S02 VA813-028 IGNC Phase 5 Specs_Appendix D3.pdf

PDF 40 MB Posted

Attached to
Indiantown Gap National Cemetery | Phase 5 Expansion Development
Solicitation number
36C10F22R0030
Issued by

View the file

Other files

File Type Posted
S06 A0003 RFI Updated Drawings.pdf PDF
S05 ALL A0003 RFIs Complete .docx DOCX document
S06 36C10F22R0030 A0003.pdf PDF
S04 Pre-Proposal Conference - IGAP Phase 5 Presentation.pdf PDF
S06 03 48 21 Precast Concrete Burial Crypts.pdf PDF
S04 Pre-Proposal Conference Attendance Sheet.pdf PDF
S06 PRICE-COST SCHEDULE Attachment.docx DOCX document
S06 A0002 RFI Updated Drawings.pdf PDF
S06 36C10F22R0030 A0002.pdf PDF
S06 23 42 00 Dust Collector.pdf PDF
S06 04 05 16 Masonry Grouting.pdf PDF
S06 05 12 00 Structural Steel Framing.pdf PDF
S06 23 36 00 Air Terminal Units.pdf PDF
S06 Past Performance Questionnaire 36C10F22R0030.docx DOCX document
S06 36C10F22R0030 A0001..pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 124-151.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Divisions 00-33.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 63-96.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 292-302.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 152-291.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D2.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D5-H.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix A-D1.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 16-23.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D4.pdf PDF
S02 36C10F22R0030 F.pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F22R0030.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 24-39.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220093.pdf PDF
S02 PAST PERFORMANCE QUESTIONNAIRE SAMPLE.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 40-62.pdf PDF
S02 VAAR 852.219-77 VA Notice of Limitations on Subcontracting - Certificate of Compliance.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 97-123.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220006.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 11-15.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 1-10.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LPLP

LPLP

LP

LP

UNION TOWNSHIP, LEBANON COUNTY

MUNICIPAL BOUNDARY LINE

EAST HANOVER TOWNSHIP, LEBANON COUNTY

UNION TOWNSHIP, LEBANON COUNTY

APPROXIMATE TOWNSHIP LINE

EAST HANOVER TOWNSHIP, LEBANON COUNTY

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

OLD CUMBERLAND

STREET

OLD CUMBERLAND

STREET

INDIANTOWN GAP

ROAD

FIS

HE

R

AV

EN

UE

BIDDLE DRIVE

BIDDLE DRIVE

BIDDLE DRIVE

BIDDLE DRIVE

W

COMMITTAL

SHELTER 1

FFE=505.27

METAL

GARAGE

METAL

GARAGE

METAL

GARAGE

NEW ENTRANCE ROAD

NEW ROAD 'A'

NE

W

S

ER

VI

CE

E

NT

RA

NC

E

X

X

X

NEW LOOP ROAD

X

X

NPDES

NPDES

NPDES NPDES

NPDES

NPDES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDESNPDESNPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NP

DE

S

NP

DE

S

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

N

PD

ES

NPDES

NPDES

NPDES

N

PD

ES

NPDES

NPDES

NPDES

NPDES NPDES NPDES NPDES

AREA 1

SEE SHEET

GC201

AREA 2

SEE SHEET

GC202

AREA 3

SEE SHEET

GC203

AREA 4

SEE SHEET

GC204

AREA 5

SEE SHEET

GC205

AREA 9

SEE SHEET

GC209

OLD CUMBERLAND ST

FI

SH

ER

A

VE

BIDDLE DR

AREA 6

SEE SHEET

GC206

AREA 7

SEE SHEET

GC207

AREA 8

SEE SHEET

GC208

INDIANTOWN GAP RD

FIRST ENERGY EASEMENT

(SEE NOTE 4)

PBTH

INC-W-028

PBTH

INC-W-029

PBTH

INC-W-025

BRIDGE #1

BRIDGE #2

BRIDGE #3

ASHER MINER ROAD

GRAPHICAL SCALE: 1"=200'

200 100 0 200 400 600

GC200

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

OVERALL E&S CONTROL KEY PLAN - STAGE II

GRAPHIC LEGEND

NPDES PROJECT BOUNDARY

LIMITS OF WORK

NORTH

NPDES

POTENTIAL BOG TURTLE

HABITAT (PBTH) BUFFER

GENERAL NOTES:

1. THE NPDES PROJECT BOUNDARY IS SHOWN AS AN OVERALL OUTLINE OF THE

ACTIVITIES OCCURRING AT THE CEMETERY, WHICH ALSO ENCOMPASSES THE

PERIMETER ROADS USED TO ACCESS THE VARIOUS WORK LOCATIONS.

2. NO CONSTRUCTION OR DISTURBANCE IS TO OCCUR OUTSIDE OF THE LIMITS OF

WORK (LIMITS OF DISTURBANCE) ILLUSTRATED ON THE PLANS.

3. STAGE II EROSION & SEDIMENT CONTROL REPRESENTS CONDITIONS DURING

CONSTRUCTION AND INITIAL STABILIZATION UPON FINAL GRADING. REFER TO

CONSTRUCTION PHASING ON SHEETS GI201 THROUGH GI205 FOR REQUIRED

CONSTRUCTION SEQUENCING. SEQUENCING OF EROSION & SEDIMENT

CONTROLS MUST FOLLOW WITH EACH PHASE.

