult with these agencies concerning safe handling and possible relocation of the turtle.
Construction will resume only at the completion of this consultation.
e. If the qualified bog turtle surveyor identifies the turtle as a species other than the bog turtle, and the turtle appears healthy, then the qualified surveyor will mark the turtle for future identification and release it unharmed no more than 300 feet from the site of discovery to a safe location outside of the Limit of Disturbance. The site manager will be shown how and where to release the turtle if it is again found outside of the Limit of Disturbance. Construction may continue once the turtle is relocated. The site manager must log all turtle relocations.
f. If any turtle found appears injured or dead, consult with the U.S. Fish and
Wildlife Service and/or the Pennsylvania Fish and Boat Commission concerning safe handling of an injured turtle, and the taking of possession of the specimen, whether injured or dead, by one of the jurisdictional agencies. Only the qualified bog turtle surveyor will handle the turtle. Construction will resume only at the completion of consultation.
12) The contractor will remove the habitat protection fencing and all silt barrier fencing by hand immediately upon completion of all construction activities, including stabilization of earth disturbance areas.
13) The project proponent, or designated representative(s), will submit a brief final report including bog turtle survey results and a summary of the field construction completed, including color photographs, to the U.S. Fish and Wildlife Service and the Pennsylvania Fish and Boat Commission. The final report will be submitted 30 days after construction is completed and the habitat protection fencing is removed.
With the implementation of DVA’s commitment to conduct the work under the supervision and guidance of a QBTS (in combination with the CFS as an exclusionary measure), this project is not likely to adversely affect the bog turtle. If DVA is unable to construct the project under the supervision of a QBTS (with appropriate exclusionary measures like CFS), or project plans change, please contact this office for further coordination.
This response relates only to endangered and threatened species under our jurisdiction based on an office review of the proposed project's location. No field inspection of the project area has been conducted by this office. This determination is valid for 2 years from the date of this letter.
If the proposed project has not been fully implemented prior to this, an additional review by this office will be necessary
To avoid potential delays in reviewing your project, please use the above-referenced USFWS project tracking number in any future correspondence regarding this project.
Please contact Jennifer Kagel of this office at Jennifer_Kagel@fws.gov if you have any questions or require further assistance regarding this matter.
Sincerely, Sonja Jahrsdoerfer Project Leader mailto:Jennifer_Kagel@fws.gov
Fernando.Fernandez@va.gov gluckman@mabbett.com mailto:Fernando.Fernandez@va.gov mailto:gluckman@mabbett.com
November 16, 2021
Construction and Facilities Management Office Washington D.C.
Andrew Glucksman Mabbett & Associates 40 Old Louisquisset Pike North Smithfield, RI 02896
RE: USFWS Project #2021-0077 PNDI Review # 737860
Dear Messrs. Fernández and Gluckman:
Thank you for your emails of August 12, and October 26, 2021, which provided the U.S. Fish and Wildlife Service (Service) with additional information about the Indiantown Gap National Cemetery Phase 5 Expansion Project, located in Annville, Lebanon County, Pennsylvania. The following comments are provided pursuant to the Endangered Species Act of 1973 (87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) to ensure the protection of federally threatened and endangered species. We previously commented on this project by letter dated February 25, 2021.
The Department of Veterans Affairs (DVA) proposes to construct and operate the 5th Phase expansion of the Indiantown Gap National Cemetery. Based on the materials provided, the proposed expansion is on a 120-acre parcel, but the actual development will likely be much smaller (about 45 acres) and is located east of the existing developed portion of the cemetery.
The proposed project is located within the range of the federally listed, endangered, Indiana bat (Myotis sodalis); and the federally listed, threatened northern long-eared bat (Myotis septentrionalis) and bog turtle (Glyptemys muhlenbergii).
Indiana bat and Northern Long-eared bat
In our February 25, 2021, letter, we determined that with DVA’s commitment to a seasonal restriction on tree cutting to avoid the direct take of Indiana bats, the effects of the project on the
Indiana bat were insignificant or discountable. We also determined that the project was not located within 0.25 mile of a known northern long eared bat hibernaculum or within 150 feet from a known, occupied maternity roost tree; therefore, we concluded that any incidental take that may occur was in accordance with the Final 4(d) Rule and not in violation of the Endangered Species Act. These determinations included in our February 2021 letter remain unchanged.
Bog turtle
To determine the potential effects of the proposed project on bog turtles and their habitat, Bridger Thompson, a Qualified Bog Turtle Surveyor (QBTS), conducted Phase 1 bog turtle habitat assessments on October 7 and 8, 2020. According to the report, 18 wetlands extend to within 300 feet of the proposed limit of disturbance. Following the methods described under “Bog Turtle Habitat Survey” (Phase 1 survey) of the Guidelines for Bog Turtle Surveys (revised 2020), Mr. Thompson determined that the wetland referred to as Wetland INC-W-002 had the combination of soils, vegetation, and hydrology typical of habitat occupied by bog turtles.
