S06 03 48 21 Precast Concrete Burial Crypts.pdf

PDF 214 KB Posted

Attached to
Indiantown Gap National Cemetery | Phase 5 Expansion Development
Solicitation number
36C10F22R0030
Issued by

View the file

Other files

File Type Posted
S06 A0003 RFI Updated Drawings.pdf PDF
S05 ALL A0003 RFIs Complete .docx DOCX document
S06 36C10F22R0030 A0003.pdf PDF
S04 Pre-Proposal Conference - IGAP Phase 5 Presentation.pdf PDF
S04 Pre-Proposal Conference Attendance Sheet.pdf PDF
S06 PRICE-COST SCHEDULE Attachment.docx DOCX document
S06 A0002 RFI Updated Drawings.pdf PDF
S06 36C10F22R0030 A0002.pdf PDF
S06 23 42 00 Dust Collector.pdf PDF
S06 04 05 16 Masonry Grouting.pdf PDF
S06 05 12 00 Structural Steel Framing.pdf PDF
S06 23 36 00 Air Terminal Units.pdf PDF
S06 Past Performance Questionnaire 36C10F22R0030.docx DOCX document
S06 36C10F22R0030 A0001..pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 124-151.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Divisions 00-33.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 63-96.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 292-302.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 152-291.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D2.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D5-H.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix A-D1.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 16-23.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D4.pdf PDF
S02 36C10F22R0030 F.pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F22R0030.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 24-39.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D3.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220093.pdf PDF
S02 PAST PERFORMANCE QUESTIONNAIRE SAMPLE.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 40-62.pdf PDF
S02 VAAR 852.219-77 VA Notice of Limitations on Subcontracting - Certificate of Compliance.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 97-123.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220006.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 11-15.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 1-10.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA 813-028 Indiantown Gap National Cemetery AEW Project No. CFM0-004 Phase 5 Development RFP Document Submission

PRECAST CONCRETE BURIAL CRYPTS

03 48 21 - 1

SECTION 03 48 21

(DOUBLE DEPTH LAWN CRYPT)

PART 1 - GENERAL

1.1 DESCRIPTION

A. The work of this Section is to furnish all labor, materials, manpower, tools and equipment required to complete the manufacturing and installation of the precast concrete burial crypts as specified and/or shown, including but not limited to the work to:

1. Fabricate and cure: vaults and lids

2. Fabricate intermediate shelves and place inside of vaults

3. Transport and deliver to site

4. Unload units on dunnage or gravel

5. Store and/or install precast concrete burial crypts (units or crypts)

6. Install indicated filter fabric, sub base foundation, and drainage

7. Install units in the prepared crypt fields

8. Provide surveyor certification of placement for crypts

9. Install small stone in the four lid lifting points

10. Backfill between and around the crypts

11. Perform numbering of the crypts on lids and inside vaults, as specified and/or indicated

12. Install sand and/or approved backfill on top of crypts

13. Install approved soil and compact materials as specified, to elevations where topsoil and/or sod is to be placed, as specified

14. Provide surveyor certification of the grading prior to placement of topsoil and/or sod

15. Topsoil shall be furnished and installed as indicated in

Specification Section 32 90 00 PLANTING.

16. Provide additional Materials:

a. Three OSHA -approved crypt lid lifting apparatus

b. Five extra concrete crypt lids

c. A device to easily retrieve and lower the inside shelf by one man without entering the crypt.

17. Any other associated work not provided under other Specifications sections required to complete the Crypt Field construction and installation as specified and/or indicated.

03 48 21 - 2

1.2 DESIGN OVERVIEW

A. The design of the units shall be as described in this Section and their installation layout shall be as illustrated on the Drawings. Design requirements shall be as follows:

1. All perimeter crypts shall be structurally designed for overhead and lateral soil pressure plus live loads specified hereafter.

2. All designs will require that the manufacturer provide fabrication drawings stamped by a Professional Engineer indicating that the design meets or exceeds the structural requirements contained herein.

3. Alternative crypt component designs may be proposed if all the following requirements are met:

a. Comply with the design criteria and the functional tests of this specification.

b. All provisions of this specification shall apply to any proposed alternative design.

c. The Government may accept or reject part or all of any proposed alternative design. The Contractor will pay for all cost for alternate designs, submittals, and reviews.

1.3 RELATED WORK

A. Excavation and Backfill: Section 31 20 00, EARTH MOVING.

B. Materials Testing and Inspection during Fabrication and Construction:

Section 01 45 29, TESTING LABORATORY SERVICES.

C. Commissioning: Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS and Section 03 08 00, COMMISSIONING OF PRE-CAST CRYPTS.

1.4 SUSTAINABILITY REQUIREMENTS

A. Materials in this section may contribute towards contract compliance with sustainability requirements. See Section 01 81 13, SUSTAINABLE

CONSTRUCTION REQUIREMENTS, for project requirements.

B. Blended Cement: It is the intent of this specification to reduce CO2 emissions and other environmentally detrimental effects resulting from the production of portland cement by requiring that all concrete mixes, in aggregate, utilize blended cement mixes to displace portland cement typically included in conventional construction. Provide the following submittals:

1. Copies of concrete design mixes for all installed concrete.

03 48 21 - 3

2. Copies of typical regional baseline concrete design mixes for all compressive strengths used on the Project.

3. Quantities in cubic yards of each installed concrete mix.

C. Biobased Material: For products designated by the USDA’s BioPreferred® program, provide products that meet or exceed USDA recommendations for biobased content, subject to the products compliance with performance requirements in this Section. For more information regarding the product categories covered by the BioPreferred® program, visit http://www.biopreferred.gov.

1.5 REGULATORY REQUIREMENTS FOR RECYCLED CONTENT

A. Products and Materials with Post-Consumer Content and Recovered

Materials Content:

1. Contractor is obligated by contract to satisfy Federal mandates for procurement of products and materials meeting recommendations for post-consumer content and recovered materials content; the list of designated product categories with recommendations has been compiled by the EPA - refer to http://www.epa.gov/wastes/conserve/tools/cpg/products/

2. Materials or products specified by this section may be obligated to satisfy this Federal mandate and Comprehensive Procurement

Guidelines program.

3. The EPA website also provides tools such as a Product Supplier

Directory search engine and product resource guides.

B. Fulfillment of regulatory requirements does not relieve the Contractor of satisfying sustainability requirements stipulated by Section 01 81

13, SUSTAINABLE CONSTRUCTION REQUIREMENTS, as it relates to recycled content; additional product and material selections with recycled content may be required, as determined by Contractor’s Sustainability

Action Plan.

1.6 QUALITY ASSURANCE

A. Manufacturer’s Qualifications: Bid documents shall include documentation that manufacturer has a minimum of three years of experience with pre-casting units of similar type. Current plant certification for the location(s) that will be producing units for this project from the National Precast Concrete Association (NPCA) shall be provided as a submittal prior to any work being performed.

http://www.biopreferred.gov/ https://www.thelagroup.com/owa/redir.aspx?C=759f45b431094b648bc1d796d9b3c3d5&URL=http%3a%2f%2fwww.epa.gov%2fwastes%2fconserve%2ftools%2fcpg%2fproducts%2f

03 48 21 - 4

B. Provide a written stamped certification from a licensed Structural

Engineer that certifies that the units being manufactured conform to the specified design and performance requirements.

C. Installation Qualifications: Provide written documentation that verifies:

1. The installer has been regularly engaged, for at least three years, in installation of pre-cast concrete similar to this project.

D. Fabricate crypts to the interior dimensions described below.

1. Replace or repair units that do not comply with the individual dimensions and tolerances.

E. Prior to, or in the initial stage of crypt production, furnish at the site:

1. Proposed shelf removal tool.

2. Two perimeter crypts.

3. One interior crypt.

a. The three crypts shall:

1) Demonstrate acceptable quality of construction.

2) Be used to conduct the on-site buried crypt functional load test as described herein below.

F. Functional Load Tests: Functional on-site load tests will be made at the Contractor’s expense to insure the units are capable of supporting loads stated. The functional tests will consist of following loading conditions:

1. Confined Loading: An interior unit between two perimeter units shall:

a. Be placed in a hole dug in the ground on site and covered with 24 inches of soil or covered to the maximum depth as shown on the plans, whichever is greater.

1) The soil will be compacted to Standard Proctor (AASHTO T-99) density along the sides of 95% and reduced density over the lid, both as shown on the plans.

a) Impact type of equipment shall not be used on the sides of the crypts as they can cause conditions that exceed the design parameters.

b. An axle load of 12,000 lbs. shall be passed over the covered crypts for a minimum of 10 times in repetition as follows:

03 48 21 - 5

1) In a manner that causes maximum lateral pressure due to wheel load on the sides of the crypts.

c. The crypts shall then:

1) Be fully excavated, exposed and the lids removed to allow careful examination inside and outside.

a) The crypts must not show any signs of stress or cracking.

2. Shelf Load Testing for the intermediate shelf shall be as follows:

a. Apply load to individual support struts. Use one worker with a minimum weight of 200 lbs.

1) Worker shall carefully walk on individual supports to confirm structural integrity and load bearing capability.

a) Worker shall adhere to all safety regulations while performing test.

b. Upon completion of shelf load testing, the inside shelf shall be removed by the removal tool as follows:

1) Without entering the crypt and by one man.

2) Inspected and lowered back into the crypt in the 2nd interment position.

3) The inside shelf must not show any signs of stress, cracking or deflection.

3. Demonstrate the removal and replacement process for the inside shelf. The functioning of the shelf removal tool shall be approved by the NCA Crypt Specialist.

G. Commence production of crypts only after the written submittal(s) are approved and on-site load testing and demonstration have been scheduled for witnessing by the NCA Crypt Specialist.

1.7 DESIGN CRITERIA

A. Design Criteria (Double Depth Crypt): All design calculations and drawings shall be signed and sealed by qualified licensed Structural

Engineer.

1. The units shall be of the following type, style, and size:

a. Type: Precast concrete.

b. Style: One-piece box with separate outer lid and the following:

1) A removable one-piece inside shelf

2) Four casket risers or two casket support bars

3) Drain Holes 4-inch diameter in the floor bottom as follows:

03 48 21 - 6

a) Two drain holes at opposite ends when there are casket risers.

b) Three drain holes at opposite ends and in middle, when there are two support bars.

c. Crypt interior size: Interior minimum dimensions are as follows:

1) 30” minimum width at the inside bottom floor and for the full height of the crypt

2) 86” minimum length along the inside bottom floor and for the full height of the crypt

3) 25” minimum clear height from the highest part of the inside shelf to the underside of the lid

4) 25” minimum clear height from the lowest part of the inside shelf to the top of the casket risers

5) 3/4” minimum height casket risers from the crypt floor spaced

20” from crypt centerline to eliminate pinching of the lowering straps during removal. Four risers required.

d. Crypt height and wall thickness:

1) Exterior maximum height dimension: 60" including the lid.

2) Crypt wall thickness: 2-inches minus 1/2 inch for inside shelf bearing.

3) Perimeter crypts are allowed thicker walls where additional reinforcing is included.

4) Crypt wall sections at support slots originated from the top for the inside shelf may be of lesser thickness.

e. Layout:

1) Crypts shall fit in a 3-foot by 8-foot plot or a lesser plot size as noted on the plans.

2) The lesser plot size shall govern. If the proposed crypts will not fit into the designed/indicated plot size, with adequate room for the between crypt backfill, or if a different plot size is suggested, the Contractor, at no cost to the Owner, shall prepare a revised Layout/Size Plan and submit it for review and approval by the Resident Engineer/Contracting

Officer's Representative (RE/COR).

2. Load Conditions for design of units shall be as follows:

a. A burial depth with soil cover as indicated on the plans.

03 48 21 - 7

b. A center point load of 6,000 lbs. on one square foot, prior to burial.

c. Passage of a wheel axle load of 12,000 lbs. after burial.

d. A 3-foot tall pile of excavated material on top of or adjacent to buried crypts.

3. Submit to the RE/COR for approval the following:

a. Five sets of design documentation showing structural design of the units. In addition, the Contractor shall provide one additional set to NCA Crypt Specialist.

1) This documentation shall include dimensions, methods of construction, and calculations.

b. The Structural Engineer that stamps the design calculations and drawings shall provide:

1) Written recommendations indicating the extent of voids that are allowable in the produced units, without causing any degradation of loading capacity from the design load values.

2) Written recommendations on the conditions where repairs will be allowed, and materials and methods to be used for repairs.

3) Written statement that all repairs to the units shall only be allowed if they are performed according to the written recommendations of the Structural Engineer.

B. Design Criteria (Concrete Lids):

1. To be removable and replaceable.

2. Lid lifting shall be from top positioned hot-dipped galvanized anchors (4-required per lid) with the lifting bowls filled with well washed rounded stone.

a. Furnish the cemetery with three OSHA approved and tag certified wire rope lifting devices for removing the lid. No chain lifting devices allowed.

C. Design Criteria (Inside shelf):

1. One-piece rigid construction

2. Fully conceal the lower casket with a rigid barrier

3. Weigh 40 lbs. or less

4. Allow for easy casket lowering belt removal

5. Capable of holding 400 lbs. indefinitely.

03 48 21 - 8

6. The entire inside shelf should be rigid, non-brittle, non-deteriorating, and have a maximum 1/4-inch gap from all shelf edges to the crypt wall to create a visual barrier.

7. Have one lifting hole in the middle about 2-inches from the edge

3/4-inch maximum diameter.

D. Design Criteria (Inside Shelf Removal Tool(s):

1. Be constructed so one man can easily retrieve and install the shelf from ground level without entering the crypt.

a. Demonstrate the use and functionality of said tool at the crypt buried load testing, for the conditions that will occur at the cemetery during the interments at the crypt sections(s).

E. Design Criteria (Quad Crypt):

1. An alternate concrete Quad unit (one piece) may be used as an approved equal in lieu of two double depth lawn crypt units. The

Quad units shall conform to all other specified herein including:

a. The shared interior concrete wall thickness may be increased to allow for a gap between lids as deemed appropriate to meet layout requirements.

F. Design Criteria (Oversized Crypt):

1. Oversized crypts shall conform to all provisions of this section with the exception that the Interior dimensions and Wall thickness are as follows:

a. 42-inches by 92-inches inside clear span

b. Oversized crypt wall thickness: 2-1/2 inches minus 1/2 inch for inside shelf bearing.

G. Miscellaneous manufacturing requirements:

1. The concrete lid shall be beveled along the entire top perimeter.

Chamfer top edge of lid with a 1:1 chamfer beginning 1/2 inch down from top.

2. The design of casket risers, whether individual spots or bars crossing the bottom, shall allow the casket to rest a minimum of 3/4 inch above the inside floor of the crypt and above the top of the inside shelf in order to aid in casket lowering straps removal. In addition, rests location shall not exceed 21 inches from crypt centerline.

03 48 21 - 9

3. The crypt outside lifting wire shall be designed for transport and installation along with provisions for removal/abandonment of crypt lifting wire once crypt has been installed.

1.8 ALLOWABLE TOLERANCES

A. Tolerances of individual units shall be as follows:

1. Variation in overall crypt outside dimensions of unit (height, length and width): 1/8” plus or minus. There is zero tolerance for any lesser crypt inside minimum clear dimensions.

2. Variation in thickness of precast panels and elements: 1/16” plus or minus.

3. Maximum height differential in final placement in the ground: 1/4” above or below design grade.

4. Cracks greater than 0.030 inches in width are cause for crypt rejection. With evidence of fiber or steel reinforcement, any cracking 0.030” or lesser width that does not extend thru wall is acceptable. Any cracking 0.016 inch or lesser that extends thru wall is acceptable. All other cracks are cause for rejecting crypts that shall be repaired or removed and replaced at no cost to VA.

1.9 SUBMITTALS

A. In accordance with Section 01 33 23, SAMPLES AND SHOP DRAWINGS, within 45 days of the approval of the shop drawings, furnish to the RE/COR and the NCA Crypt Specialist the following:

1. Samples: deliver to the site for testing and inspection:

a. Two perimeter crypts and one interior crypt.

B. Submit a detailed concrete Mix Design of Self Consolidating Concrete

(SCC) with a 15% minimum requirement of a cement substitute of fly ash and/or other pozzalons.

C. Submit Shop Drawings:

1. Installation Narrative:

a. Method of transportation.

b. Method of handling and placement.

c. Method of verification of depth of cover.

2. Production Drawings:

a. Elevation view of each unit.

b. Plan view of unit.

03 48 21 - 10

c. Sections and details to show quantities, sizes and position of reinforcing steel, inserts, and essential embedded hardware for fabrication, handling, transportation and installation.

d. Section, details and location of specialty lid lifting anchors, caps, and lid lifting system.

e. Dimensions and finishes.

D. Submit Product Design Data:

1. Structural adequacy calculations of units (crypts), performed by a licensed Structural Engineer.

2. Loadings for Design Calculations:

a. Initial handling and erection stresses.

b. Dead and live loads specified.

c. Other loads specified for units as applicable.

d. Deflection of precast members.

e. Product test reports:

1) The concrete shall be tested for the compressive strength and beam flexural strength as specified herein. An approved independent, commercial testing laboratory shall perform tests. Certified copies of test reports, including test data and results shall be submitted to the RE/COR immediately after the strength tests have been completed. The tests shall be as specified herein.

2) Prior to backfilling over crypts and at Contractor expense, the RE/COR may pick a single crypt for coring another bottom slab drainage hole by an independent lab with said core being analyzed (petrography testing) and results submitted verifying evidence of fly ash or other pozzalons as specified.

3) Based on failed testing, the RE/COR may request more frequent testing to ensure quality of the product and pozzalons content is present, again at Contractor expense.

3. Manufacturer’s Literature and Data:

a. Each type of anchorage, angle, and fastener.

1.10 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Delivery and Handling: Units shall be transported, stored and handled so as to prevent damage to surfaces, edges and corners and to prevent development of stresses and cracks. Provide temporary bracing protection devices and measures as necessary to prevent damage to the

03 48 21 - 11 units during handling, transportation and storage. Transportation, storage and handling of units without damage is required. Any damage caused by accident or negligence on the Contractor’s part shall be corrected at the Contractor’s expense. Use the designed crypt lifting wire system to transport crypts. On the job site, forklift handling of crypts may be approved by the RE/COR only following:

1. Verification that the structural design is adequate.

2. Verification by the manufacturer and demonstration that the field procedures will cause no crypt damage.

3. Submission of written safety procedures to be followed so the procedure is maintained as SAFE.

B. Storage:

1. Units may be stored within crypt fields being constructed on gravel, or at other designated locations(s) on site, as long as they are set on blocking, gravel or other approved methods to prevent damage or plugging of the bottom drainage holes.

C. Markings and Identifications:

1. Markings, including logos, trademarks and proprietary information are prohibited on surfaces of crypts.

2. Date of manufacture (month, day, and year) shall be written on the box and lid with permanent ink or an equivalent marking.

1.11 COORDINATION

A. Coordinate the manufacture, delivery, storage and installation of the units with related work.

1.12 GUARANTEE

A. After erection, completed work will be, subject to terms of Article, GUARANTEE in Division 01, GENERAL CONDITIONS, except guarantee period is extended to five years.

1.13 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by the basic designation only. Comply with applicable provisions and recommendations of the following, except as otherwise shown or specified.

B. American Association of State Highway and Transportation Officials

T99-01(2011) Moisture-Density Relations of Soils Using a 2.5 kg (5.5 lb) Rammer and a 305 mm (12 inch) Drop.

03 48 21 - 12

T180-01(2011) Moisture-Density Relations of Soils using a

4.54 kg (10 lb) Rammer and a 457 mm (18 inch)

Drop.

C. American Concrete Institute:

ACI Manual of Concrete Practice 2011 Edition.

ACI 318-05 Building Code Requirements for Structural

Concrete

D. American Society for Testing and Materials (ASTM):

A36/A36M-12 Standard Specification for Carbon Structural

Steel.

A153/A153M-09 Standard Specification for Zinc Coating (Hot

Dip) on Iron and Steel Hardware.

A615/A615M-13 Standard Specification for Deformed and Plain

Carbon-Steel Bars for Concrete Reinforcement

A1064/A1064M-13 Standard Specifications for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and

Deformed, for Concrete.

C31/C31M-12 Standard Practice for Making and Curing

Concrete Test Specimens in the Field.

C33/C33M-13 Standard Specification for Concrete Aggregates

C39/C39M-14 Standard Test Method for Compressive Strength of Cylindrical Concrete Specimen

C78/C78M-10e1 Standard Test Method for Flexural Strength for

Concrete (Using Simple Beam with Third-Point

Loading)

C150/C150M-12 Standard Specification for Portland Cement.

C172/C172M-14 Standard Practice for Sampling Freshly Mixed

Concrete.

C260/C260M-10a Standard Specification for Air-Training

Admixtures for Concrete.

C494/C494M-13 Standard Specification for Chemical Admixtures for Concrete

C595/C595-13 Standard Specification for Blended Hydraulic

Cement.

C1017/C1017M-13 Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete.

03 48 21 - 13

C1116/C1116M-10a Standard Specification for Fiber-Reinforced

Concrete.

C1157/C1157M-11 Standard Performance Specification for

Hydraulic Cement

C1399/C1399M-10 Standard Test Methods for Obtaining Residual-

Strength of Fiber-Reinforced Concrete.

C1602/C1602M-12 Standard Specification for Mixing Water Used in the Production of Hydraulic Cement Concrete.

E. Pennsylvania Department of Transportation (PennDOT):

PennDOT Publication 408/2020 Specifications

PART 2 - PRODUCTS

2.1 MATERIALS

A. Precast Concrete: All crypts shall be of concrete with the following:

1. A minimum 28 days compressive strength of 5,000 psi

2. Self-Consolidating Concrete (SCC) containing structural fiber with an inverted slump between 22” and 28”

3. A minimum of 15% cement substitute of fly ash and/or other pozzolans. Fiber is not required for crypt lids

4. Hydraulic Cement: ASTM C150 or ASTM C1157 or ASTM C595

5. Normal weight Aggregates: ASTM C 33

6. Water: ASTM C1602

7. Chemical Admixtures:

a. Water reducers, accelerating and retarding: ASTM C 494

b. Air Entraining: ASTM C260

c. Admixtures for flowing concrete: ASTM C1017

d. Admixtures with no standard designation shall be used only with approval of VA.

8. Prohibited Admixtures: Calcium Chloride thyocyanates or admixtures containing more than 0.1 percent chloride ions.

B. Reinforcement:

1. Welded Steel Wire Fabric: ASTM A1064.

2. Steel Wire Reinforcement: ASTM A82, cold drawn.

3. Steel Reinforcement: ASTM A615 Grade 60, deformed.

4. Inserts, Anchors, Dowels and Accessories: Steel, ASTM A36, zinc coated ASTM A153 hot-dipped galvanized finish G90.

5. Fiber: Macrofiber complying with ASTM C1116

03 48 21 - 14

C. Form Coatings:

1. Use commercial formulation form-coating compounds that will not bond with, stain, or adversely affect concrete surfaces.

D. Paint:

1. Use commercial Concrete & Garage Floor Epoxy Acrylic Paint for crypt concrete lid & inside wall surface numbering. Paint as manufactured by BEHR Deep Base #930 or approved equal. The use of an approved equivalent spray paint product, if approved by the NCA Crypt

Specialist, shall only be for use on the interior crypt numbers.

E. Other

1. Geotextile: Use Separation Geotextile Class 4 Type A per PennDOT

Specification Section 735.

2. Underdrain: See Section 33 40 00, STORM SEWER UTILITIES

2.2 FABRICATION

A. General:

1. Units shall be fabricated in accordance with the minimum interior dimensions and tolerances indicated herein, with concrete surfaces that are smooth and free of irregularities.

B. Finishes:

1. Surface holes 1/4” and smaller caused by air bubbles, normal color variations, normal form joint marks, small chips 1/4” and smaller and spalling no more than 0.1 square meter (one square foot) total per unit are permitted.

2. Exposed steel reinforcing, honeycomb, bugholes, and cracks not within tolerances are not permitted.

3. The lid lifting system shall be as follows:

a. Top mounted and consist of hot dip galvanized steel anchors (four per lid) each in a 2-1/2” diameter minimum recessed bowl of depth sufficient to easily connect lifting device as designated compatible by anchor manufacturer.

b. Anchors to be installed at locations to ensure maximum lid lifting stability.

c. The lifting bowl will be filled with rounded stone as indicated on the drawings, to facilitate removal in the winter.

4. Concrete shall have no evidence of segregation of materials.

C. Reinforcement:

03 48 21 - 15

1. Provide steel and fiber reinforcing as required for casting, handling, erection loads, lateral and overhead fill, and equipment live loads.

2. Reinforcing steel shall be free of dirt, mill scale, rust, oil, grease, ice, snow, water and placed within approved tolerances in accordance with ACI 318. Careful placement of reinforcing is required to avoid overlapping at thin points of the units.

D. Concrete Placement:

1. Porosity, strength, weight and gradation of coarse aggregate shall be as required to produce specified characteristics.

2. Units shall be cast in steel forms designed to suit shape and finish required. Each element of the unit shall be cast as an integral piece free of joints and seams.

E. Curing:

1. 75% of specified concrete compressive strength shall be attained before transportation of units to the cemetery or storage site.

2. Units shall be cured as required to develop specified structural characteristics and shall be stored in a manner that will permit all surfaces to cure equally.

3. Units shall be properly cured in accordance with the applicable provisions of the current ACI Manual of Concrete Practice.

F. Surface Treatment and Corrective Work:

1. Units that have minor chipping of edges and corners shall be repaired by a method approved by the RE/COR.

2. Cracked/damaged units exceeding tolerances shall be removed by the

Contractor at no cost to the government.

3. Any corrective work beyond what the RE/COR determines is minor, shall be handled according to written procedures from the Structural

Engineer that stamped the design for the units. Otherwise, the units shall be removed and replaced.

2.3 TESTING AND INSPECTION

A. Contractor’s Responsibility for Inspection: The Contractor is responsible for the performance of all inspection requirements including:

1. Removal of lids

2. Number painting inside crypts

3. Replacement of the lids for inspection by the RE/COR.

03 48 21 - 16

a. The RE/COR reserves the right to perform any of the inspections set forth in the specification when deemed necessary to assure that the units conform to prescribed requirements.

PART 3 - EXECUTION

3.1 CRYPT FIELD QUALITY ASSURANCE

A. Testing: The Contractor shall procure an independent qualified testing agency to perform concrete tests during crypt production and prepare test reports.

1. Concrete Cylinder testing for compressive strength:

a. Three cylinders per day of crypt production to be taken in accordance to ASTM C172 as applicable to SCC.

b. Strength to exceed 5000 psi after 28 days curing in accordance to

ASTM C31 & C39.

c. Test inverted slump when cylinders are made.

2. Beam testing to confirm design flexure strength:

a. Once at the beginning of crypt production, a minimum of three beams with fiber shall be taken for testing of Flexural

Performance of Fiber-Reinforced Concrete in accordance with ASTM

C78 and C1399. All beams’ flexural strength shall exceed the crypt design flexural strength requirements and residual strength of fiber reinforced concrete and shall exceed capacity of conventionally reinforced concrete wall design as submitted by the Structural Engineer and approved by VA. Fiber Manufacturer shall verify type and dosage rate of the test beams are identical in crypt production.

3. A single verification test of fly ash in the crypt concrete mix required at the discretion of the RE/COR.

3.2 GENERAL LAYOUT CONTROL

A. A professional registered Land Surveyor shall establish sufficient lines, grades and control for the horizontal placement, slope of the base and top, and vertical alignment for the sides of units in accordance with the design drawings.

3.3 PREPARATION

A. Before beginning installation, inspect work of other trades insofar as it affects the work of this section. Commencing installation of units will be construed as accepting as suitable the work of other trades.

03 48 21 - 17

B. Verify by survey, rough grading of aggregate for first row of crypts to be installed in a field. Provide a certification by the professional surveyor to the RE/COR that the rough grading for the base stone for the first row of crypts to be installed, as well as that the survey control points for crypt setting have been set according to the plans, prior to the Contractor starting to set crypts in the field. The

Surveyor shall indicate to the RE/COR where the control points are located and how they are protected.

C. Verify by testing, compaction of prepared subgrade and subbase to meet

Standard Proctor (AASHTO T-99).

D. Verify by survey locations and elevations of units relative to control points indicated on plans. Submit new control point layout if a crypt size other than specified is used.

E. The plots dimensions indicated on the crypt layout plans shall be used for the installation of the crypts. The crypt plots are theoretical rectangles of the size indicated and are based upon the dimensions indicated measured on a horizontal surface of the same elevation. The measurement of the plot size at the top of the crypt when the crypt is installed on a slope will be larger than the dimensions shown on the crypt layout drawings which are based upon the size of the plots on a horizontal surface, not a sloped surface. The crypts shall be installed to be centered in the individual burial plots so the center of the top edge of the crypt lid is located within a circle with a diameter of ½” that is located at the center of the representation of the plot on the horizontal surface. For a 3’ x 8’ plot, the center of the crypt lid (when centered in the opening of the crypt vault) shall be at the center point of the of the 3’ x 8’ rectangle (measured on the horizontal plane), with an allowable deviation from the theoretical center point of no greater than ¼” in any direction. The center of the vault and lid measured at the top surface of the lid shall be within a

½” diameter circle centered at the center of the crypt plot located on the horizontal plane.

3.4 HANDLING, INSTALLATION AND PAINTING

A. Handling:

1. Units shall be handled in a vertical plane at all times and stacked vertically on wood supports of adequate strength or placed on gravel until erected. Use of approved designed OEM lifting cable system

03 48 21 - 18 that has been deemed to be safe for handling the units shall be used during the setting process, where workers are nearby.

2. Lift units with suitable lifting devices at points provided by manufacturer.

3. Provide temporary wood bracing to comply with manufacturer’s recommendations to keep crypt bottom off ground during storage.

B. Installation and Painting:

1. Install units by competent erector crews trained and certified as competent by unit’s manufacturer.

2. Use all means necessary to protect units from being damaged in transport and during and after installation. Lids or other parts of the crypt that show damage from bouncing during transport shall be replaced by the Contractor at no cost to the Owner.

3. Accurately install by aligning and leveling units in accordance with plans. Assure that crypts are in straight horizontal alignment.

4. After crypt installation and prior to backfill, remove lids with the specified lifting apparatus for crypt inspection by the RE/COR inspector and numbering. Numbers furnished by NCA shall be painted on the outside of the crypt lids and on the upper inside crypt short wall, both at the headstone end. Numbers shall be permanent paint as specified and approximately twelve inches high. Crypt lid number painting must be applied to a clean, dust-free surface requiring paint application within 10 seconds of surface cleaning. After completion of inspection and marking, the Contractor shall replace the lids. Any damage to lids or crypts will be the responsibility of the Contractor.

3.5 PROTECTION OF WORK

A. Use all means necessary to protect units from being damaged during and after installation.

3.6 REPLACEMENT AND REPAIR

A. Remove and replace units that the RE/COR has determined are damaged, cracked beyond tolerances, broken, improperly fabricated, or otherwise defective and are structurally unsound and unacceptable.

B. Units having minor defects not affecting serviceability or appearance may be repaired when approved by NCA Inspector.

C. Proposed repair work shall be sound, permanent, and flush with adjacent surfaces and submitted for approval by NCA Crypt Specialist.

03 48 21 - 19

D. Replacements and repairs shall be done at no additional cost to the

Government.

3.7 BACKFILLING AND CRYPT FIELD PROTECTION

A. Prior to the backfill being placed between the crypts, a professional registered Land Surveyor shall:

1. Survey the in-place crypts and provide a written certification that they are, within allowable tolerances installed:

a. At the design locations

b. Properly aligned

c. At correct elevations and slopes

B. The following documents shall be provided to the RE/COR:

1. An electronic drawing of the as-built conditions for the installed crypts.

2. A paper copy at appropriate scale so the crypt field is fully shown on a maximum sheet size of 24” x 36” with all indications of variances in the placement from the design drawings shown.

3. A written certification that during the manufacturing, handling, setting, and or crypt numbering process that each of the lifting bowls were operated using the designed lifting device, and that any excessive concrete debris has been removed to allow free operation of the lifting bowls. A description of when in the process each of the lifting bowls were used shall also be provided.

C. When all of the crypts in a specific field are installed as indicated in the design drawings and details, and the surveyor has so certified, the RE/COR will approve the Contractor proceeding with the backfill between the crypts. The Contractor is responsible for insuring that the crypts do not move during the backfill operations, including but not limited to providing adequate blocking at the base of the units, if deemed necessary, to prevent them from moving during the backfill operations.

D. Protect installed crypt units during backfill operations.

E. Install approved backfill against outside walls of all units, insuring no voids are remaining. Approved backfill shall:

1. Contain no materials that will cause a concentrated point load.

2. The perimeter wall backfill shall be compacted to Standard Proctor

(AASHTO T-99) to 95% density to the level equal to the top of the crypts.

03 48 21 - 20

3. Shall be compacted without using large vibratory equipment near crypts as impact loading may cause damage or failure of the crypt.

F. Backfill between the crypts where gap is less than 2-inches shall be as follows:

1. Install approved (rounded) gravel that meets the specified gradation into gaps between crypts leaving no voids.

a. At RE/COR’s discretion, a non-rounded stone may be considered as a substitute for the rounded stone. The RE/COR may accept the

(non-rounded) stone only following demonstration, through an approved submittal process, that rounded stone is not available for less than 4 times the cost of a cut/crushed angular (non-rounded) aggregate substitute. Largest size for the non-rounded stones shall not exceed the gradation size for the rounded stones. (A smaller gradation size will be required for the non-rounded stones to ensure that the stones are not larger that their rounded counterparts.) The non-rounded stone shall only be considered when with the largest size of the stone passing a sieve size does not exceed the allowable stone size for the rounded stone gradations. The non-rounded stone may be approved when the size is as described above, and with a successful demonstration that filling gaps between crypts leaves no voids, because the stones fall into place without bridging as should occur when using rounded stones.

2. Use rodding to assure no bridging occurs and void areas are eliminated.

3. No sand allowed.

4. As a resource saving measure, the use of angular stone of suitable gradation (typically the same stone used as drainage stone for below the crypts) shall be allowed in the space between the head and foot of the crypts only, if the Contractor demonstrates a successful method of placement that prevents the larger angular stone from spreading into the gaps along the long sides of side by side crypts.

Aggregate

Size No.

Grading Requirements - Amounts finer than Each Sieve (Square

Openings), Mass Percent

1/2” 3/8” No. 4 No. 8 No. 16 No.50

8 100 85 to 100 10 to 30 0 to 10 0 to 5

03 48 21 - 21

Aggregate

Size No.

Grading Requirements - Amounts finer than Each Sieve (Square

Openings), Mass Percent

1/2” 3/8” No. 4 No. 8 No. 16 No.50

89 100 90 to 100 20 to 55 5 to 30 0 to 10 0 to 5

G. Install backfill on top of units and compact. Backfill shall be as shown on plans. The entire backfill atop units shall be compacted to

85% density (Standard Proctor (AASHTO T-99).

H. No equipment over the crypts should exceed crypt design loads as specified herein 12,000 lbs. axle, which includes compacting equipment.

No vibratory compaction equipment over or alongside crypts unless impact loads are shown not to exceed crypt design loads.

I. Immediately during crypts install, mark the crypt field edges with temporary driven 5-foot tall lathes & signage for easy identification by vehicles carrying fill, topsoil, compost, sod, water or other.

Signage shall state “12,000-lb axle load maximum. Keep 10 yards away” and placed minimum 50-ft apart.

J. Lathes & signage to be maintained in-place during backfilling thru final acceptance of the crypt field.

K. Finish grading and prepare topsoil as indicated on plans.

L. Do not store or stockpile any stone, sand, backfill, crypts or any other material over 4-feet high within 10 yards of ground on top of installed crypts. Affected crypts subject to said loading condition as determined by the RE/COR shall be inspected for possible damages with all excavation, lid lifting, fill replacement and all other work as necessary, all at Contractor’s expense.

M. Do not allow any vehicle that exceeds a 12,000-lb axle load, 6000-lb wheel load or equivalent pressure per square inch to traverse or park within 10 yards of or on top of installed crypts. Affected crypts subject to said loading condition as determined by the RE/COR shall be inspected for possible damages with all excavation, lid lifting, fill replacement and all other work as necessary, all at Contractor’s expense.

3.8 INSPECTION AND ACCEPTANCE

A. Final inspection and acceptance will be by RE/COR following receipt of:

1. Recommendations from NCA Crypt Specialist and/or A/E team, as applicable.

03 48 21 - 22

2. Electronic DWG files of each individual crypt field, with coordinates of the monument markers indicated, and each burial plot being indicated with a closed polygon, and corresponding NCA burial plot identification number, along with the section markers and number for the section.

- - E N D - - -

SECTION 03 48 21 PRECAST CONCRETE BURIAL CRYPTS (Double Depth Lawn Crypt)
PART 1 - GENERAL
1.1 DESCRIPTION
A. The work of this Section is to furnish all labor, materials, manpower, tools and equipment required to complete the manufacturing and installation of the precast concrete burial crypts as specified and/or shown, including but not limited to the wor...
1. Fabricate and cure: vaults and lids
2. Fabricate intermediate shelves and place inside of vaults
3. Transport and deliver to site
4. Unload units on dunnage or gravel
5. Store and/or install precast concrete burial crypts (units or crypts)
6. Install indicated filter fabric, sub base foundation, and drainage
7. Install units in the prepared crypt fields
8. Provide surveyor certification of placement for crypts
9. Install small stone in the four lid lifting points
10. Backfill between and around the crypts
11. Perform numbering of the crypts on lids and inside vaults, as specified and/or indicated
12. Install sand and/or approved backfill on top of crypts
13. Install approved soil and compact materials as specified, to elevations where topsoil and/or sod is to be placed, as specified
14. Provide surveyor certification of the grading prior to placement of topsoil and/or sod
15. Topsoil shall be furnished and installed as indicated in Specification Section 32 90 00 PLANTING.
16. Provide additional Materials:
a. Three OSHA -approved crypt lid lifting apparatus
b. Five extra concrete crypt lids
c. A device to easily retrieve and lower the inside shelf by one man without entering the crypt.
17. Any other associated work not provided under other Specifications sections required to complete the Crypt Field construction and installation as specified and/or indicated.
1.2 Design Overview
A. The design of the units shall be as described in this Section and their installation layout shall be as illustrated on the Drawings. Design requirements shall be as follows:
1. All perimeter crypts shall be structurally designed for overhead and lateral soil pressure plus live loads specified hereafter.
2. All designs will require that the manufacturer provide fabrication drawings stamped by a Professional Engineer indicating that the design meets or exceeds the structural requirements contained herein.
3. Alternative crypt component designs may be proposed if all the following requirements are met:
a. Comply with the design criteria and the functional tests of this specification.
b. All provisions of this specification shall apply to any proposed alternative design.
c. The Government may accept or reject part or all of any proposed alternative design. The Contractor will pay for all cost for alternate designs, submittals, and reviews.
1.3 RELATED WORK
A. Excavation and Backfill: Section 31 20 00, EARTH MOVING.
B. Materials Testing and Inspection during Fabrication and Construction: Section 01 45 29, TESTING LABORATORY SERVICES.
C. Commissioning: Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS and Section 03 08 00, COMMISSIONING OF PRE-CAST CRYPTS.
D. Geotextile: Section 31 05 19.13. GEOTEXTILE FOR EARTHWORK
1.4 SUSTAINABILITY REQUIREMENTS
A. Materials in this section may contribute towards contract compliance with sustainability requirements. See Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS, for project requirements.
B. Blended Cement: It is the intent of this specification to reduce CO2 emissions and other environmentally detrimental effects resulting from the production of portland cement by requiring that all concrete mixes, in aggregate, utilize blended cement...
1. Copies of concrete design mixes for all installed concrete.
2. Copies of typical regional baseline concrete design mixes for all compressive strengths used on the Project.
3. Quantities in cubic yards of each installed concrete mix.

C. Biobased Material: For products designated by the USDA’s BioPreferred® program, provide products that meet or exceed USDA recommendations for biobased content, subject to the products compliance with performance requirements in this Section. For ...

1.5 REGULATORY REQUIREMENTS FOR RECYCLED CONTENT
A. Products and Materials with Post-Consumer Content and Recovered Materials Content:
1. Contractor is obligated by contract to satisfy Federal mandates for procurement of products and materials meeting recommendations for post-consumer content and recovered materials content; the list of designated product categories with recommendati...
2. Materials or products specified by this section may be obligated to satisfy this Federal mandate and Comprehensive Procurement Guidelines program.
3. The EPA website also provides tools such as a Product Supplier Directory search engine and product resource guides.

B. Fulfillment of regulatory requirements does not relieve the Contractor of satisfying sustainability requirements stipulated by Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS, as it relates to recycled content; additional product and materi...

1.6 QUALITY ASSURANCE
A. Manufacturer’s Qualifications: Bid documents shall include documentation that manufacturer has a minimum of three years of experience with pre-casting units of similar type. Current plant certification for the location(s) that will be producing un...
B. Provide a written stamped certification from a licensed Structural Engineer that certifies that the units being manufactured conform to the specified design and performance requirements.
C. Installation Qualifications: Provide written documentation that verifies:
1. The installer has been regularly engaged, for at least three years, in installation of pre-cast concrete similar to this project.
D. Fabricate crypts to the interior dimensions described below.
1. Replace or repair units that do not comply with the individual dimensions and tolerances.
E. Prior to, or in the initial stage of crypt production, furnish at the site:
1. Proposed shelf removal tool.
2. Two perimeter crypts.
3. One interior crypt.
a. The three crypts shall:
1) Demonstrate acceptable quality of construction.
2) Be used to conduct the on-site buried crypt functional load test as described herein below.
F. Functional Load Tests: Functional on-site load tests will be made at the Contractor’s expense to insure the units are capable of supporting loads stated. The functional tests will consist of following loading conditions:
1. Confined Loading: An interior unit between two perimeter units shall:
a. Be placed in a hole dug in the ground on site and covered with 24 inches of soil or covered to the maximum depth as shown on the plans, whichever is greater.
1) The soil will be compacted to Standard Proctor (AASHTO T-99) density along the sides of 95% and reduced density over the lid, both as shown on the plans.
a) Impact type of equipment shall not be used on the sides of the crypts as they can cause conditions that exceed the design parameters.
b. An axle load of 12,000 lbs. shall be passed over the covered crypts for a minimum of 10 times in repetition as follows:
1) In a manner that causes maximum lateral pressure due to wheel load on the sides of the crypts.
c. The crypts shall then:
1) Be fully excavated, exposed and the lids removed to allow careful examination inside and outside.
a) The crypts must not show any signs of stress or cracking.
2. Shelf Load Testing for the intermediate shelf shall be as follows:
a. Apply load to individual support struts. Use one worker with a minimum weight of 200 lbs.
1) Worker shall carefully walk on individual supports to confirm structural integrity and load bearing capability.
a) Worker shall adhere to all safety regulations while performing test.
b. Upon completion of shelf load testing, the inside shelf shall be removed by the removal tool as follows:
1) Without entering the crypt and by one man.
2) Inspected and lowered back into the crypt in the 2nd interment position.
3) The inside shelf must not show any signs of stress, cracking or deflection.

3. Demonstrate the removal and replacement process for the inside shelf. The functioning of the shelf removal tool shall be approved by the NCA Crypt Specialist.

G. Commence production of crypts only after the written submittal(s) are approved and on-site load testing and demonstration have been scheduled for witnessing by the NCA Crypt Specialist.

1.7 DESIGN CRITERIA
A. Design Criteria (Double Depth Crypt): All design calculations and drawings shall be signed and sealed by qualified licensed Structural Engineer.
1. The units shall be of the following type, style, and size:
a. Type: Precast concrete.
b. Style: One-piece box with separate outer lid and the following:
1) A removable one-piece inside shelf
2) Four casket risers or two casket support bars
3) Drain Holes 4-inch diameter in the floor bottom as follows:
a) Two drain holes at opposite ends when there are casket risers.
b) Three drain holes at opposite ends and in middle, when there are two support bars.
c. Crypt interior size: Interior minimum dimensions are as follows:
1) 30” minimum width at the inside bottom floor and for the full height of the crypt
2) 86” minimum length along the inside bottom floor and for the full height of the crypt
3) 25” minimum clear height from the highest part of the inside shelf to the underside of the lid
4) 25” minimum clear height from the lowest part of the inside shelf to the top of the casket risers
5) 3/4” minimum height casket risers from the crypt floor spaced 20” from crypt centerline to eliminate pinching of the lowering straps during removal. Four risers required.
d. Crypt height and wall thickness:
1) Exterior maximum height dimension: 60" including the lid.
2) Crypt wall thickness: 2-inches minus 1/2 inch for inside shelf bearing.
3) Perimeter crypts are allowed thicker walls where additional reinforcing is included.
4) Crypt wall sections at support slots originated from the top for the inside shelf may be of lesser thickness.
e. Layout:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .