36C10F22R0030 | A0003
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0003 05-16-2022 813-028
36C10F
Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 425 I Street NW Washington DC 20001
36C10F
Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 425 I Street NW Washington DC 20001
To all Offerors/Bidders 36C10F22R0030
04-21-2022 X
X X
May 25, 2022, by 3:00 PM ET.
X 1
The purpose of Amendment 0003 is to provide response to RFI questions and extend the proposal due date, as follows:
a) Proposal due date is changed from May 23, 2022, to read May 25, 2022, by 3:00 PM ET.
b) See continuation page for response to RFI questions.
All other terms and conditions will remain unchanged.
Catalin M. Parfenti
VACOParfeC Highlight
CONTINUATION PAGE
b) Provide VA responses (in Blue) to Pre-Proposal Inquiries/RFIs as follows:
SOLICITATION NUMBER 36C10F22R0030
PRE- PROPOSAL INQUIRY (PPI) FORM
INDIANTOWN GAP NATIONAL CEMETERY | PHASE 5 EXPANSION DEVELOPMENT
RFI
No.
Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE in BLUE
1. G-E101 - G-E103
Can the power feed from the existing maintenance building to the satellite maintenance building and pump house be directionally bored?
The duct bank as shown on sheets G- E101 – G-E105 is to be concrete encased per detail number 3 on E801.
Directional boring is not permitted.
2. G-E101 - G-E103
Old Cumberland Street is a heavily wooded on both sides of the road. This work will require both clearing, grading and E&S. There aren’t any civil drawings associated with this scope.
Please provide drawings/details.
The electrical site plans (G-E101 – G- E105), E&S (G204 and G207), and landscape (L-100 – L-107) drawings have been updated to address the work required for installation of the concrete encased conduit along Old Cumberland Street.
3. RFI #79
The answer to RFI # 79 States that all fill material for the in-ground cremains and traditional sections to be screened.
What is the specification (Maximum size) for the screened material? What is the maximum size material for the topsoil?
Screened fill is only required should the on site excavated material fail to meet the requirements of specification 32 20 00, 2.2 Materials, B Fills.
Topsoil shall meet the requirements of specification 32 90 00, 2.5. If materials meeting this requirement are available from stripped on site material, screening is not required.
4. RFI #96
RFI #96 clarifies the Oil/ Water separator as a 500-gal fiberglass tank.
Is this to be used as the oil/water separator shown on drawing CS104 as structure # 93? This looks like a manhole, bur profile on sheet CU262 indicates this as an oil/water separator.
Please clarify that this 500-gal fiberglass tank is the structure labeled #93?
(There is a 15” RCP and 24” RCP into this structure and a 24” discharge and shows this as 11.6’ deep)
Structure #93 is a hydrodynamic oil/water separator per detail 9 on attached sheet DT506. The detail has been updated and is no longer in conflict with the proposed invert and rim elevations as shown on the profile. The sand and oil interceptor next to the proposed wash bay within the existing maintenance yard shall be in accordance with the 500 Gal fiber glass tank as specified in the specifications.
5. CS106
Drawing CS106 shows a sand and oil interceptor next to the wash bay. Is this the 500-Gal fiberglass tank specified in section 22 13 00, 2.7.B?
The sand and oil interceptor next to the proposed wash bay within the existing maintenance yard shall be in accordance with the 500 Gal fiber glass tank as specified in the specifications.
ATTACHMENTS:
See attached document: S06 A0003 RFI Updated Drawings.
All other terms and conditions will remain unchanged.
--- End ---