4. NO WORK SHALL BE PERFORMED NEAR OF UNDER THE TRANSMISSION LINES

WITHOUT EXECUTING AN AGREEMENT WITH FIRST ENERGY POWER COMPANY

REGARDING SAFE WORK REQUIREMENTS. PLEASE CONTACT SHARON SCHMITT

AT 973-401-8223/201-274-9640 AND SSCHMITT@FIRSTENERGYCORP.COM.

5. REFER TO SHEET GI100 FOR DETAILED POTENTIAL BOG TURTLE HABITAT

(PBTH) AVOIDANCE MEASURES.

6. CUTTING TREES IS ONLY PERMITTED BETWEEN OCTOBER 1 AND MARCH 31 AS

A PROTECTIVE/AVOIDANCE MEASURE FOR INDIANA BATS.

POTENTIAL BOG

TURTLE HABITAT (PBTH)

DWG 28 of 302

THIS PLAN HAS BEEN REVIEWED

for the Department of Environmental Protection

By: Karl Kerchner

Lebanon County Conservation District

Date:_______________________________________ and determined to adequately satisfy the purpose and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

Commonwealth.

April 12, 2022

CmB

HSG C

BeC

HSG B

425430

422423424426427428429431432433

430 435 440

428 429 431 432 433 434 436 437 438 439 441 442

430427 428 429 431

440 436437438439441

426427428429

420 418

430435

5 445

423424426427

428429431432433434

443444

3424426427428429

431432433434

436437

430430435

429429431431 432 432

1 44

3 44

NEW ENTRANCE ROAD

MA

IN

TE

NA

NC

E

CO

MP

LE

X

EQ

UI

PM

EN

T

ST

OR

AG

E

BU

ILD

IN

G

EAST HANOVER TOWNSHIP, LEBANON COUNTY

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

MODIFIED SEDIMENT TRAP #3

TOP OF EMBANKMENT = 443.75

BOTTOM OF FACILITY = 439.75

CE

IP

IP

INC-W-020

OLD CUMBERLAND STREET

O

LD

C U

M

BER

LAN

D

STR

EET

INC-W-020

425430

422423424426427428429431432433

430430435

429429431431 432 432

1 44

3 44

IP

CFS

CFS

CFS

CFS

INC-W-020

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

NORTH

GC201

9 7

SEE INSET A

GRAPHICAL SCALE: 1"=20'

20 10 0 20 40 60

E&S CONTROL PLAN STAGE II AREA 1

MATCH LINE TO SHEET GC202

M

AT

C

H L

IN

E

TO

S

H

EE

T

GC

CE

IP

LIMITS OF WORK

ROCK CONSTRUCTION ENTRANCE

COMPOST FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

EXISTING CONTOUR

PROPOSED CONTOUR261

INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

EROSION CONTROL BLANKET A

EXISTING WETLANDS

HIGH VISIBILITY BARRIER FENCE

EMERGENCY SPILLWAY

EROSION CONTROL BLANKET C

100 YEAR FLOOD PLAIN

COMPOST SOCK CONCRETE

WASHOUT

INSET A

RIPRAP APRON WITH OUTLET

NUMBER (SEE TABLE IN DETAIL)

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

STREAM FLOW DIRECTION

DWG 29 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

BkB

HSG B

BeD

HSG B

WeD

HSG D

440 436437438439441

426427428429

420 418

430435

5 445

423424426427

428429431432433434

443444

3424426427428429

431432433434

436437

0439 441 442 443

447448

451452453

5 463

46446

430430435

429429431431 432 432

433434

1 44

3 44

NEW ENTRANCE ROAD

MA

IN

TE

NA

NC

E

CO

MP

LE

X

FU

TU

RE

MA

IN

TE

NA

NC

E

CO

MP

LE

X

EQ

UI

PM

EN

T

ST

OR

AG

E

BU

ILD

IN

G

OP

EN

E

QU

IP

ME

NT

ST

OR

AG

E

BU

ILD

IN

G

FU

EL

PU

MP

S

BULKSTORAGE

UNION TOWNSHIP, LEBANON COUNTY

MUNICIPAL BOUNDARY LINE

EAST HANOVER TOWNSHIP, LEBANON COUNTY

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

W

MODIFIED SEDIMENT TRAP #6

TOP OF EMBANKMENT = 443.75

BOTTOM OF FACILITY = 438.75

CE

IP

IP

IP

IP

IP

IP

O

LD

C U

M

BE

R

LA

N D

S

TR

EE

T

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

NORTH

GC202

9 7

NORTH

E&S CONTROL PLAN STAGE II AREA 2

M

AT

C H

L

IN

E

TO

S H

EE

T

GC

MATCH LINE TO SHEET GC201

NORTH

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

CE

IP

LIMITS OF WORK

ROCK CONSTRUCTION ENTRANCE

PERMANENT RUNOFF DIVERSION SOCK

WITH NO. AND SIZE (SEE TABLE GC501)

EXISTING CONTOUR

PROPOSED CONTOUR261

INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

EXISTING WETLANDS

HIGH VISIBILITY BARRIER FENCE

CHECKDAM FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

100 YEAR FLOOD PLAIN

EMERGENCY SPILLWAY

EROSION CONTROL BLANKET A

EROSION CONTROL BLANKET C

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

COMPOST FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

RIPRAP APRON WITH OUTLET

NUMBER (SEE TABLE IN DETAIL)