In our February 2021 letter, we recommended that DVA retain a QBTS to conduct a Phase 2 survey for the wetlands that were found within 300 feet of the proposed project or avoid wetlands in the project area. Accordingly, to conduct a more detailed and thorough evaluation of these wetlands, Mr. Thompson also completed Phase 2 bog turtle surveys on Wetland INC-W- 002 on April 28; May 4, 12, and 19, 2021. According to the survey report, although the site contained suitable bog turtle habitat, and several amphibian and reptile species were observed (green frog, northern dusky salamander, eastern box turtle, grey tree frog), no bog turtles were found in this wetland. Based on our review of this information, including the project description, project location, and anticipated activities; and the failure to locate bog turtles in the subject wetland, we concluded that construction and implementation of the proposed eastern end of the project is not likely to adversely affect the bog turtle.
Additional Project Area Phase 1 Bog Turtle Survey
Since the Phase 2 survey conducted in April/May 2021, the DVA selected a project design that includes additional project tasks (referred to as Additional Project Area). Work includes repaving existing roadways within the existing developed western portion of the Cemetery;
widening existing paved walkways within the mowed and maintained cemetery grounds;
installing informational signage along existing roadways; and maintaining existing monuments and bridge structures (non-structural and cosmetic repairs). The DVA is not proposing direct impacts to wetlands or watercourses in the Additional Project Area.
To determine the potential effects of the modified proposed project on bog turtles and their habitat, QBTS Bridger Thompson conducted more Phase 1 bog turtle habitat assessments in the Additional Project Area on June 10, 2021. According to the report, 19 additional wetlands extend to within 300 feet of the proposed limit of disturbance. Following the methods described under “Bog Turtle Habitat Survey” (Phase 1 survey) of the Guidelines for Bog Turtle Surveys (revised 2020), Mr. Thompson determined that the wetlands referred to as Wetland INC-W-025, INC-W-026, INC-W-028, INC-W-029 had the combination of soils, vegetation, and hydrology typical of habitat occupied by bog turtles. We concur with these habitat determinations.
Because potential bog turtle habitat was found in the Additional Project Area past the timeline requirements for a 2021 Phase 2 bog turtle survey, the DVA has elected to assume the presence of bog turtles in these additional wetland areas and employ avoidance measures to ensure no adverse effects to bog turtles, in lieu of conducting Phase 2 bog turtle surveys. To avoid adverse effects to bog turtles, the DVA has committed to implementing avoidance and minimization measures for work in the Additional Project Area. Since the project duration for the Additional Project Area is relatively short (maximum of 1 month) the DVA will use 18-inch compost filter socks (CFS) adjacent to the Wetlands INC-W-025, INC-W-026, INC-W-028, INC-W-029, per email of October 26, 2021 (to cause less disturbance within the cemetery) in lieu of traditional exclusionary fencing. The short duration of the project ensures that the CFS would remain as an effective bog turtle barrier, and not be subject to compression, crushing and flattening, thus rendering it ineffective at excluding turtles from the project area. The DVA is committed to including these avoidance measures in an approved Sedimentation and Erosion Control Plan. If all construction is completed between November 1 and March 31 and no excavation in wetlands is proposed, the following measures are not necessary.
1) If any exclusionary fencing is entirely erected between November 1 and March 31, it will not be necessary to perform a pre-construction survey.
2) During the period between April 1 and October 31, one pre-construction bog turtle clearance search of the proposed project area of effect will be completed prior to any earth disturbance activity, fencing installation, or other construction. The search area will extend to include an area 10 feet beyond the planned Limit of Disturbance and any temporary staging areas. The pre-construction bog turtle clearance search must be performed by a qualified bog turtle surveyor, who will be obtained from the most current list of “U.S. Fish and Wildlife Service and Pennsylvania Fish and Boat Commission Recognized Qualified Bog Turtle Surveyors.” The bog turtle clearance search must be completed immediately prior to the installation of the habitat protection fence described below.
3) Except as otherwise noted within these avoidance measures, the pre-construction bog turtle clearance search shall be conducted according to the most current survey protocol provided by the U.S. Fish and Wildlife Service and the Pennsylvania Fish and Boat Commission. All Phase 2 survey procedures are applicable except that one pre-construction clearance search per wetland rather than the minimum of four searches per wetland shall be acceptable, and the time of year for performing the search has been extended.
4) If the pre-construction bog turtle clearance search occurs after June 15, herbaceous vegetation within the survey area shall be cut to a height of 4 to 6 inches prior to the survey in order to promote search effectiveness. Vegetation shall be cut using a hand-held trimmer/weed cutter and then carefully raked away from the area to be searched. The qualified surveyor shall conduct the vegetation clearing.
5) Immediately following the pre-construction bog turtle clearance search, a 30-inch-high silt barrier fence shall be erected at the edge of the Limit of Disturbance as habitat protection fencing in accordance with the approved Erosion and Sediment Pollution Control Plan. The habitat protection fence shall be constructed in upland habitat between identified suitable bog turtle habitat and the limit of disturbance to deter bog turtles from circumventing the barrier. No other construction activities may begin until installation of this habitat protection fencing is completed. The habitat protection fence will act as a barrier to prevent possible bog turtles from migrating out of wetlands and waterways into the construction area and to prevent construction activity and sediment from entering the wetland and waterway. The habitat protection fencing will be installed as indicated as soon as practicable following the turtle search and clearance by the qualified bog turtle surveyor. The fencing will be installed only after receiving approval to do so from the qualified bog turtle surveyor following completion of their site search for bog turtles.
6) Installation of all habitat protection fencing and silt barrier fence for erosion and sediment control shall be the responsibility of the contractor and shall be installed and removed by hand. The qualified bog turtle surveyor shall be present during the erection of the habitat protection fence to ensure that it is properly installed at the correct location and depth. Immediately following the fence installation, it shall be inspected by the qualified bog turtle surveyor to ensure that no trench, which could act as a pit-fall trap to turtles, occurs on either side of the fencing. After installation, the habitat protection fence will be inspected and logged daily by the contractor to ensure that no holes are present that turtles can crawl through. If at any time there are holes in the habitat protection fence, OR any turtle (alive, injured, or dead) is observed within the Limit of Disturbance, construction will stop immediately, and Permit Condition 11 below will be followed.
7) All work associated with the project shall be conducted in accordance with the Erosion and Sediment Pollution Control Plan approved by the County Conservation District.
8) All equipment and machinery shall avoid wetland/watercourse habitat upstream and downstream of the proposed construction area. Orange construction fence will be installed to delineate these avoidance areas and will act as a visual warning to prevent construction equipment and personnel from entering and disturbing the potential bog turtle habitat outside the Limit of Disturbance. The Township or its designated representative(s) shall identify and clearly delineate all wetlands for the contractor(s) and will either attach the orange construction fence onto the habitat protection fence or install it immediately in front of the habitat protection fence within the Limit of Disturbance.
9) No material shall be excavated, deposited, or positioned so as to lower the water table or impede the flow of water to any wetland areas; that is, implementation of the project shall not directly or indirectly affect the water quality and quantity of any wetland areas.
10) The qualified bog turtle surveyor shall forward the results of the pre-construction bog turtle survey in writing to the U.S. Fish and Wildlife Service and the Pennsylvania Fish and Boat Commission via mail, facsimile, or e-mail within 48 hours of installation of the habitat protection fence.
11) During construction, if any turtle is observed at a location within 100 feet from the Limit of Disturbance, then construction may continue so long as there are no holes in the habitat protection fence. However, if any turtle (alive, injured, or dead) is observed at any time within the Limit of Disturbance, OR if a hole is observed in the habitat protection fence, then construction will cease immediately, and the following steps will be taken:
a. The contractor will immediately inform the pre-designated site manager who will immediately contact the qualified bog turtle surveyor. The site manager will then immediately implement the following measures:
b. If the turtle appears dead or immobile, the turtle will be left where it was initially observed. If the turtle appears to be mobile, efforts will be made to temporarily contain the turtle until the qualified bog turtle surveyor can take possession of it.
Temporary containment will consist of placing the turtle in a thoroughly clean bucket that has a depth of more than 18 inches. Less than 1 inch of water should be placed in the bucket with the turtle to keep the animal cool and hydrated. The bucket should be placed in a quiet, well-shaded area, preferably within the wetland. The turtle should be handled as little as possible, and temporary containment must not exceed 6 hours.
c. The qualified bog turtle surveyor will identify the species of turtle found and document the location and condition of the turtle. The qualified bog turtle surveyor will also inspect the habitat protection fence and direct any repairs of the fence as needed. If there are holes in the habitat protection fence and/or the turtle is found to be a bog turtle, construction will not resume until the agency consultation procedures described herein are fully implemented, and the habitat protection fence is repaired to re-establish an effective turtle exclusion barrier.
d. If the qualified bog turtle surveyor identifies the turtle species as a bog turtle
(Glyptemys muhlenbergii), then this biologist will immediately notify endangered species biologists at both the U.S.