S06 05 12 00 Structural Steel Framing.pdf

PDF 67 KB Posted

Attached to
Indiantown Gap National Cemetery | Phase 5 Expansion Development
Solicitation number
36C10F22R0030
Issued by

View the file

Other files

File Type Posted
S06 A0003 RFI Updated Drawings.pdf PDF
S05 ALL A0003 RFIs Complete .docx DOCX document
S06 36C10F22R0030 A0003.pdf PDF
S04 Pre-Proposal Conference - IGAP Phase 5 Presentation.pdf PDF
S06 03 48 21 Precast Concrete Burial Crypts.pdf PDF
S04 Pre-Proposal Conference Attendance Sheet.pdf PDF
S06 PRICE-COST SCHEDULE Attachment.docx DOCX document
S06 A0002 RFI Updated Drawings.pdf PDF
S06 36C10F22R0030 A0002.pdf PDF
S06 23 42 00 Dust Collector.pdf PDF
S06 04 05 16 Masonry Grouting.pdf PDF
S06 23 36 00 Air Terminal Units.pdf PDF
S06 Past Performance Questionnaire 36C10F22R0030.docx DOCX document
S06 36C10F22R0030 A0001..pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 124-151.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Divisions 00-33.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 63-96.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 292-302.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 152-291.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D2.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D5-H.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix A-D1.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 16-23.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D4.pdf PDF
S02 36C10F22R0030 F.pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F22R0030.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 24-39.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D3.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220093.pdf PDF
S02 PAST PERFORMANCE QUESTIONNAIRE SAMPLE.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 40-62.pdf PDF
S02 VAAR 852.219-77 VA Notice of Limitations on Subcontracting - Certificate of Compliance.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 97-123.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220006.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 11-15.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 1-10.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA 813-028 Indiantown Gap National Cemetery AEW Project No. CFM0-004 Phase 5 Development

Addendum 1 06-14

STRUCTURAL STEEL FRAMING

05 12 00 - 1

SECTION 05 12 00

STRUCTURAL STEEL FRAMING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Structural steel shapes, plates, and bars.

2. Structural pipe.

3. Bolts, nuts, and washers.

1.2 RELATED REQUIREMENTS

A. Materials Testing And Inspection During Construction: Section 01 45 29, TESTING LABORATORY SERVICES.

B. Steel Decking: Section 05 31 00, STEEL DECKING.

C. Steel Framing: Section 13 34 19, METAL BUILDING SYSTEMS.

D. Steel Support: Section 10 13 00, DIRECTORIES.

E. Painting: Section 09 91 00, PAINTING.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American Institute of Steel Construction (AISC):

1. AISC Manual - Steel Construction Manual, 14th Ed.

2. 303-10 - Code of Structural Steel Buildings and Bridges.

3. 360-10: Specification for Structural Steel Buildings.

C. The American Society of Mechanical Engineers (ASME):

1. B18.22.1-09 - Washers: Helical Spring-Lock, Tooth Lock, and Plain

Washers.

D. American Welding Society (AWS):

1. D1.1/D1.1M-15 - Structural Welding Code - Steel.

E. ASTM International (ASTM):

1. A6/A6M-14 - General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling.

2. A36/A36M-14 - Carbon Structural Steel.

3. A53/A53M-12 - Pipe, Steel, Black and Hot-Dip, Zinc-Coated, Welded and Seamless.

4. A123/A123M-15 - Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel

Products.

5. A242/A242M-13 - High-Strength Low-Alloy Structural Steel.

Addendum 1 06-14

STRUCTURAL STEEL FRAMING

05 12 00 - 2

6. A283/A283M-13 - Low and Intermediate Tensile Strength Carbon Steel

Plates.

7. A307-14 - Carbon Steel Bolts, Studs, and Threaded Rod 60,000 PSI

Tensile Strength.

8. A500/A500M-13 - Cold-Formed Welded and Seamless Carbon Steel

Structural Tubing and Rounds and Shapes.

9. A501/A501M-14 - Hot-Formed Welded and Seamless Carbon Steel

Structural Tubing and Rounds and Shapes.

10. A572/A572M-15 - High-Strength Low-Alloy Columbium-Vanadium

Structural Steel.

11. A992/A992M-15 - Structural Shapes.

12. F2329/F2329M-15 - Zinc Coating, Hot-Dip, Requirements for

Application to Carbon and Alloy steel Bolts, Screws, washers, Nuts, and Special Threaded Fasteners.

13. F3125/F3125M-15 - Standard Specification for High Strength

Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830

MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength, Inch and

Metric Dimensions

F. Master Painters Institute (MPI):

1. No. 18 - Primer, Zinc Rich, Organic.

G. Military Specifications (Mil. Spec.):

1. MIL-P-21035 - Paint, High Zinc Dust Content, Galvanizing, Repair.

H. Occupational Safety and Health Administration (OSHA):

1. 29 CFR 1926.752(e) - Guidelines For Establishing The Components Of A

Site-Specific Erection Plan.

2. 29 CFR 1926-2001 - Safety Standards for Steel Erection.

I. Research Council on Structural Connections (RCSC) of The Engineering

Foundation:

1. Specification for Structural Joints Using ASTM F3125 Bolts.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and fabrication and installation details.

C. Test Reports: Certify products comply with specifications.

1. Welders' qualifying tests.

Addendum 1 06-14

STRUCTURAL STEEL FRAMING

05 12 00 - 3

D. Certificates: Certify each product complies with specifications.

1. Structural steel.

2. Steel connections.

3. Welding materials.

4. Shop coat primer paint.

E. Qualifications: Substantiate qualifications comply with specifications.

1. Fabricator with project experience list.

2. Installer with project experience list.

3. Welders and welding procedures.

F. Delegated Design Drawings and Calculations: Signed and sealed by responsible Architect/Engineer.

1. Connection calculations.

G. Record Surveys: Signed and sealed by responsible surveyor or engineer.

1.5 QUALITY ASSURANCE

A. Fabricator Qualifications: AISC Quality Certification participant designated as AISC Certified Plant, Category STD.

1. Regularly fabricates specified products.

2. Fabricated specified products with satisfactory service on five similar installations for minimum five years.

a. Project Experience List: Provide contact names and addresses for completed projects.

B. Installer Qualifications: AISC Quality Certification Program participant designated as AISC-Certified Erector, Category ACSE.

1. Regularly installs specified products.

2. Installed specified products with satisfactory service on five similar installations for minimum five years.

a. Project Experience List: Provide contact names and addresses for completed projects.

C. Before commencement of Work, ensure steel erector provides written notification required by OSHA 29 CFR 1926.752(e). Submit a copy of the notification to Contracting Officer's Representative.

D. Welders and Welding Procedures Qualifications: AWS D1.1/D1.1M.

1.6 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

Addendum 1 06-14

STRUCTURAL STEEL FRAMING

05 12 00 - 4

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

A. Delegated Design: Prepare submittal documents including design calculations and drawings signed and sealed by registered design professional, licensed in state where project is located.

B. Design structural steel framing connections complying with specified performance:

1. Load Capacity: Resist loads indicated on drawings. Account for connection and member loads and eccentricities.

a. Request additional design criteria when necessary to complete connection design.

2. Configuration: Design and detail all connections for each member size, steel grade and connection type to resist the loads and reactions indicated on the drawings or specified herein. Use details consistent with details shown on drawings, supplementing where necessary. The details shown on drawings are conceptual and do not indicate the required weld sizes or number of bolts unless specifically noted. Use rational engineering design and standard practice in detailing, accounting for all loads and eccentricities in both the connection and the members. Promptly notify the

Contracting Officer Representative of any location where the connection design criteria is not clearly indicated. The design of all connections is subject to the review and acceptance of the

Contracting Officer's Representative. Submit structural calculations prepared and sealed by a qualified engineer registered in the state where the project is located. Submit calculations for review before preparation of detail drawings.

2.2 MATERIALS

A. W-Shapes:

1. ASTM A992/A992M.

B. Channel and Angles:

1. ASTM A36/A36M.

C. Plates and Bars:

1. ASTM A36/A36M.

D. Hollow Structural Sections:

Addendum 1 06-14

STRUCTURAL STEEL FRAMING

05 12 00 - 5

1. ASTM A500/A500M.

2. ASTM A501/A501M.

E. Structural Pipe: ASTM A53/A53M, Grade B.

F. Bolts, Nuts and Washers: Galvanized for galvanized framing and plain finish for other framing.

1. High-strength bolts, including nuts and washers: ASTM F3125.

2. Bolts and nuts, other than high-strength: ASTM A307, Grade A.

3. Plain washers, other than those in contact with high-strength bolt heads and nuts: ASME B18.22.1.

G. Welding Materials: AWS D1.1, type to suit application.

2.3 PRODUCTS - GENERAL

A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.

2.4 FABRICATION

A. Fabricate structural steel according to Chapter M, AISC 360.

B. Shop and Field Connections:

1. Weld connections according to AWS D1.1/D1.1M. Welds shall be made only by welders and welding operators who have been previously qualified by tests as prescribed in AWS D1.1 to perform type of work required.

2. High-Strength Bolts: High-strength bolts tightened to a bolt tension minimum 70 percent of their minimum tensile strength. Tightening done with properly calibrated wrenches, by turn-of-nut method or by use of direct tension indicators (bolts or washers). Tighten bolts in connections identified as slip-critical using Direct Tension

Indicators. Twist-off torque bolts are not an acceptable alternate fastener for slip critical connections.

2.5 FINISHES

A. Shop Priming:

1. Prime paint structural steel according to AISC 303, Section 6.

a. Interstitial Space Structural Steel: Prime paint, unless indicated to receive sprayed on fireproofing.

B. Shop Finish Painting: Apply primer and finish paint as specified in

Section 09 91 00, PAINTING.

C. Do not paint:

1. Surfaces within 50 mm (2 inches) of field welded joints.

Addendum 1 06-14

STRUCTURAL STEEL FRAMING

05 12 00 - 6

2. Surfaces indicated to be encased in concrete.

3. Surfaces receiving sprayed on fireproofing.

4. Beam top flanges receiving shear connector studs applied.

D. Structural Steel Galvanizing: ASTM A123/A123M, hot dipped, after fabrication. Touch-up after erection: Clean and wire brush any abraded and other spots worn through zinc coating, including threaded portions of bolts and welds and touch-up with galvanizing repair paint.

1. Galvanize structural steel framing installed at exterior locations.

E. Bolts, Nuts, and Washers Galvanizing: ASTM F2329, hot-dipped.

2.6 ACCESSORIES

A. General: Shop paint steel according to AISC 303, Section 6.

B. Finish Paint System: Primer and finish as specified in Section

09 91 00, PAINTING.

C. Galvanizing Repair Paint: MPI No. 18.

PART 3 - EXECUTION

3.1 ERECTION

A. Erect structural steel according to AISC 303 and AISC 360.

B. Set structural steel accurately at locations and elevations indicated on drawings.

C. Maintain erection tolerances of structural steel within AISC 303 requirements.

1. Pour Stop Elevation Tolerance: 6 mm (1/4 inch), maximum, before concrete placement.

D. Weld and bolt connections as specified for shop connections.

3.2 FIELD PAINTING

A. After welding, clean and prime weld areas to match adjacent finish.

B. Touch-up primer damaged by construction operations.

C. Apply galvanizing repair paint to galvanized coatings damaged by construction operations.

D. Finish Painting: As specified in Section 09 91 00, PAINTING.

3.3 FIELD QUALITY CONTROL

A. Record Survey:

Addendum 1 06-14

STRUCTURAL STEEL FRAMING

05 12 00 - 7

1. Engage registered land surveyor or registered civil engineer as specified in Section 01 00 00, GENERAL REQUIREMENTS to perform survey.

2. Measure and record structural steel framing plumbness, level, and alignment after completing bolting and welding and before installation of work supported by structural steel.

3. Identify deviations from allowable tolerances specified in

AISC Manual.

- - E N D - -

PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1.2 RELATED REQUIREMENTS
A. Materials Testing And Inspection During Construction: Section 01 45 29, TESTING LABORATORY SERVICES.
B. Steel Decking: Section 05 31 00, STEEL DECKING.
C. Steel Framing: Section 13 34 19, METAL BUILDING SYSTEMS.
D. Steel Support: Section 10 13 00, DIRECTORIES.
E. Painting: Section 09 91 00, PAINTING.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American Institute of Steel Construction (AISC):
C. The American Society of Mechanical Engineers (ASME):
D. American Welding Society (AWS):
E. ASTM International (ASTM):
F. Master Painters Institute (MPI):
G. Military Specifications (Mil. Spec.):
H. Occupational Safety and Health Administration (OSHA):
I. Research Council on Structural Connections (RCSC) of The Engineering Foundation:
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
C. Test Reports: Certify products comply with specifications.
D. Certificates: Certify each product complies with specifications.
E. Qualifications: Substantiate qualifications comply with specifications.
F. Delegated Design Drawings and Calculations: Signed and sealed by responsible Architect/Engineer.
G. Record Surveys: Signed and sealed by responsible surveyor or engineer.
1.5 QUALITY ASSURANCE
A. Fabricator Qualifications: AISC Quality Certification participant designated as AISC Certified Plant, Category STD.
B. Installer Qualifications: AISC Quality Certification Program participant designated as AISC�Certified Erector, Category ACSE.
C. Before commencement of Work, ensure steel erector provides written notification required by OSHA 29 CFR 1926.752(e). Submit a copy of the notification to Contracting Officer's Representative.
D. Welders and Welding Procedures Qualifications: AWS D1.1/D1.1M.
1.6 WARRANTY
A. Construction Warranty: FAR clause 52.246�21, "Warranty of Construction."
PART 2 - PRODUCTS
2.1 SYSTEM PERFORMANCE
A. Delegated Design: Prepare submittal documents including design calculations and drawings signed and sealed by registered design professional, licensed in state where project is located.
B. Design structural steel framing connections complying with specified performance:
2.2 MATERIALS
A. W�Shapes:
B. Channel and Angles:
C. Plates and Bars:
D. Hollow Structural Sections:
E. Structural Pipe: ASTM A53/A53M, Grade B.
F. Bolts, Nuts and Washers: Galvanized for galvanized framing and plain finish for other framing.
G. Welding Materials: AWS D1.1, type to suit application.
2.3 PRODUCTS - GENERAL
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
2.4 FABRICATION
A. Fabricate structural steel according to Chapter M, AISC 360.
B. Shop and Field Connections:
2.5 FINISHES
A. Shop Priming:
B. Shop Finish Painting: Apply primer and finish paint as specified in Section 09 91 00, PAINTING.
C. Do not paint:
D. Structural Steel Galvanizing: ASTM A123/A123M, hot dipped, after fabrication. Touch�up after erection: Clean and wire brush any abraded and other spots worn through zinc coating, including threaded portions of bolts and welds and touch�up with galvanizing repair paint.
E. Bolts, Nuts, and Washers Galvanizing: ASTM F2329, hot�dipped.
2.6 ACCESSORIES
A. General: Shop paint steel according to AISC 303, Section 6.
B. Finish Paint System: Primer and finish as specified in Section 09 91 00, PAINTING.
C. Galvanizing Repair Paint: MPI No. 18.
PART 3 - EXECUTION
3.1 ERECTION
A. Erect structural steel according to AISC 303 and AISC 360.
B. Set structural steel accurately at locations and elevations indicated on drawings.
C. Maintain erection tolerances of structural steel within AISC 303 requirements.
D. Weld and bolt connections as specified for shop connections.
3.2 FIELD PAINTING
A. After welding, clean and prime weld areas to match adjacent finish.
B. Touch�up primer damaged by construction operations.
C. Apply galvanizing repair paint to galvanized coatings damaged by construction operations.
D. Finish Painting: As specified in Section 09 91 00, PAINTING.
3.3 FIELD QUALITY CONTROL
A. Record Survey: