S06 Past Performance Questionnaire 36C10F22R0030.docx

DOCX document 22 KB Posted

Attached to
Indiantown Gap National Cemetery | Phase 5 Expansion Development
Solicitation number
36C10F22R0030
Issued by

View the file

Other files

File Type Posted
S06 A0003 RFI Updated Drawings.pdf PDF
S05 ALL A0003 RFIs Complete .docx DOCX document
S06 36C10F22R0030 A0003.pdf PDF
S04 Pre-Proposal Conference - IGAP Phase 5 Presentation.pdf PDF
S06 03 48 21 Precast Concrete Burial Crypts.pdf PDF
S04 Pre-Proposal Conference Attendance Sheet.pdf PDF
S06 PRICE-COST SCHEDULE Attachment.docx DOCX document
S06 A0002 RFI Updated Drawings.pdf PDF
S06 36C10F22R0030 A0002.pdf PDF
S06 23 42 00 Dust Collector.pdf PDF
S06 04 05 16 Masonry Grouting.pdf PDF
S06 05 12 00 Structural Steel Framing.pdf PDF
S06 23 36 00 Air Terminal Units.pdf PDF
S06 36C10F22R0030 A0001..pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 124-151.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Divisions 00-33.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 63-96.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 292-302.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 152-291.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D2.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D5-H.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix A-D1.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 16-23.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D4.pdf PDF
S02 36C10F22R0030 F.pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F22R0030.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 24-39.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D3.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220093.pdf PDF
S02 PAST PERFORMANCE QUESTIONNAIRE SAMPLE.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 40-62.pdf PDF
S02 VAAR 852.219-77 VA Notice of Limitations on Subcontracting - Certificate of Compliance.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 97-123.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220006.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 11-15.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 1-10.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indiantown Gap National Cemetery | Phase 5 Expansion Development | 36C10F22R0030

PAST PERFORMANCE QUESTIONNAIRE FOR 36C10F22R0030

Your assistance is requested in support of a source selection for this solicitation.

Please complete this Questionnaire and return it via email to:

Marcel Parfenti, Contracting Officer (catalin.parfenti@va.gov) Response Due Date: NLT May 23, 2022, by 3:00 PM ET In the subject line of any e-mail sent, please identify IGAP Phase 5 | 36C10F22R0030

When complete, the information on this form is SOURCE SELECTION SENSITIVE INFORMATION (41 U.S.C. 423) and shall be protected accordingly.

TO BE COMPLETED BY OFFEROR

1a. CONTRACTOR NAME & ADDRESS:

2. CONTRACT NO.:

3. CONTRACT AWARD DATE:

4. COMPLETION DATE:

5. CONTRACT VALUE (with options): $

1b. NAME OF PRIME CONTRACTOR (If this questionnaire is for a team member)

6. TYPE OF CONTRACT:

7. PROJECT TITLE, LOCATION, AND DESCRIPTION (AND TOTAL CONSTRUCTION VALUE AT PROJECT COMPLETION):

Please add a continuation page if additional space necessary.

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE

8. EVALUATION:

a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER:

c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.

E = Exceptional
S = Satisfactory
U = Unacceptable
G = Very Good
M = Marginal
N/O = Not Observed

A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

E G S M U N/O

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

E G S M U N/O

C. Schedule – Assess the timeliness of contractor against the schedule of activities.

E G S M U N/O

D. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

E G S M U N/O

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

E G S M U N/O

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”.

E G S M U N/O

G. Overall Assessment.

E G S M U N/O

Please provide Comments to support the ratings above: (for any ratings of E, G, M, or U, please provide some brief comments about strengths & weaknesses you observed in this contractor that help us understand your rating. Feel free to provide additional pages if necessary):

Signature:

File details come from the government source that posted it. Updated .