S05 ALL A0003 RFIs Complete .docx

DOCX document 17 KB Posted

Attached to
Indiantown Gap National Cemetery | Phase 5 Expansion Development
Solicitation number
36C10F22R0030
Issued by

View the file

Other files

File Type Posted
S06 A0003 RFI Updated Drawings.pdf PDF
S06 36C10F22R0030 A0003.pdf PDF
S04 Pre-Proposal Conference - IGAP Phase 5 Presentation.pdf PDF
S06 03 48 21 Precast Concrete Burial Crypts.pdf PDF
S04 Pre-Proposal Conference Attendance Sheet.pdf PDF
S06 PRICE-COST SCHEDULE Attachment.docx DOCX document
S06 A0002 RFI Updated Drawings.pdf PDF
S06 36C10F22R0030 A0002.pdf PDF
S06 23 42 00 Dust Collector.pdf PDF
S06 04 05 16 Masonry Grouting.pdf PDF
S06 05 12 00 Structural Steel Framing.pdf PDF
S06 23 36 00 Air Terminal Units.pdf PDF
S06 Past Performance Questionnaire 36C10F22R0030.docx DOCX document
S06 36C10F22R0030 A0001..pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 124-151.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Divisions 00-33.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 63-96.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 292-302.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 152-291.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D2.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D5-H.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix A-D1.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 16-23.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D4.pdf PDF
S02 36C10F22R0030 F.pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F22R0030.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 24-39.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D3.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220093.pdf PDF
S02 PAST PERFORMANCE QUESTIONNAIRE SAMPLE.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 40-62.pdf PDF
S02 VAAR 852.219-77 VA Notice of Limitations on Subcontracting - Certificate of Compliance.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 97-123.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220006.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 11-15.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 1-10.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER 36C10F22R0030

PRE- PROPOSAL INQUIRY (PPI) FORM

INDIANTOWN GAP NATIONAL CEMETERY | PHASE 5 EXPANSION DEVELOPMENT

RFI No.
Reference (Sect/Para/Page)
QUESTION
GOVERNMENT RESPONSE

in BLUE

1.
G-E101 - G-E103
Can the power feed from the existing maintenance building to the satellite maintenance building and pump house be directionally bored?
The duct bank as shown on sheets G-E101 – G-E105 is to be concrete encased per detail number 3 on E801. Directional boring is not permitted.
2.
G-E101 - G-E103
Old Cumberland Street is a heavily wooded on both sides of the road. This work will require both clearing, grading and E&S. There aren’t any civil drawings associated with this scope. Please provide drawings/details.
The electrical site plans (G-E101 – G-E105), E&S (G204 and G207), and landscape (L-100 – L-107) drawings have been updated to address the work required for installation of the concrete encased conduit along Old Cumberland Street.
3.
RFI #79
The answer to RFI # 79 States that all fill material for the in-ground cremains and traditional sections to be screened. What is the specification (Maximum size) for the screened material? What is the maximum size material for the topsoil?

Screened fill is only required should the on site excavated material fail to meet the requirements of specification 32 20 00, 2.2 Materials, B Fills.

Topsoil shall meet the requirements of specification 32 90 00, 2.5. If materials meeting this requirement be available from stripped on site, material screening is not required.

4.
RFI #96
RFI #96 clarifies the Oil/ Water separator as a 500-gal fiberglass tank. Is this to be used as the oil/water separator shown on drawing CS104 as structure # 93? This looks like a manhole, bur profile on sheet CU262 indicates this as an oil/water separator. Please clarify that this 500-gal fiberglass tank is the structure labeled #93? (There is a 15” RCP and 24” RCP into this structure and a 24” discharge and shows this as 11.6’ deep)
Structure #93 is a hydrodynamic oil/water separator per detail 9 on attached sheet DT506. The detail has been updated and is no longer in conflict with the proposed invert and rim elevations as shown on the profile. The sand and oil interceptor next to the proposed wash bay within the existing maintenance yard shall be in accordance with the 500 Gal fiber glass tank as specified in the specifications.
5.
CS106
Drawing CS106 shows a sand and oil interceptor next to the wash bay. Is this the 500-Gal fiberglass tank specified in section 22 13 00, 2.7.B?
The sand and oil interceptor next to the proposed wash bay within the existing maintenance yard shall be in accordance with the 500 Gal fiber glass tank as specified in the specifications.