STREAM FLOW DIRECTION

DWG 30 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

HSG B

468 469

471 472 473 474

482 483

470475480 469471472473474476477478479481

468469

460 456 457458459

461462463464

477478

457 458 459

NEW ROAD 'A'

NEW LOOP ROAD

BeB

HSG B

WeD

HSG D

BkB

HSG B

WeB

HSG D

MODIFIED SEDIMENT TRAP #5

TOP OF EMBANKMENT = 471.75

BOTTOM OF FACILITY = 468.75

MODIFIED SEDIMENT TRAP #1

TOP OF FACILITY = 460.75

BOTTOM OF FACILITY = 455.75

IP

IPIP

INC-W-020

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

NORTH

GC203

9 7

NORTH

E&S CONTROL PLAN STAGE II AREA 3

M

AT

C H

L

IN

E

TO

S H

EE

T

GC

MATCH LINE TO SHEET GC204

M

ATC

H

LIN

E TO

SH

EET

GC202

NORTH

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

CE

LIMITS OF WORK

ROCK CONSTRUCTION ENTRANCE

EXISTING CONTOUR

PROPOSED CONTOUR261

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

EXISTING WETLANDS

HIGH VISIBILITY BARRIER FENCE

EROSION CONTROL BLANKET A

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

IP INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

CHECKDAM FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

EMERGENCY SPILLWAY

EROSION CONTROL BLANKET C

COMPOST FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

RIPRAP APRON WITH OUTLET

NUMBER (SEE TABLE IN DETAIL)

STREAM FLOW DIRECTION

DWG 31 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

455 454

446447448449

451452453454456457458459

482483

466467468469

471472473474

470 466

46947

458459 461462463464

466467468469 471472473474

481 482 483 484

5 47

480 481

481482

481482

477478

456 457 458 459

457458459

462463464466

NE

W

S

ER

VI

CE

E

NT

RA

NC

E

X X

X X X

X X

X X

X X

XXXX

X X

CO

CO

CO

CO

CO

CO

COLUMBARIUM D

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

WeD

HSG D

WeB

HSG D

WeB

HSG D

BeC

HSG B

WeB

HSG D

SEDIMENT TRAP #2

TOP OF EMBANKMENT = 458.75

BOTTOM OF FACILITY = 452.75

MODIFIED SEDIMENT TRAP #7

TOP OF EMBANKMENT = 481.50

BOTTOM OF FACILITY = 476.50

CE

IP

IP

IP

IP

IP

IP

IP

PROPOSED

CONTRACTOR

YARD

OLD CUMBERLAND STREET

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

NORTH

GC204

9 7

NORTH

E&S CONTROL PLAN STAGE II AREA 4

M

AT

C H

L

IN

E

TO

S H

EE

T

GC

MATCH LINE TO SHEET GC203

M

ATC

H

LIN

E TO

SH

EET

GC201

NORTH

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

CE

LIMITS OF WORK

ROCK CONSTRUCTION ENTRANCE

EXISTING CONTOUR

PROPOSED CONTOUR261

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

EXISTING WETLANDS

HIGH VISIBILITY BARRIER FENCE

EROSION CONTROL BLANKET A

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

IP INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

CHECKDAM FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

EMERGENCY SPILLWAY

EROSION CONTROL BLANKET C

COMPOST FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

RIPRAP APRON WITH OUTLET

NUMBER (SEE TABLE IN DETAIL)

STREAM FLOW DIRECTION

DWG 32 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

BeB

16C

16B

21A

16A

19B 19C

24E

24C 24D

24B24A

33A

38B

38A

17A 17B

CmB

HSG C

CmB

HSG C

WeD

HSG D

PBTH

INC-W-025

BRIDGE #3

(SEE SHEET BR103

FOR E&S CONTROLS)

IP

IP

IP

IP

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

NORTH

GC205

9 7

M

AT

C H

L

IN

E

TO

S H

EE

T

GC

E&S CONTROL PLAN STAGE II AREA 5

MATCH LINE TO SHEET GC206

M

ATC

H

LIN

E TO

SH

EET

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

IP

LIMITS OF WORK

EXISTING CONTOUR

PROPOSED CONTOUR261

INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

EXISTING WETLANDS

HIGH VISIBILITY BARRIER FENCE

EXISTING BOG TURTLE HABITAT

BUFFER

POTENTIAL BOG TURTLE HABITAT (PBTH)

M

AT

C H

L

IN

E

TO

S H

EE

T

GC

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

STREAM FLOW DIRECTION

DWG 33 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

3503503

HONOR

GUARD

TR

EM

EM

31A

31B

33A

W

COMMITTAL

SHELTER 1

FFE=505.27

NPDES

NPDES

NPDES

NPDES

NPDES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES NPDES NPDES NPDES NPDES NPDES NPDES NPDES

CmB

HSG C

FIRST ENERGY EASEMENT

(SEE NOTE 4 SHEET GC200)

IP

IP

IP

IP

IP

IP

STORM CHAMBER

SYSTEM

BIDDLE DRIVE

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

NORTH

GC206

9 7

MATCH LINE TO SHEET GC205

E&S CONTROL PLAN STAGE II AREA 6

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

LIMITS OF WORK

EXISTING CONTOUR

PROPOSED CONTOUR261

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

EXISTING WETLANDS

HIGH VISIBILITY BARRIER FENCE

COMPOST SOCK CONCRETE

WASHOUT

EXISTING BOG TURTLE HABITAT

BUFFER

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

STREAM FLOW DIRECTION

IP INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

CHECKDAM FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

COMPOST FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

DWG 34 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

BrB

HSG D

BeB

HSG B

BkC

HSG B

W

AS

H

BA

Y

XXXX

X X

X

X

EM

EM

EM

TR

XX

METAL

GARAGE

METAL

GARAGE

METAL

GARAGE

NPDES

NPDES

NPDES

NPDES

NPDES

BkC

HSG B

BkB

HSG B

CmB

HSG C

PBTH

INC-W-028

PBTH

INC-W-029

BRIDGE #1

(SEE SHEET BR101

FOR E&S CONTROLS)

BRIDGE #2

(SEE SHEET BR102

FOR E&S CONTROLS)

IP

IP

IP

IP

IP

SEE CT102 FOR

ADDITIONAL PBTH

PROTECTION

SEE CT102 FOR

ADDITIONAL PBTH

PROTECTION

OLD CUMBERLAND STREET

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

NORTH

GC207

9 7

E&S CONTROL PLAN STAGE II AREA 7

MATCH LINE TO SHEET

GC208

MATCH LINE TO SHEET

GC205

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

LIMITS OF WORK

EXISTING CONTOUR

PROPOSED CONTOUR261

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

EXISTING WETLANDS

HIGH VISIBILITY BARRIER FENCE

POTENTIAL BOG TURTLE HABITAT (PBTH)

EXISTING BOG TURTLE HABITAT

BUFFER

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

IP INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

COMPOST FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

STREAM FLOW DIRECTION

DWG 35 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

BeC

X

X

9C

8C

NPDES

NPDES

NPDES

NPDES

NPDES

N

PD

ES

N

PD

ES

N

PD

ES

N

PD

ES

NPDES

NPDES

NPDES

NPDES

NPDES

N

PD

ES

NP

DE

S

NPDES

NPDES

NPDES NPDES NPDES NPDES NPDES NPDES

N

PD

ES

NPDES

NPDES NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

Ho

HSG

CmB

HSG C

IP

IP

FIRST ENERGY EASEMENT

(SEE NOTE 4 SHEET GC200)

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

NORTH

GC208

9 7

E&S CONTROL PLAN STAGE II AREA 8

MATCH LINE TO SHEET

GC207

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

IP

LIMITS OF WORK

EXISTING CONTOUR

PROPOSED CONTOUR261

INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

EXISTING WETLANDS

TEMPORARY HIGH VISIBILITY

BARRIER FENCE - ORANGE FENCE

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

COMPOST FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

STREAM FLOW DIRECTION

DWG 36 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

Ho

HSG

B/D

BkB

HSG B

WeD

HSG D

BrB

HSG D

WeD

HSG D

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X

X

XX

X

X

X

X

LP

NPDES

NPDES

NPDES

NPDES

NPDES

NPDESNPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDESNPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NP

DE

S

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

N

PD

ES

Ho

HSG

B/D

Ho

HSG

B/D

WeD

HSG D

BkC

HSG B

BkB

HSG B

Ho

HSG

B/D

CmB

HSG C

IP

CONTRACTOR AND RESIDENT

ENGINEER TRAILERS (SEE

SHEET CS107 FOR LAYOUT)

FI

SH

ER

A

VE

NU

E

INDIANTOWN GAP ROAD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

GRAPHICAL SCALE: 1"=40'

40 20 0 40 80 120

GC209

EM

EM

EM

TR

TR

EM

EM

CO

CO

CO

CO

CO

CO

CO

KEY MAP

SCALE = 1 : 1,000

INDIANTOWN GAP RD

OLD CUMBERLAND ST

BIDDLE DR

ASHER MINER RD

FIS

HE

R

AV

E OL

D

CU

MB

ER

LA

ND

S

T

NORTH

E&S CONTROL PLAN STAGE II AREA 9

MATCH LINE TO SHEET

GC208

LEBANON COUNTY SOILS INFORMATION

SYMBOL NAME DRAINAGE CLASS HSG HYDRIC

BeB Bedington shaly silt loam, 3 to 8 percent slopes Well drained B No

BeC Bedington shaly silt loam, 8 to 15 percent slopes Well drained B No

BeD Bedington shaly silt loam, 15 to 25 percent slopes Well drained B No

BegC Beddington channery silt loam, 8 to 15 percent slopes Well drained B No

BkB Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BkC Berks channery silt loam, 3 to 8 percent slopes Well drained B No

BrB Brinkerton silt loam, 3 to 8 percent slopes Poorly drained D Yes

CmB Comly silt loam, 3 to 8 percent slopes Moderately well drained C No

Ho Holly Silt loam Poorly drained B/D Yes

WeB Weikert channery silt loam, 3 to 8 percent slopes Somewhat excessively drained D No

WeD Weikert channery silt loam, 15 to 25 percent slopes Somewhat excessively drained D No

LIMITS OF WORK

EXISTING CONTOUR

PROPOSED CONTOUR261

GRAPHIC LEGEND

NPDES NPDES LIMITS

EXISTING STREAM LINE

EXISTING SOIL BOUNDARY

EXISTING WETLANDS

TEMPORARY HIGH VISIBILITY

BARRIER FENCE - ORANGE FENCE

ENTRY MEADOW REFORESTATION

AREA

NOTES:

1. ALL AREAS DISTURBED DURING CONSTRUCTION THAT WILL BECOME TURF ACCORDING TO THE LANDSCAPE PLANS UPON THE COMPLETION OF CONSTRUCTION SHALL BE TEMPORARILY STABILIZED WITH SEED, SOIL AMENDMENTS AND MULCH PER THE SPECIFICATIONS LISTED ON SHEET GC500.

PERMANENT STABILIZATION PER THE LANDSCAPE PLANS.

2. ALL AREAS TO BE REFORESTED AND STROMWATER BASINS SHALL BE PERMANENTLY SEEDED PER

SHEET L-101 AND STABILIZED WITH MULCH.

IP INLET PROTECTION - TYPE M INLET

STAGE II - DEVELOPMENT

COMPOST FILTER SOCK WITH

NO. AND SIZE (SEE TABLE GC501)

STREAM FLOW DIRECTION

DWG 37 of 302 and requirements of 25 PA Code Chapter 102, to minimize the potential for accelerated erosion and sedimentation to the waters of the

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JCH WCS

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AL

TE

RN

AT

E

® GC500

EROSION AND SEDIMENT CONTROL BMP SEQUENCING:

NOTES:

1: E&S CONTROL BMP SEQUENCING HAS BEEN COORDINATED WITH THE CONSTRUCTION

SEQUENCING PLANS ON DRAWING NUMBERS GI201 THROUGH GI205. REFER TO THESE

PLANS FOR GENERAL SEQUENCING REQUIREMENTS, MAINTENANCE OF TRAFFIC AND

CONTRACTOR PRIMARY CONSTRUCTION ACCESS ROUTES.

2: STAGE I E&S CONTROL REPRESENTS EXISTING CONDITIONS PRIOR TO ANY WORK BEING

PERFORMED AT THE SITE. STATE II E&S CONTROL REPRESENTS CONDITIONS DURING

CONSTRUCTION AND INITIAL STABILIZATION UPON FINAL GRADING. REFER TO BOTH STAGE I

AND STAGE II E&S CONTROLS FOR EACH PHASE OF CONSTRUCTION LISTED BELOW.

PHASE 1 CONSTRUCTION (RELATED TO THE NEW EXPANSION AREA, SHEET GI201):

1. PERFORM SURVEY STAKEOUT AND FIELD-MARK LIMITS OF DISTURBANCE (LOD) IN

EXPANSION AREA AND ENVIRONMENTALLY SENSITIVE AREAS, INCLUDING WETLANDS

WITHIN THE LOD.

1.1. INSTALL HIGH VISIBILITY BARRIER FENCE AROUND WETLANDS. NO CROSSINGS OF

WETLANDS ARE ANTICIPATED.

1.2. INSTALL TEMPORARY VISUAL BARRIER CONSTRUCTION FENCE TO SHIELD CEMETERY

VISITORS TO CONSTRUCTION OPERATIONS. ADJUST AS NECESSARY AS CONSTRUCTION

ACTIVITIES PROCEED.

1.3. CROSSING STREAM CHANNELS WITH ANY TYPE OF CONSTRUCTION VEHICLE OR

EQUIPMENT IS UNACCEPTABLE. IF TEMPORARY STREAM CROSSINGS ARE DETERMINED

TO BE REQUIRED BY THE CONTRACTOR, ADDITIONAL PLANS AND DETAILS NEED TO BE

PROVIDED AND APPROVED BY THE CONSERVATION DISTRICT BEFORE PROCEEDING.

2. TEMPORARY CONTRACTOR YARD

2.1. INSTALL ROCK CONSTRUCTION ENTRANCE AND COMPOST FILTER SOCKS.

2.2. ROUGH GRADE AND INSTALL GRAVEL, PAVEMENT, FENCED CONTRACTOR AREA,

FENCED STAGING AREA, AND TRAILERS.

2.3. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, REMOVE ALL TEMPORARY

CONTRACTOR YARD FACILITIES AND RESTORE AREA WITH PERMANENT STABILIZATION

AS SHOWN ON THE LANDSCAPE PLANS.

2.4. ONCE ALL AREAS ARE PERMANENTLY STABILIZED, REMOVE ROCK CONSTRUCTION

ENTRANCE. CUT OPEN SOCK MESH AND SPREAD COMPOST AS A SOIL SUPPLEMENT.

3. NEW BURIAL SECTIONS, INTERMENT AMENITIES AND ROADWAYS

3.1. INSTALL ROCK CONSTRUCTION ENTRANCES, CONSTRUCTION ACCESS ROADS AND

COMPOST FILTER SOCKS AS SHOWN ON STAGE I E&S PLANS.

3.2. INSTALL INLET PROTECTION AT EXISTING INLETS BEFORE CONSTRUCTION OF NEW

CONNECTING ROADS BEGINS.

3.3. INSTALL SEDIMENT TRAP #2, INCLUDING EMBANKMENTS, SPILLWAY, BAFFLE, OUTLET

STRUCTURES AND PIPE, RIP-RAP APRON, ANTI-SEEP COLLARS, AND CLAY CORE. DO

NOT INSTALL AMENDED SOILS UNTIL THE ENTIRE SITE IS STABILIZED NEAR THE END OF

CONSTRUCTION. STABILIZE TRAP SLOPES AND AREAS DISTURBED TO CONSTRUCT

SEDIMENT TRAP (EROSION CONTROL BLANKETS FOR EMBANKMENTS SLOPES SHOWN

ON SHEET GC101, GC102, AND GC204).

3.4. BEGIN SITE EARTHWORK ON NEW BURIAL SECTIONS, INTERMENT AMENITIES AND

ROADWAYS WITHIN THE EXPANSION AREA.

3.4.1. PERFORM CLEARING AND GRUBBING WITHIN THE TREE LINE TO BE REMOVED AS

SHOWN ON SHEET CD100.

3.4.2. PERFORM SELECT CLEARING WITHIN 100-FT INVASIVE TREE SPECIES CLEARING

AREA AS SHOWN ON SHEET CD100 AND ONLY DURING THE PRESCRIBED TIMES OF

YEAR.

3.4.3. STRIP AND STOCKPILE TOPSOIL. PROTECT TOPSOIL STOCKPILE WITH

PERIMETER COMPOST FILTER SOCK.

3.4.4. PROVIDE INCREMENTAL STABILIZATION AS THE EXCAVATION AND FILL AREAS

ARE ROUGH GRADED.

3.5. NEW STREAM CROSSING

3.5.1. INSTALL BYPASS PUMP, SANDBAG DAMS, ENERGY DISSIPATER AND COMPOST

FILTER SOCKS.

3.5.1. INSTALL NEW CULVERT PIPE AND ENDWALLS. STABILIZE WITH RIP-RAP.

3.5.2. ROUGH GRADE EMBANKMENTS AND FILLS OVER NEW CULVERT AND STABILIZE

WITH EROSION CONTROL BLANKETS SHOWN ON THE STAGE II E&S PLANS. INSTALL

ROCK FILTERS AT BOTTOMS OF CHANNEL SLOPES CREATED BY NEW GRADING.

3.5.3. STABILIZE STREAMBANKS, AS REQUIRED, IF DISTURBED DURING CULVERT

INSTALLATION.

3.5.4. REMOVE BYPASS PUMP AND ASSOCIATED E&S CONTROLS. CUT OPEN SOCK

MESH AND SPREAD COMPOST AS A SOIL SUPPLEMENT.

3.6. CONTINUE CONSTRUCTION OF BURIAL SECTIONS, INTERMENT AMENITIES AND

ROADWAYS WITHIN THE EXPANSION AREA.

3.6.1. INSTALL CRYPTS AND UNDERDRAINAGE. BACKFILL CRYPTS AND FINE GRADE,

TOPSOIL, INSTALL LANDSCAPING AND ESTABLISH TURF AS SHOWN ON THE

LANDSCAPE PLANS.

3.6.2. INSTALL PERMANENT STORMWATER MANAGEMENT FACILITIES AS SEDIMENT

TRAPS WITHIN THE EXPANSION AREA, INCLUDING EMBANKMENTS, FOREBAYS,

SPILLWAYS, OUTLET STRUCTURES AND PIPES, RIP-RAP APRONS, ANTI-SEEP

COLLARS, AND CLAY CORES. GRADE BASIN FACILITIES TO PROPOSED BOTTOM

GRADE. DO NOT INSTALL AMENDED SOILS. REFER TO SPECIFIC STORMWATER

MANAGEMENT FACILITY INSTALLATION SEQUENCES FOR GENERAL STEPS AND

CRITICAL STAGES.

3.6.3. INSTALL NEW INLETS AND STORM PIPING AS CONSTRUCTION PROGRESSES.

ONCE NEW INLETS ARE INSTALLED, PROVIDE INLET PROTECTION AS SHOWN ON

THE STAGE II E&S PLANS.

3.6.4. INSTALL BURIED UTILITIES, SUCH AS IRRIGATION LINES, AND BACKFILL TRENCH.

FOR TRENCHES OUTSIDE OF PAVED AREAS, INSTALL TOPSOIL AND PERMANENTLY

STABILIZE TRENCH WITH SEED AND MULCH PER PLANTING SPECIFICATIONS.

3.6.5. INSTALL CRUSHED AGGREGATE BASE FOR NEW ASPHALT ROADWAYS AND

PERMANENT GRAVEL ACCESS ROADS AS SOON AS SURFACES ARE GRADED.

3.6.6. INSTALL CURBING AND ASPHALT PAVEMENT FOR NEW ROADWAYS.

3.6.7. PERMANENTLY STABILIZE EMBANKMENT SLOPES FOR BURIAL SECTIONS,

INTERMENT AMENITIES AND ROADWAYS WITH EROSION CONTROL BLANKETS

SHOWN ON THE STAGE II E&S PLANS. INSTALL FILTER SOCK CHECK DAMS ALONG

CHANNEL SLOPES CREATED BY NEW GRADING.

3.6.8. INSTALL LANDSCAPING AND ESTABLISH TURF AS SHOWN ON THE LANDSCAPE

PLANS FOR ALL TURF AREAS.

3.7. INSTALL AMENDED SOILS WITHIN PERMANENT STORMWATER MANAGEMENT

INFILTRATION FACILITIES. EXCAVATE ONE FOOT BELOW FINAL GRADE ELEVATION AND

INSTALL ONE FOOT OF AMENDED SOILS. IN BMP #1, REMOVE SEDIMENT FROM BOTTOM

AND REVEGETAGE WITHOUT AMENDED SOILS. REFER TO SPECIFIC STORMWATER

MANAGEMENT FACILITY INSTALLATION SEQUENCES FOR GENERAL STEPS AND CRITICAL

STAGES.

3.8. ONCE ALL AREAS ARE PERMANENTLY STABILIZED, REMOVE ROCK CONSTRUCTION

ENTRANCES. CUT OPEN SOCK MESH AND SPREAD COMPOST AS A SOIL SUPPLEMENT.

4. INSTALL NEW IRRIGATION WELL AND ROUGH GRADE IRRIGATION POND. PERMANENTLY

STABILIZE IRRIGATION POND EMBANKMENTS AS SHOWN ON LANDSCAPE PLANS AND WITH

EROSION CONTROL BLANKETS SHOWN ON SHEET GC203.

5. NEW MAINTENANCE COMPLEX AREA

5.1. INSTALL NEW INLETS AND STORM PIPING WITHIN THE MAINTENANCE COMPLEX. ONCE

NEW INLETS ARE INSTALLED, PROVIDE INLET PROTECTION AS SHOWN ON THE SHEET

GC202.

5.2. INSTALL POTABLE WATER WELL AND BURIED UTILITIES, SUCH AS THE WATER SERVICE

AND SANITARY SEWER FORCE MAIN AND BACKFILL TRENCH. FOR TRENCHES OUTSIDE

OF PAVED AREAS, INSTALL TOPSOIL AND PERMANENTLY STABILIZE TRENCH WITH SEED

AND MULCH PER PLANTING SPECIFICATIONS..

5.3. INSTALL CRUSHED AGGREGATE BASE AS SOON AS SURFACES ARE GRADED.

5.4. PERMANENTLY STABILIZE EMBANKMENT SLOPES AROUND MAINTENANCE AREA WITH

EROSION CONTROL BLANKETS SHOWN ON SHEET GC202. INSTALL FILTER SOCK CHECK

DAMS ALONG CHANNEL SLOPES CREATED BY NEW GRADING.

5.5. CONSTRUCT BUILDINGS AND STRUCTURES WITHIN MAINTENANCE AREA.

5.6. INSTALL ASPHALT PAVEMENT.

5.7. ESTABLISH TURF AS SHOWN ON THE LANDSCAPE PLANS FOR ALL TURF AREAS.

5.8. ONCE ALL AREAS ARE PERMANENTLY STABILIZED, REMOVE ROCK CONSTRUCTION

ENTRANCE. CUT OPEN SOCK MESH AND SPREAD COMPOST AS A SOIL SUPPLEMENT.

6. REFOREST ALL OTHER AREAS AS SHOWN ON THE LANDSCAPE PLANS.

PHASE 1 CONSTRUCTION (RELATED TO EXISTING CEMETERY IMPROVEMENTS, STEP 1 SHEET

GI201):

7. EXCAVATE TRENCH FOR REPLACEMENT OF EXISTING SANITARY SEWER LINE AROUND

ADMINISTRATION BUILDING. INSTALL NEW PIPE AND BACKFILL TRENCH. INSTALL TOPSOIL

AND PERMANENTLY STABILIZE TRENCH WITH SEED AND MULCH PER PLANTING

SPECIFICATIONS.

8. TALL LANDSCAPING AROUND COMMITTAL SERVICE SHELTER #2 AND PERMANENTLY

STABILIZE.

9. VIDE ENTRY MEADOW REFORESTATION AS SHOWN ON SHEET L-107 AND PERMANENTLY

STABILIZE AREA.

10. INSTALL MAIN ENTRY LANDSCAPING AND PERMANENTLY STABILIZE AREA.

PHASE 1 CONSTRUCTION (RELATED TO EXISTING CEMETERY IMPROVEMENTS AT THE HONOR

GUARD AREA, STEP 2 SHEET GI201):

11. PERFORM SURVEY STAKEOUT AND FIELD-MARK LIMITS OF DISTURBANCE (LOD) IN HONOR

GUARD AREA AND ENVIRONMENTALLY SENSITIVE AREAS, INCLUDING WETLANDS WITHIN

THE LOD.

11.1. INSTALL HIGH VISIBILITY BARRIER FENCE AROUND WETLANDS. NO CROSSINGS OF

WETLANDS ARE ANTICIPATED.

11.2. INSTALL TEMPORARY VISUAL BARRIER CONSTRUCTION FENCE TO SHIELD CEMETERY

VISITORS TO CONSTRUCTION OPERATIONS. ADJUST AS NECESSARY AS CONSTRUCTION

ACTIVITIES PROCEED.

12. INSTALL ROCK CONSTRUCTION ENTRANCE, INLET PROTECTION, AND COMPOST FILTER

SOCKS AS SHOWN ON STAGE I E&S PLANS.

13. DEMOLISH EXISTING ROADWAYS, LANDSCAPING AND UTILITIES AS SHOWN ON SHEET

CD101.

14. STRIP AND STOCKPILE TOPSOIL. PROTECT TOPSOIL STOCKPILE WITH PERIMETER

COMPOST FILTER SOCK.

15. PROVIDE INCREMENTAL STABILIZATION AS THE EXCAVATION AND FILL AREAS ARE ROUGH

GRADED.

16. INSTALL NEW INLETS AND STORM PIPING WITHIN THE HONOR GUARD AREA. ONCE NEW

INLETS ARE INSTALLED, PROVIDE INLET PROTECTION AS SHOWN ON THE SHEET GC206.

17. INSTALL BURIED STORMWATER MANAGEMENT CHAMBER SYSTEM AND BACKFILL. INSTALL

OUTLET PIPE AND RIP-RAP APRON. REFER TO CHAMBER SYSTEM INSTALLATION SEQUENCE

FOR GENERAL STEPS AND CRITICAL STAGES.

18. INSTALL BURIED UTILITIES, SUCH AS THE WATER SERVICE AND SANITARY SEWER LATERAL, AND BACKFILL TRENCH. FOR TRENCHES OUTSIDE OF PAVED AREAS, INSTALL TOPSOIL AND

PERMANENTLY STABILIZE TRENCH WITH SEED AND MULCH PER PLANTING SPECIFICATIONS.

19. INSTALL CRUSHED AGGREGATE BASE AS SOON AS SURFACES ARE GRADED.

20. CONSTRUCT NEW HONOR GUARD BUILDING.

21. DEMOLISH EXISTING HONOR GUARD BUILDING AND INSTALL NEW ASPHALT PARKING LOT

AND ROADWAYS.

22. INSTALL LANDSCAPING AND ESTABLISH TURF AS SHOWN ON THE LANDSCAPE PLANS AND

PERMANENTLY STABILIZE AREA.

23. ONCE ALL AREAS ARE PERMANENTLY STABILIZED, REMOVE ROCK CONSTRUCTION

ENTRANCE. CUT OPEN SOCK MESH AND SPREAD COMPOST AS A SOIL SUPPLEMENT.

PHASE 2 CONSTRUCTION (RELATED TO REPAIR WORK ON BRIDGE #1, SHEET GI202):

24. INSTALL COMPOST FILTER SOCKS AS SHOWN ON SHEET BR101.

25. REPAIR BRIDGE.

26. ONCE ALL AREAS ARE PERMANENTLY STABILIZED, CUT OPEN SOCK MESH AND SPREAD

COMPOST AS A SOIL SUPPLEMENT.

PHASE 3 CONSTRUCTION (RELATED TO REPAIR WORK ON BRIDGE #2, SHEET GI203):

27. INSTALL COMPOST FILTER SOCKS AS SHOWN ON SHEET BR101.

28. REPAIR BRIDGE.

29. ONCE ALL AREAS ARE PERMANENTLY STABILIZED, CUT OPEN SOCK MESH AND SPREAD

COMPOST AS A SOIL SUPPLEMENT.

PHASE 4 CONSTRUCTION (RELATED TO REPAIR WORK ON BRIDGE #3, SHEET GI204):

30. INSTALL COMPOST FILTER SOCKS AS SHOWN ON SHEET BR101.

31. REPAIR BRIDGE.

32. ONCE ALL AREAS ARE PERMANENTLY STABILIZED, CUT OPEN SOCK MESH AND SPREAD

COMPOST AS A SOIL SUPPLEMENT.

PHASE 5 CONSTRUCTION (RELATED TO ADDITIONAL EXISTING CEMETERY IMPROVEMENTS,

SHEET GI205):

33. ADMINISTRATION BUILDING ENTRY WAY PINNING

33.1. INSTALL CONCRETE WASHOUT AREA IN CLOSE PROXIMITY TO ADMINISTRATION

BUILDING.

33.2. PERFORM CONCRETE ENTRY WAY REPAIRS AND PERMANENTLY STABILIZE BACKFILL

AREA WITH SEED AND MULCH PER PLANTING SPECIFICATIONS.

33.3. ONCE ALL AREAS ARE PERMANENTLY STABILIZED, REMOVE WASHOUT AREA AND

DISPOSE OF EXCESS CONCRETE PROPERLY.

34. ASPHALT PATH WIDENING

34.1. INSTALL COMPOST FILTER SOCKS AS SHOWN ON STAGE II E&S PLANS.

34.2. INSTALL ASPHALT PATH AND PERMANENTLY STABILIZE BACKFILL AREA WITH SEED

AND MULCH PER PLANTING SPECIFICATIONS.

34.3. CUT OPEN SOCK MESH AND SPREAD COMPOST AS A SOIL SUPPLEMENT.

35. INLET REPAIR

35.1. INSTALL INLET PROTECTION IN THE PARTICULAR AREA OF WORK.

35.2. REPLACE INLET AND REPAIR ASSOCIATED ROADWAY. REINSTALL INLET PROTECTION

AS SOON AS PRACTICAL WHILE ROADWAY REPAIRS ARE ONGOING.

35.3. ONCE ROADWAY REPAIRS ARE COMPLETE FOR THAT PARTICULAR AREA OF WORK,

REMOVE INLET PROTECTION AND MOVE TO NEXT AREA.

36. INSTALL ADDITIONAL CURBING AND PERMANENTLY STABILIZE BACKFILL AREA WITH SEED

AND MULCH PER PLANTING SPECIFICATIONS.

STANDARD EROSION AND SEDIMENT CONTROL NOTES:

1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH

THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE

CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.

2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE CONTRACTING OFFICER REPRESENTATIVE (COR) SHALL INVITE ALL CONTRACTORS, THE CEMETERY DIRECTOR, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE E&S PLAN, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE

PRECONSTRUCTION MEETING.

3. THE CONTRACTOR SHALL NOTIFY, AT LEAST SEVENTY-TWO (72) HOURS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM, INC. AT 1-800-242-1776 FOR THE LOCATION

OF EXISTING UNDERGROUND UTILITIES.

4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS.

DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL CONSERVATION DISTRICT PRIOR TO

IMPLEMENTATION.

5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND

OTHER OBJECTIONABLE MATERIAL.

6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .