S02 VA813-028 IGNC Phase 5 Drawing_Sheets 1-10.pdf

PDF 34 MB Posted

Attached to
Indiantown Gap National Cemetery | Phase 5 Expansion Development
Solicitation number
36C10F22R0030
Issued by

View the file

Other files

File Type Posted
S06 A0003 RFI Updated Drawings.pdf PDF
S05 ALL A0003 RFIs Complete .docx DOCX document
S06 36C10F22R0030 A0003.pdf PDF
S04 Pre-Proposal Conference - IGAP Phase 5 Presentation.pdf PDF
S06 03 48 21 Precast Concrete Burial Crypts.pdf PDF
S04 Pre-Proposal Conference Attendance Sheet.pdf PDF
S06 PRICE-COST SCHEDULE Attachment.docx DOCX document
S06 A0002 RFI Updated Drawings.pdf PDF
S06 36C10F22R0030 A0002.pdf PDF
S06 23 42 00 Dust Collector.pdf PDF
S06 04 05 16 Masonry Grouting.pdf PDF
S06 05 12 00 Structural Steel Framing.pdf PDF
S06 23 36 00 Air Terminal Units.pdf PDF
S06 Past Performance Questionnaire 36C10F22R0030.docx DOCX document
S06 36C10F22R0030 A0001..pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 124-151.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Divisions 00-33.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 63-96.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 292-302.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 152-291.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D2.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D5-H.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix A-D1.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 16-23.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D4.pdf PDF
S02 36C10F22R0030 F.pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F22R0030.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 24-39.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D3.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220093.pdf PDF
S02 PAST PERFORMANCE QUESTIONNAIRE SAMPLE.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 40-62.pdf PDF
S02 VAAR 852.219-77 VA Notice of Limitations on Subcontracting - Certificate of Compliance.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 97-123.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220006.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 11-15.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CASKET PLOTS CREMAIN PLOTS

PRE-PLACED

DOUBLE-DEPTH

CRYPTS (3'x8')

PRE-PLACED

OVERSIZED

CRYPTS (4'x10')

TRADITIONAL

BURIAL SITES

(4'x10')

IN-GROUND

CREMAIN SITES

(3'x3')

COLUMBARIUM

NICHES

TOTAL NUMBER

OF GRAVESITES

5,122 208 598 4,020 6,000 15,948

GRAVESITE YIELD SUMMARY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street

Sewickley, PA

Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AE WORKS®

B

IM

/C F

M -0

I G

A P

/C F

M -0

I G

A P

A

R C

H

L in k e d

M o d e l.

rv t

/1

/2

:0

:5

P

M

G001

COVER SHEET INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 RS AC

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

INDIANTOWN GAP NATIONAL CEMETERY

PHASE 5 DEVELOPMENT

RFP DOCUMENTS SUBMISSION

VA PROJECT NUMBER 813-028

LEBANON COUNTY, PENNSYLVANIA

PROJECT DIRECTORY

OWNER:

DEPARTMENT OF

VETERANS AFFAIRS

NATIONAL CEMETERY

ADMINISTRATION

WASHINGTON, DC 20420

(561) 441-4039

ARCHITECT/ENGINEER:

AE WORKS, LTD

418 BEAVER STREET

SEWICKLEY, PA 15143

(412) 287-7333

LANDSCAPE ARCHITECT/

MASTER PLANNER:

THE LA GROUP

40 LONG ALLEY

SARATOGA SPRINGS, NY

12866

(518) 587-8100 X233

VICINITY MAP

LOCATION MAP

CONTACT: TIFFANY HAILE

CONTACT: DAVID MARTINO

CONTACT: JOE SPORKO

CIVIL ENGINEER:

INTEGRITY FEDERAL SERVICES

148 S. QUEEN STREET, SUITE 201

MARTINSBURG, WV

25401

(304) 725-8456

CONTACT: JASON GERHART

GEOTECHNICAL

ENGINEER:

PENNONI

5072 RITTER RD.

SUITE 102

MECHANICSBURG, PA

17055

(717) 620-5925

CONTACT: TODD STAGER

IRRIGATION:

AQUA ENGINEERING

375 EAST HORSETOOTH RD.

BLDG. 2-202

FORT COLLINS, CO 80525

(970) 372-6104

CONTACT: BOB BECCARD

SURVEYING AND

STORMWATER DESIGN:

HONOR ENGINEER COMPANY

1100 N. MOUNTAIN RD. SUITE 1

HARRISBURG, PA

(717) 533-9077

CONTACT: JARED

HOCKENBERRY

JIM HARTMAN (SURVEYING)

NATURAL RESOURCES:

MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET,

SUITE 4100

STONEHAM, MA 02180

(781) 275-6050 EXT 401

CONTACT: ANDREW

GLUCKSMAN

COMMISSIONING:

COMMANDER'S CONCEPTS

1173 RESEARCH WAY

FOREST, VA 24551

(713) 492-1922

CONTACT:

RICHARD DIDDAMS

U.S. Department of Veterans Affairs

U.S. Department of Veterans Affairs

STRUCTURAL ENGINEER:

BARBER & HOFFMAN, INC.

1659 PA-228

CRANBERRY TOWNSHIP, PA 16066

(724) 740848

CONTACT: MIKE MILLER

# Revisions Date

AE WORKS®

2/18/22

DWG 1 of 302

2/27/2022

02.18.22

02.18.22

02-18-2022

February 18, 2022

REGISTERED

AI

N A

VYS

N

N E

P

L

C O

M

M

O NWEALT

H O

F

PROFESSIONAL

WILLIAM DURYEA CAMERON

No. PE37283E

ENGINEER

PENNONI ASSOCIATES INC.

February 18, 2022

PENNONI ASSOCIATES, INC.

PENNONI ASSOCIATES, INC.

23-FEB-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street

Sewickley, PA

Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AE WORKS®

B

IM

/C F

M -0

I G

A P

/C F

M -0

I G

A P

A

R C

H

L in k e d

M o d e l.

rv t

/1

/2

:4

:1

P

M

G002

SHEET INDEX INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 RS AC

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

GENERAL

G001 COVER SHEET

G002 SHEET INDEX

G003 PERMIT MATRIX

SITE/CIVIL

CI707 COLUMBARIUM ELEVATIONS 7

CI708 COLUMBARIUM ELEVATIONS 8

CI709 COLUMBARIUM SECTION DETAILS

CI710 COLUMBARIUM DETAILS

CI711 COLUMBARIUM STONE DETAIL

CI712 COLUMBARIUM STONE CAP DETAILS 1

CI713 COLUMBARIUM STONE CAP DETAILS 2

CI714 COLUMBARIUM DRIP STRIP AND UNDER DRAIN DETAILS

GS100 GNSS - PLANS

SITE/CIVIL

GI002 CIVIL NOTES, LEGEND, AND ABBREVIATIONS

GI010 OVERALL CEMETERY PROPERTY PLAN

VL100 OVERALL EXISTING CONDITIONS PLAN

GI100 OVERALL SITE DEVELOPMENT PLAN - BASE BID

GI110 OVERALL SITE DEVELOPMENT PLAN - ADD ALTERNATES

GI201 CONSTRUCTION SEQUENCING PLAN - PHASE I MOT PLAN

GI202 PHASE 2 MOT PLAN

GI203 PHASE 3 MOT PLAN

GI204 PHASE 4 MOT PLAN

GI205 PHASE 5 MOT PLAN

BI100 BORING/TEST PIT LOCATION PLAN

BI101 BORING AND TEST PIT LOGS

BI102 BORING AND TEST PIT LOGS

BI103 BORING AND TEST PIT LOGS

BI104 BORING AND TEST PIT LOGS

CD100 OVERALL SITE DEMOLITION PLAN

CD101 HONOR GUARD AND MAIN ENTRY DEMOLITION PLAN

CD102 MAINTENANCE UTILITIES DEMOLITION PLAN

GC010 TEMPORARY CONSTRUCTION FENCING PLAN AREA 1

GC011 TEMPORARY CONSTRUCTION FENCING PLAN AREA 2

GC100 OVERALL E&S CONTROL KEY PLAN - STAGE I

GC101 E&S CONTROL PLAN STAGE I AREA 1

GC102 E&S CONTROL PLAN STAGE I AREA 2

GC103 E&S CONTROL PLAN STAGE I AREA 3

GC200 OVERALL E&S CONTROL KEY PLAN - STAGE II

GC201 E&S CONTROL PLAN STAGE II AREA 1

GC202 E&S CONTROL PLAN STAGE II AREA 2

GC203 E&S CONTROL PLAN STAGE II AREA 3

GC204 E&S CONTROL PLAN STAGE II AREA 4

GC205 E&S CONTROL PLAN STAGE II AREA 5

GC206 E&S CONTROL PLAN STAGE II AREA 6

GC207 E&S CONTROL PLAN STAGE II AREA 7

GC208 E&S CONTROL PLAN STAGE II AREA 8

GC209 E&S CONTROL PLAN STAGE II AREA 9

GC500 EROSION AND SEDIMENT CONTROL NOTES

GC501 EROSION AND SEDIMENT CONTROL DETAILS

GC502 EROSION AND SEDIMENT CONTROL DETAILS

CS100 OVERALL SITE KEY MAP

CS101 SITE LAYOUT AND UTILITY PLAN AREA 1

CS102 SITE LAYOUT AND UTILITY PLAN AREA 2

CS103 SITE LAYOUT AND UTILITY PLAN AREA 3

CS104 SITE LAYOUT AND UTILITY PLAN AREA 4

CS105 SITE LAYOUT AND UTILITY PLAN AREA 5

CS106 SITE LAYOUT AND UTILITY PLAN AREA 6

CS107 SITE LAYOUT AND UTILITY PLAN AREA 7

CS110 BURIAL SECTION NUMBERING PLAN SECTION 56

CS111 BURIAL SECTION NUMBERING PLAN SECTION 57

CS112 BURIAL SECTION NUMBERING PLAN SECTION 58

CS113 BURIAL SECTION NUMBERING PLAN SECTION 59

CS114 BURIAL SECTION NUMBERING PLAN SECTION 60 & 61

CS401 COLUMBARIUM LAYOUT ENLARGEMENT PLAN

CS402 ENTRY WALL LAYOUT ENLARGEMENT PLAN

CT100 OVERALL PAVEMENT REPAIR AND REPLACEMENT PLAN

CT101 PAVEMENT REPAIR AND REPLACEMENT PLAN 1

CT102 PAVEMENT REPAIR AND REPLACEMENT PLAN 2

CT103 PAVEMENT REPAIR AND REPLACEMENT PLAN 3

CT104 PAVEMENT REPAIR AND REPLACEMENT PLAN 4

CG100 OVERALL GRADING AND DRAINAGE PLAN

CG101 GRADING AND DRAINAGE PLAN AREA 1

CG102 GRADING AND DRAINAGE PLAN AREA 2

CG103 GRADING AND DRAINAGE PLAN AREA 3

CG104 GRADING AND DRAINAGE PLAN AREA 4

CG105 GRADING AND DRAINAGE PLAN AREA 5

CG106 GRADING AND DRAINAGE PLAN AREA 6 AND 7

CG110 BURIAL SECTION GRADING ENLARGEMENT SECTION 56

CG111 BURIAL SECTION GRADING ENLARGEMENT SECTION 57

CG112 BURIAL SECTION GRADING ENLARGEMENT SECTION 58

CG113 BURIAL SECTION GRADING ENLARGEMENT SECTION 59

CG114 BURIAL SECTION GRADING ENLARGEMENT SECTION 60 & 61

CG150 GRADING AND DRAINAGE PLAN (WITHOUT ADD ALT #4)

CG260 STREAM CULVERT CROSSING PLAN AND PROFILE

CG401 COLUMBARIUM GRADING ENLARGEMENT PLAN

CG402 COLUMBARIUM DRAINAGE ENLARGEMENT PLAN

CT201 ROAD PROFILES

CT202 ROAD PROFILES

CT203 ROAD PROFILES

CT500 TYPICAL ROAD CROSS SECTIONS

CT501 TYPICAL ROAD CROSS SECTIONS

CU204 LOW PRESSURE SEWER LATERAL PLAN AND PROFILES

CU231 WATER PLAN AND PROFILES

CU260 STORM PROFILES

CU261 STORM PROFILES

CU262 STORM PROFILES

CU265 STORM COMPUTATIONS

CJ100 PRE-DEVELOPMENT WATERSHED MAP

CJ101 PRE-DEVELOPMENT STORMWATER ANALYSIS PLAN AREA 1

CJ102 PRE-DEVELOPMENT STORMWATER ANALYSIS PLAN AREA 2

CJ200 POST-CONSTRUCTION WATERSHED MAP

CJ201 POST-CONSTRUCTION WATERSHED ANALYSIS PLAN AREA 1

CJ202 POST-CONSTRUCTION WATERSHED ANALYSIS PLAN AREA 2

CJ203 POST-CONSTRUCTION WATERSHED ANALYSIS PLAN AREA 3

CJ204 OUTLET PIPE PROFILES

CJ500 SWM NOTES AND DETAILS

CJ501 SWM DETAILS

DT500 PRE-PLACED CRYPT DETAILS

DT501 PRE-PLACED CRYPT DETAILS

DT502 SITE DETAILS

DT503 SITE DETAILS

DT504 SITE DETAILS

DT505 SITE DETAILS

DT506 SITE DETAILS

DT507 SITE DETAILS

DT508 SITE DETAILS

DT509 SITE DETAILS

CI100 OVERALL SITE FURNISHINGS & SIGNAGE KEY PLAN

CI101 SITE FURNISHINGS & SIGNAGE PLAN AREA 1

CI102 SITE FURNISHINGS & SIGNAGE PLAN AREA 2

CI103 SITE FURNISHINGS & SIGNAGE PLAN AREA 3

CI104 SITE FURNISHINGS & SIGNAGE PLAN AREA 4

CI500 SITE FURNISHINGS DETAILS 1

CI501 SITE FURNISHINGS DETAILS 2

CI502 SITE FURNISHINGS DETAILS 3

CI510 SITE SIGNAGE DETAILS 1

CI511 SITE SIGNAGE DETAILS 2

CI512 CONSTRUCTION SIGNAGE DETAILS

CI600 SITE FURNISHINGS AND SIGNAGE SCHEDULES

CI700 COLUMBARIUM NUMBERING PLAN AND ELEVATIONS

CI701 COLUMBARIUM ELEVATIONS 1

CI702 COLUMBARIUM ELEVATIONS 2

CI703 COLUMBARIUM ELEVATIONS 3

CI704 COLUMBARIUM ELEVATIONS 4

CI705 COLUMBARIUM ELEVATIONS 5

CI706 COLUMBARIUM ELEVATIONS 6

LANDSCAPING

L-100 OVERALL LANDSCAPE PLAN

L-101 AREA 1 LANDSCAPE PLAN

L-102 AREA 2 LANDSCAPE PLAN

L-103 AREA 3 LANDSCAPE PLAN

L-104 AREA 4 LANDSCAPE PLAN

L-105 AREA 5 AND 6 LANDSCAPE PLAN

L-106 AREA 1 AND 2 PLANTING PLAN

L-107 AREA 7 AND 8 PLANTING PLAN

L-501 LANDSCAPE NOTES AND DETAILS

L-502 ENTRY WALL DETAILS 1

L-503 ENTRY WALL DETAILS 2

L-700 COLUMBARIUM CAP RESTORATION LOCATION MAP, DETAILS

AND NOTES

L-703 PHASE 4 RECORD DRAWING - COLUMBARIUM COMPLEX A & B

ELEVATIONS 1

L-704 PHASE 4 RECORD DRAWING - COLUMBARIUM COMPLEX A & B

ELEVATIONS 2

L-705 PHASE 4 RECORD DRAWING - COLUMBARIUM COMPLEX A & B

ELEVATIONS 3

L-706 PHASE 4 RECORD DRAWING - COLUMBARIUM COMPLEX C

ELEVATIONS 1

L-707 PHASE 4 RECORD DRAWING - COLUMBARIUM COMPLEX C

ELEVATIONS 2

L-713 PHASE 4 RECORD DRAWING - STONE VENEER SCHEDULE 1

IRRIGATION

LI001 IRRIGATION NOTES AND LEGEND

LI101 IRRIGATION PLAN 1

LI102 IRRIGATION PLAN 1

LI103 IRRIGATION PLAN 2

LI104 IRRIGATION PLAN 2

LI105 IRRIGATION PLAN 3

LI106 IRRIGATION PLAN 4

LI107 IRRIGATION PLAN 5

LI501 IRRIGATION DETAILS 1

LI502 IRRIGATION DETAILS 2

LI503 IRRIGATION DETAILS 3

LI504 IRRIGATION PUMP STATION

LI505 IRRIGATION WELL PUMP

LI506 IRRIGATION POND AERATION

ARCHITECTURE

A001 ARCHITECTURAL ABBREVIATIONS, NOTES, FINISH LEGEND AND SYMBOLS

B-A101 BULK SOIL STORAGE - PLANS AND ELEVATIONS

B-A310 BULK SOIL STORAGE - WALL SECTION AND DETAILS

E-G101 ENCLOSED STORAGE BUILDING - LIFE SAFETY PLAN

E-A101 ENCLOSED STORAGE BUILDING - PLANS

E-A201 ENCLOSED STORAGE BUILDING - ELEVATIONS

E-A301 ENCLOSED STORAGE BUILDING - BUILDING & WALL SECTIONS

E-A501 ENCLOSED STORAGE BUILDING - DETAILS

H-G101 HONOR GUARD BUILDING - LIFE SAFETY PLAN

H-AD101 HONOR GUARD BUILDING - DEMOLITION PLAN

H-A101 HONOR GUARD BUILDING - FLOOR PLAN, REFLECTED CEILING PLAN AND ROOF PLAN

H-A201 HONOR GUARD BUILDING - ELEVATIONS AND BUILDING SECTIONS

H-A310 HONOR GUARD BUILDING - WALL SECTIONS

H-A401 HONOR GUARD BUILDING - INTERIOR ELEVATIONS

H-A501 HONOR GUARD BUILDING - DETAILS

M-AD101 EXISTING STAFF AND MAINTENANCE GARAGE - DEMOLITION PLANS

M-A101 EXISTING STAFF AND MAINTENANCE - NEW CONSTRUCTION PLANS

M-A102 EXISTING STAFF AND MAINTENANCE GARAGE - ELEVATIONS AND SECTIONS

O-G101 OPEN STORAGE BUILDING - LIFE SAFETY PLAN

O-A101 OPEN STORAGE BUILDING - PLANS

O-A201 OPEN STORAGE BUILDING - ELEVATIONS

O-A301 OPEN STORAGE BUILDING - BUILDING & WALL SECTIONS

P-A101 PUMPHOUSE - PLANS, ELEVATIONS AND SECTIONS

S-G101 STAFF BUILDING - LIFE SAFETY PLAN

S-A101 STAFF BUILDING - FLOOR PLAN, REFLECTED CEILING PLAN AND ROOF PLAN

S-A201 STAFF BUILDING - ELEVATIONS AND BUILDING SECTIONS

S-A310 STAFF BUILDING - WALL SECTIONS

S-A311 STAFF BUILDING WALL SECTIONS

S-A401 STAFF BUILDING - ENLARGED PLANS & INTERIOR ELEVATIONS

S-A501 STAFF BUILDING - DETAILS

W-A101 WASHBAY - FLOOR PLANS AND EXTERIOR ELEVATIONS

W-A102 WASHBAY - SECTIONS AND DETAILS

E-P101 ENCLOSED STORAGE BUILDING - PLUMBING PLAN

H-P101 HONOR GUARD BUILDING - PLUMBING PLAN - FIRST FLOOR

H-P102 HONOR GUARD BUILDING - PLUMBING PLAN - ROOF

H-P201 HONOR GUARD BUILDING - PLUMBING DETAILS

H-P301 HONOR GUARD BUILDING - SANITARY RISER DIAGRAM

H-P401 HONOR GUARD BUILDING - DOMESTIC WATER RISER DIAGRAM

M-P101 EXISTING MAINTENANCE STAFF - LEVEL 1 PLUMBING PLAN

M-P201 RISER DIAGRAMS

M-PD101 EXISTING MAINTENANCE STAFF - LEVEL 1 DEMOLITION PLAN

O-P101 OPEN STORAGE BUILDING - PLUMBING PLAN

S-P101 STAFF BUILDING - PLUMBING PLAN - FIRST FLOOR

S-P102 STAFF BUILDING - PLUMBING PLAN - ROOF

S-P201 STAFF BUILDING - PLUMBING DETAILS

S-P301 STAFF BUILDING - DOMESTIC WATER RISER DIAGRAM

S-P401 STAFF BUILDING - SANITARY RISER DIAGRAM

W-P101 NEW WASH BAY - LEVEL 1 PLUMBING PLAN

W-P201 RISER DIAGRAMS

W-P301 DETAILS

E-M101 ENCLOSED STORAGE BUILDING - HVAC PLAN

E-M201 ENCLOSED STORAGE BUILDING - HVAC DETAILS

E-M301 ENCLOSED STORAGE BUILDING - HVAC SCHEDULES & CONTROLS

F-M101 FUEL STORAGE - HVAC PLAN - FIRST FLOOR

F-M201 FUEL STORAGE - HVAC DETAILS

H-M101 HONOR GUARD BUILDING - HVAC PLANS

H-M201 HONOR GUARD BUILDING - HVAC SECTIONS

H-M301 HONOR GUARD BUILDING - HVAC DETAILS

H-M302 HONOR GUARD BUILDING - HVAC DETAILS

H-M303 HONOR GUARD BUILDING - HVAC DETAILS

H-M401 HONOR GUARD BUILDING - HVAC SCHEDULES

H-M501 HONOR GUARD BUILDING - CONTROL DIAGRAMS

M-M100 EXISTING STAFF AND MAINTENANCE GARAGE - HVAC DEMOLITION PLAN - FIRST FLOOR

M-M101 EXISTING STAFF AND MAINTENANCE GARAGE - HVAC PLAN - FIRST FLOOR

M-M102 EXISTING STAFF AND MAINTENANCE GARAGE - HVAC PLAN - ROOF

M-M201 EXISTING STAFF AND MAINTENANCE GARAGE - HVAC SECTIONS

M-M301 EXISTING STAFF AND MAINTENANCE GARAGE - HVAC DETAILS

M-M302 EXISTING STAFF AND MAINTENANCE GARAGE - HVAC DETAILS

M-M401 EXISTING STAFF AND MAINTENANCE GARAGE - HVAC SCHEDULES

M-M501 EXISTING STAFF AND MAINTENANCE GARAGE - CONTROL DIAGRAMS

M-M502 EXISTING STAFF AND MAINTENANCE GARAGE - CONTROL DIAGRAMS

P-M101 PUMPHOUSE - HVAC PLAN - FIRST FLOOR

P-M201 PUMPHOUSE - HVAC SECTIONS & DETAILS

P-M301 PUMPHOUSE - HVAC CONTROLS & SCHEDULES

S-M101 STAFF BUILDING - HVAC PLAN - FIRST FLOOR

S-M102 STAFF BUILDING - HVAC PLAN - ROOF

S-M201 STAFF BUILDING - HVAC SECTIONS

S-M301 STAFF BUILDING - HVAC DETAILS

S-M302 STAFF BUILDING - HVAC DETAILS

S-M303 STAFF BUILDING - HVAC DETAILS

S-M401 STAFF BUILDING - HVAC SCHEDULES

S-M501 STAFF BUILDING - CONTROL DIAGRAMS

W-M101 NEW WASH BAY - HVAC PLAN - FIRST FLOOR

W-M201 NEW WASH BAY - HVAC DETAILS

W-M202 NEW WASH BAY - HVAC DETAILS

W-M301 NEW WASH BAY - HVAC SCHEDULES

W-M401 NEW WASH BAY - CONTROL DIAGRAMS

E800 ELECTRICAL ONE-LINE DIAGRAMS

E801 ELECTRICAL EQUIPMENT DETAILS AND POWER DETAILS

E802 ELECTRICAL EQUIPMENT DETAILS

E-E201 EQUIPMENT STORAGE BUILDING - ELECTRICAL PLANS

E-E701 ENCLOSED & OPEN STORAGE - ELECTRICAL SCHEDULES & DETAILS

F-E201 FUEL STORAGE - ELECTRICAL POWER PLAN

H-E201 HONOR GUARD BUILDING - FLOOR PLANS

H-E202 HONOR GUARD BUILDING - ATTIC PLANS

H-E701 HONOR GUARD BUILDING - ELECTRICAL SCHEDULES & DETAILS

G-E101 PARTIAL ELECTRICAL SITE PLAN

G-E102 PARTIAL ELECTRICAL SITE PLAN

G-E103 PARTIAL ELECTRICAL SITE PLAN

G-E104 PARTIAL ELECTRICAL SITE PLAN

STRUCTURAL

S000 GENERAL NOTES

S001 TYPICAL DETAILS

S-501 STRUCTURAL COLUMBARIUM DETAILS

S-502 ENTRY WALL STRUCTURAL DETAILS

B-S101 BULK SOIL STORAGE - PLANS, SECTIONS AND DETAILS

E-S101 ENCLOSED STORAGE BUILDING - FOUNDATION PLAN, SECTIONS AND

DETAILS

H-S101 HONOR GUARD BUILDING - PLANS, SECTIONS AND DETAILS

O-S101 OPEN STORAGE BUILDING - FOUNDATION PLAN, SECTIONS AND

DETAILS

S-S101 STAFF BUILDING - PLANS AND SECTIONS

W-S101 NEW WASH BAY BUILDING - PLANS, SECTIONS AND DETAILS

BRIDGE REPAIR

BR101 BRIDGE REPAIR - BRIDGE NO 1 - OVER TRIBUTARY TO AIRE RUN

(NORTHWEST CULVERT)

BR102 BRIDGE REPAIR - BRIDGE NO 2 - OVER TRIBUTARY TO AIRE RUN

(SOUTHWEST CULVERT)

BR103 BRIDGE REPAIR - BRIDGE NO 3 - OVER TRIBUTARY TO AIRE RUN

(SOUTHEAST CULVERT)

BR104 BRIDGE NOS. 1, 2, AND 3 TYPICAL DETAILS

A501 DETAILS - ROOF

A601 DOOR & WINDOW SCHEDULES

A701 PARTITIONS

AS-101 STAFF & HONOR GUARD BUILDINGS SIGNAGE PLAN

AS-102 SIGNAGE PLAN

AS-103 ENLARGED SIGNAGE PLAN

PLUMBING

P001 PLUMBING SYMBOLS AND ABBREVIATIONS

ELECTRICAL

E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS

E002 LED LIGHTING IMPROVEMENTS

MECHANICAL

M001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES

NOTE ON DRAWING NAME CONVENTION:

B- BULK SOIL STORAGE BUILDING

E- ENCLOSED STORAGE BUILDING

F- FUEL STORAGE

H- HONOR GUARD BUILDING

M- EXISTING STAFF & MAINTENANCE BUILDING

O- OPEN STORAGE BUILDING

P- PUMP HOUSE

S- STAFF BUILDING

W- WASH BAY BUILDING

X- PIC/ADMIN & EXISTING PUMP HOUSE

O-E201 OPEN STORAGE BUILDING - ELECTRICAL PLANS

P-E201 PUMPHOUSE - FLOOR PLANS

P-E701 PUMPHOUSE - ELECTRICAL SCHEDULES & DETAILS

S-E201 STAFF BUILDING - FLOOR PLANS

S-E202 STAFF BUILDING - ATTIC PLANS

S-E701 STAFF BUILDING - ELECTRICAL SCHEDULES & DETAILS

W-E201 NEW WASH BAY - ELECTRICAL PLANS

W-E701 NEW WASH BAY - ELECTRICAL SCHEDULES

M-E201 EXISTING STAFF AND MAINTENANCE GARAGE - FLOOR PLAN

M-E701 EXISTING STAFF AND MAINTENANCE GARAGE - ELECTRICAL SCHEDULES & DETAILS

M-ED101 EXISTING STAFF AND MAINTENANCE GARAGE - ELECTRICAL DEMOLITION PLAN

# Revisions Date DWG 2 of 302

P001 PLUMBING SYMBOLS AND ABBREVIATIONS

M-PD101 EXISTING MAINTENANCE STAFF - LEVEL 1 DEMOLITION PLAN

M-P101 EXISTING MAINTENANCE STAFF - LEVEL 1 PLUMBING PLAN

M-P201 RISER DIAGRAMS

(ADD ALTERNATE #4)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street

Sewickley, PA

Phone: 412-287-7333 www.aeworks.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

AE WORKS®

B

IM

/C F

M -0

I G

A P

/C F

M -0

I G

A P

A

R C

H

L in ke d

M o d e l.r vt

/1

/2

:2

:3

A

M

G003

PERMIT MATRIX INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 TH AC

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

PERMIT MATRIX

TOWNSHIP DRIVEWAY PERMIT:

M-950A, APPLICATION FOR A MINIMUM

USE DRIVEWAY

EAST HANOVER

TOWNSHIP, TOWNSHIP

MANAGER (ERIC HARMON)

CONTRACTOR CONTRACTOR $25

MINIMUM CONTRACT DOCUMENT

DRAWINGS REQUIRED FOR PERMIT:

CS105, CG105, AND DT502.

PA Title 17, Chapter 47, Subsection 47.5 Notice of Intent to Drill (for groundwater wells)

PA Department of Conservation and Environmental Resources, Topographic & Geological Survey, Post Office Box 8453, Harrisburg, Pennsylvania 17105-8453

A/E (via well driller) N/A No fee

18 CFR Part 806, Subpart E, Registration of Grandfathered Projects

Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110

A/E N/A Federal Agencies Exempt

18 CFR Part 806, Subpart B, Constant-Rate Aquifer Test and Consumptive Use Application

Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110

A/E N/A Federal Agencies Exempt

PADEP Title 25 Chapter 245.203 Operation Permit for Regulated Aboveground Storage Tank

Pennsylvania Department of Environmental Protection

(PADEP)

Contractor Contractor $50 Only 1400 gal compartment requires registration and operating permit from

PADEP.

Section 106 of the National Historic Preservation Act (NHPA): Consultation and Coordination with Indian Tribal Governments (EO 13175) and Native American Graves Protection and Repatriation Act (NAGPRA) (EO 13007)

PA State Historic Preservation Office (SHPO)

A/E N/A No fee Complete. Section 106 completed with concurrence of no adverse effect.

Pennsylvania Natural Heritage Program (PNHP) Threatened and Endangered Species Consultation

Pennsylvania Game Commission (PGC), Pennsylvania Department of Conservation and Natural Resource (DCNR), Pennsylvania Fish and Boat Commission (PFBC), and U.S. Fish and Wildlife Service

(USFWS)

A/E VA $40 Complete. Performed via PNDI.

PADEP Chapter 102 PAG-02 NPDES General Permit for Stormwater Discharges Associated with Construction Activities

Pennsylvania Department of Environmental Protection

(PADEP)

Contractor VA $19,147.60 Paid. Review in progress by Lebanon County Conervation District. Contractor paperwork required during construction.

Joint 404/401 Permit U.S. Army Corps of Engineers (USACE)

A/E N/A Waived

Permit Name Permitting Agency Responsible Party Payor Fees Notes

TOWNSHIP DRIVEWAY

PERMIT REQUIRED FOR RE

TRAILER/YARD ENTRANCE

# Revisions Date DWG 3 of 302

EXISTING PROPOSED

BOUNDARY/RIGHT-OF-WAY LINE

ADJACENT BOUNDARY LINE

EASEMENT LINE

ROAD CENTERLINE

HEADER CURB

CURB & GUTTER

EDGE OF PAVEMENT

CHAIN LINK FENCE

OVERHEAD UTILITY LINE

UNDERGROUND UTILITY LINE

WATER MAIN

BUILDINGS

SIDEWALK

SANITARY SEWER MAIN

STORM SEWER LINE

TREES/SHRUBS

LIMITS OF WORK

INDEX CONTOUR LINE

INTERMEDIATE CONTOUR LINE

SPOT ELEVATIONS

MISCELLANEOUS SIGNS

SITE LIGHT WITH POLE

DRIP LINE OF TREES

REVERSE CURB

543.6

TO BE

REMOVED

TO

REMAIN

BOARD FENCE

8" W/M8" W/M

8" PVC SAN. SEW.

15" HDPE

TRANS.CURB

SOIL BOUNDARYHbB HgC

WIRE FENCE

EDGE OF GRAVEL

GUARDRAIL

CIVIL LEGEND:

EDGE OF CONCRETE

LP

SANITARY SEWER CLEAN-OUT

SANITARY SEWER MANHOLE

STORM SEWER MANHOLE

STORM SEWER DROP INLET

STORM SEWER CURB INLET

STORM SEWER RIP-RAP

STORM SEWER END SECTION

FIRE HYDRANT

WATER VALVE

WATER METER

MAIL BOX

UTILITY POLE

FEATURE WALL

OVERHEAD COMMUNICATIONS LINE

UNDERGROUND COMMUNICATIONS LINE

BUILDING MOUNTED LIGHT

UTILITY POLE GUY WIRE

SANITARY SEWER FORCE MAIN

8" PVC SAN. SEW.

15" HDPE

EX. CC RBF

CONCRETE MONUMENT/IRON REBAR

TBSCC-TBSIPF

UNDERGROUND GAS LINE

C3

CO

45 0

GS 45 0

TC 45 0

INV

EX.

EX.

X

CO

MB

MONVDH

EX. VDH

ABBREVIATIONS:

HEADSTONE FACE DIRECTION

BURIAL CRYPT PLOTS

GRAVESITE GRID MONUMENT

DRAINAGE FLOW ARROW

DETAIL LABEL

SECTION MARKER

F

PRE-PLACED CRYPTS

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LIMITS OF GRADING

LIMITS OF CLEARING

XX

XXXXX

WETLANDS

IN-GROUND CREMAIN SITES

FLAG SLEEVES

FLAG POLEF

DETAIL NO.

SHEET REFERENCE

DIRECTION OF TRAFFIC ARROWS

FEATURE WALL

33 32

TEST PIT LOCATION

A AREA OR ARC

AC ACRE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN AMDINISTRATION

AGE ABOVE GROUND ELECTRIC

AGEC ABOVE GROUND ELECTRIC CONDUIT

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ASPH ASPHALT

AST ABOVE-GROUND STORAGE TANK

ATS ACTIVE TREATMENT SYSTEM

AVE AVENUE

AWWA AMERICAN WATER WORKS ASSOCIATION

A/C AIR CONDITIONING

BC BOTTOM OF CURB

BF BASEMENT FLOOR

BFP BACKFLOW PREVENTER

BFV BUTTERFLY VALVE

BITUM BITUMINOUS

BL BASE LINE

BLDG BUILDING

BLVD BOULEVARD

BM BENCHMARK, BASELINE MARKER

BMP BEST MANAGEMENT PRACTICES

BOE BOTTOM OF EXCAVATION

BOV BLOW OFF VALVE

BRG BEARING

BRL BUILDING RESTRICTION LINE

BV BALL VALVE

BW BOTTOM OF WALL

C COEFFICIENT OF RUNOFF

CALC CALCULATE

CB CATCH BASIN OR CHORD BEARING

CC CENTER TO CENTER

CCTV CLOSED CIRCUIT TELEVISION

CD CONSTRUCTION DOCUMENTS, CONTRACT DOCUMENTS OR CHECK DAM

CDW CHILLED DRINKING WATER

CDWR CHILLED DRINKING WATER RETURN

CDWS CHILLED DRINKING WATER SUPPLY

CE CONSTRUCTION ENTRANCE

CEM CEMENT OR CEMETERY

CF CONTRACTOR FURNISHED

CFS CUBIC FEET PER SECOND OR COMPOST FILTER SOCK

CG CURB AND GUTTER

CHD CHORD

CIP CAST IRON PIPE OR CULVERT INLET PROTECTION

CJ CONTRACTION JOINT

CL CENTERLINE, CLASS

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CN CURVE NUMBER

CND CONDUIT

CNR CORNER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATIONS

CONC CONCRETE

COND CONDITION OR CONDENSER

CONF CONFERENCE

CONN CONNECTION

CON CONTAMINATED

CONSTR CONSTRUCTION

CONT CONTINUATION

CONTR CONTRACT OR CONTRACTOR

COR CONTRACTING OFFICER'S REPRESENTATIVE

COTG CLEANOUT TO GRADE

COV COVER OF CUT OFF VALVE

CPv CHANNEL PROTECTION VOLUME

CPPE CONSERVATION PRACTICE PHYSICAL EFFECTS

CPP CORRUGATED PLASTIC PIPE

CRN CROWN

CSB CONCRETE SPLASH BLOCK

CSI CONSTRUCTION SPECIFICATIONS INSTITUTE

CSS COMMITTAL SERVICE SHELTER

CSP CONCRETE SEWER PIPE

CT COURT

CTR CENTER OR CONTOUR

CTRL CONTROL

CTS COOLING TOWER SUPPLY

CTV CABLE TELEVISION

CV CONTROL VALVE

CW CLOCKWISE OR CONCRETE WASHOUT

CWP COLD WATER PIPING

D DEPTH

DAT DATUM

DB DEED BOOK; DESIGN-BUILD; DRAIN BASIN

DBL DOUBLE

DD DIVERSION DIKE

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DESC DESCRIPTION

DET DETAIL

DI DROP INLET

DIA DIAMETER

DIFF DIFFERENCE

DIP DUCTILE IRON PIPE

DIST DISTANCE

DM DROP MANHOLE

DOC DOCUMENT

DOM DOMESTIC

DR DRIVE

DRE DECOMPOSED ROCK ELEVATION

DS DOWNSPOUT

DWG DRAWING

D/W DRIVEWAY

D DELTA

EA EACH

EBL EAST BOUND LANE

EC EDGE OF CONCRETE

ECL EROSION CONTROL LOG

EG EDGE OF GUTTER

EJ EXPANSION JOINT

ELEV ELEVATION

ELEC ELECTRICAL

ENTR ENTRANCE

EOI END OF INFORMATION

EP EDGE OF PAVEMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

E&S EROSION & SEDIMENT

ES END SECTION

ESMT EASEMENT

ETO EARLY TURNOVER

EPT EXTERNAL PIPE THREAD

EQ EQUAL

EW END WALL

EXP EXPANSION

EX EXISTING

EXT EXTERIOR

FAR FLOOR AREA RATIO

FC FACE OF CURB

FD FOUNTAIN DRAIN

FF FIRST FLOOR OR FINISHED FLOOR

FG FINISHED GRADE

FH FIRE HYDRANT

FIN FINISHED

FLR FLOOR

FN FENCE

FP FLOOD PLAIN

FOC FACE OF CURB

FOTG FIELD OFFICE TECHNICAL GUIDE

FOY FOYER

FP FLAG POLE OR FIRE PROTECTION

FPS FEET PER SECOND

FR FROM

FS FILTER SOCK

FT FEET

FWS FLOWER WATERING STATION

G GAS

GAL GALLON

GDR GUARD RAIL

GEN GENERATOR

GFA GROSS FLOOR AREA

GIP GALVANIZED IRON PIPE

GL GROUND LEVEL

GOVT GOVERNMENT

GR GRADE

GR GUARD RAIL

GS GROUND SHOT

H HORIZONTAL

HC HANDICAP

HCP HANDICAPPED

HDPE HIGH DENSITY POLYETHYLENE

HDR HEADER

HDWL HEADWALL

HGL HYDRAULIC GRADE LINE

HH HAND HOLE

HLBC HOT LAID BITUMINOUS CONCRETE

HMA MOT-MIX ASPHALT

HP HIGH POINT OR HIGH PRESSURE

HR HAND RAIL

HT HEIGHT

HW HOT WATER

HWSR HOT WATER SUPPLY & RETURN

HWY HIGHWAY

HYD HYDRANT

HYDR HYDRAULIC

I RAINFALL INTENSITY

ID INSIDE DIAMETER

IGC IN-GROUND CRYPT

IN INCH

INV INVERT

IP IRON PIPE OR INLET PROTECTION

IPF IRON PIPE FOUND

IPS IRON PIPE SET

IRR IRRIGATION

IW IRRIGATION WATER

JB JUNCTION BOX

K ONE THOUSAND (KILO)

KWY KEYWAY

L LENGTH

LAT LATERAL

LF LINEAR FEET

LOC LOCATION

LONG LONGITUDE

LOS LINE OF SIGHT

LP LOW POINT OR LOW PRESSURE

LT LIGHT OR LEFT

LL LOWER LEVEL

M MARKER

MAINT MAINTENANCE

MAT MATERIAL

MAX MAXIMUM

MB MAIL BOX

MECH MECHANICAL

MED MEDIUM

MEMO MEMORANDUM

MEP MECHANICAL, ELECTRICAL, PLUMBING

MFG MANUFACTURING

MGT MANAGEMENT

MH MANHOLE

MI MILE

MIN MINIMUM

MISC MISCELLANEOUS

ML MATERIALS LIST

MN MAGNETIC NORTH

MOD MODEL OR MODIFY

MON MONUMENT

MS MEDIAN STRIP

MSL MEAN SEA LEVEL

MTG MEETING

MTL MATERIAL

MULT MULTIPLE

MUNIC MUNICIPAL

N NORTH

N/F NOW OR FORMERLY

NA MOT APPLICABLE

NAT MATURAL

NATL NATIONAL

NBC NATIONAL BUILDING CODE

NBL NORTH BOUND LANE

NCA NATIONAL CEMETERY ADMINISTRATION

NCPS NATIONAL CONSERVATION PRACTICE STANDARDS

NCTCOG NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS

NE NOT EXCEEDING

NFA NET FLOOR AREA

NHCP NATIONAL HANDBOOK OF CONSERVATION PRACTICES

NIC NOT IN CONTRACT

NO NUMBER

NOI NOTICE OF INTENT

NOM NOMINAL

NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

NRCP NON-REINFORCED CONCRETE PIPE

NRCS NATURAL RESOURCES CONSERVATION SERVICE

NTP NOT TO PROCEED

NTS NOT TO SCALE

OC ON CENTER

OCEW ON CENTER EACH WAY

OD OUTSIDE DIAMETER

OFB ORGANIC FILTER BERM

OFD OVERFLOW DRAIN

OFT ORGANIC FILTER TUBE

OH OVERHANG

OHC OVERHEAD COMMUNICATIONS

OHE OVERHEAD ELECTRIC

OP OUTLET PROTECTION

OS OVER-SIZED

OZ OUNCE

P PERIMETER, RAINFALL DEPTH

PAR PARALLEL

PAT PATTERN

PB PULL BOX

PBTH POTENTIAL BOG TURTLE HABITAT

PC POINT OF CURVATURE

PCA PORTLAND CEMENT ASSOCIATION

PCC POINT OF COMPOUND CURVE

PCEP POINT OF CURVE, EDGE OF PAVEMENT

PCT PERCENT

PCTC POINT OF CURVE, TOP OF CURB

PERF PERFORATED

PED PEDESTAL

PG PAGE

PGL POINT OF GRADE LINE

PH PROFILE HOLE

PI POINT OF INTERSECTION

PIC PUBLIC INFORMATION CENTER

PIV POST INDICATOR VALVE

PL PROPERTY LINE

POTW POTABLE WATER

PP POLYPROPYLENE (PLASTIC)

PPC PRE-PLACED CRYPT

PRC POINT OF REVERSE CURVE

PRELIM PRELIMINARY

POTW PUBLICLY-OWNED TREATMENT WORKS

PROP PROPOSED

PSI POUNDS PER SQUARE INCH

PSL PIPE SLEEVE

PT POINT OF TANGENCY

PTS PASSIVE TREATMENT SYSTEM

PV PRIVATE VAULT

PVC POLY VINYL CHLORIDE (PLASTIC PIPE)

PVI POINT OF VERTICAL INTERSECTION

PVMT PAVEMENT

PVT POINT OF VERTICAL TANGENCY

P&P PLAN AND PROFILE

Q FLOW, AMOUNT OF RUNOFF

Qf EXTREME FLOOD VOLUME Qp OVERBANK FLOOD PROTECTION VOLUME

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RISER, RADIUS

RAD RADIANS

RCN RUNOFF CURVE NUMBER

RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN

RD ROAD, ROOF DRAIN

RDC REDUCER

RE RESIDENT ENGINEER

REP REPAIR

REQ REQUIRED

REV REVISION

REv RECHARGE VOLUME

RGP ROUGH GRADING PLAN

RPA RESOURCE PROTECTION AREA

RR RAILROAD

RTE ROUTE

RT RIGHT

RV RELIEF VALVE

RW RETAINING WALL

R/W RIGHT-OF-WAY

SAN SANITARY

SB SPLASH BLOCK OR SEDIMENT BASIN

SBL SOUTH BOUND LANE

SCF SEDIMENT CONTROL FENCE

SCHED SCHEDULE

SD STORM DRAIN

SDMH STORM DRAIN MANHOLE

SEC SECTION

SEG SEGMENT

SEL SELECT

SEW SEWER

SF SQUARE FEET OR SILT FENCE

SSF SUPER SILT FENCE

SJ SCORED JOINT

SLV SLEEVE

SM SECTION MARKER

SMH STEAM MANHOLE

SOV SHUT OFF VALVE

SP SITE PLAN

SPEC SPECIFICATION

SPKLR SPRINKLER

SQ SQUARE

SS SANITARY SEWER, STORM SEWER OR STEAM SUPPLY

ST STREET OR SEDIMENT TRAP

STA STATION

STD STANDARD

STE STEAM

STK STACK

STM STORM

SUPT SUPPORT

SURV SURVEY

SVC SERVICE

SWM STORMWATER MANAGEMENT

S/W SIDEWALK

SWPPP STORM WATER POLLUTION PREVENTION PLAN (SWP3)

SWG SEWAGE

Sx CROSS SLOPE

SYM SYMBOL

T TANGENT

T&M TIME AND MATERIALS

TB TEST BORE

TC TOP OF CURB

Tc TIME OF CONCENTRATION

TCEQ TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN

TELE TELEPHONE

TH TEST HOLE

TNL TUNNEL

TOB TOP OF BANK

TOC TOP OF CURB

TOP TOP OF PAVEMENT

TOPO TOPOGRAPHY

TP TEST PIT, TELEPHONE POLE, OR TREE PROTECTION

TPDES TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM

TW TOP OF WALL

TXDOT TEXAS DEPARTMENT OF TRANSPORTATION

TYP TYPICAL

UD UNDERDRAIN

U/G UNDERGROUND

UGC UNDERGROUND COMMUNICATIONS

UGE UNDERGROUND ELECTRIC

UFC UNIFORM FIRE CODE

UL UPPER LEVEL

UON UNLESS OTHERWISE NOTED

UP UTILITY POLE

USACE U.S. ARMY CORPS OF ENGINEERS

USDA U.S. DEPARTMENT OF AGRICULTURE

UTIL UTILITY

V VERTICAL

VA VETERANS ADMINISTRATION, VIRGINIA

VAR VARIES

VC VERTICAL CURVE

VEL VELOCITY

VERT VERTICAL

VF VERTICAL FOOT

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VOL VOLUME

W WATER, WEST OR WIDE

W/ WITH

W/O WITHOUT

WBL WEST BOUND LANE

WI WROUGHT IRON

WL WATER LINE

WM WATER MAIN OR WATER METER

WO WORK ORDER

WQv WATER QUALITY VOLUME

WSE WATER SURFACE ELEVATION

WT WATER TIGHT

WW WASTE WATER

X-ING CROSSING

YI YARD INLET

YR YEAR

Z SIDE SLOPES

U.S. Department of Veterans Affairs

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JPG BJS# Revisions Date

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

Stamp

AL

TE

RN

AT

E

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

CIVIL NOTES, LEGEND, AND

ABBREVIATIONS

GI002

GENERAL NOTES:

1. THE PROPOSED SITE IMPROVEMENTS FOR 'INDIANTOWN GAP NATIONAL CEMETERY PHASE 5 DEVELOPMENT' INCLUDES, BUT IS NOT LIMITED TO, GRAVESITE EXPANSION, CONSTRUCTION OF IN-GROUND CREMAINS, COLUMBARIUM WALLS, IRRIGATION

EXTENSIONS, ASPHALT PAVEMENT, CONCRETE CURB & GUTTER, ASPHALT WALKS, STORM DRAIN INFRASTRUCTURE, SITE FURNISHINGS, MATERIAL STORAGE, MAINTENANCE YARD CONSTRUCTION, AND LANDSCAPING. THE PROJECT IS LOCATED IN LEBANON

COUNTY, PENNSYLVANIA.

2. SURVEY INFORMATION:

2.1. TOPOGRAPHIC INFORMATION SHOWN WEST OF OLD CUMBERLAND ROAD, AS IT BISECTS THE PROPERTY, NORTH OF INDIANTOWN GAP ROAD AND THE ACCESS DRIVE TO THE CEMETERY IS A COMBINATION OF FIELD SURVEY PERFORMED BY HONOR

ENGINEER CO. AND PHOTOGRAMMETRIC MAPPING COLLECTED AND CONTROLLED AT AN ACCURACY SUFFICIENT TO MEET ASPRS MAPPING STANDARDS FOR 30-SCALE MAPPING AT A 1-FOOT CONTOUR INTERVAL. THE HORIZONTAL DATUM IS NAD 83 (2011)(EPOCH:2010.0000) PA SOUTH ZONE GRID. REFERENCED FROM C.O.R.S. PASS, YORK, PAFC AND THE VERTICAL DATUM IS NAVD 88 REFERENCED FROM NGS BENCH MARK DISK "Z 257" (KW1173) (ELEV. 464.90'). CONTOURS AND MAPPING FEATURES SHOWN EAST OF OLD CUMBERLAND ROAD ARE TAKEN FROM THE PA SPATIAL DATA ACCESS SITE FROM STATE-WIDE IMAGERY FLOWN IN 2008.

2.2. BOUNDARY INFORMATION SHOWN HEREON IS A PRODUCT OF A RETRACEMENT SURVEY PERFORMED BY LIGHT-HEIGEL AND ASSOCIATES, INC. IN FEBRUARY OF 2016. HONOR ENGINEER COMPANY PERFORMED A RETRACEMENT SURVEY OF SAID PLAN FOR THE PORTION OF THE SITE WEST OF OLD CUMBERLAND ROAD WHERE SAID ROAD BISECTS THE SITE. BOUNDARY INFORMATION EAST OF OLD CUMBERLAND ROAD IS SHOWN PER THE LIGHT-HEIGEL RETRACEMENT SURVEY.

2.3. THIS SURVEY IS UNDER AND SUBJECT TO ANY INFORMATION THAT MAY BE DISCLOSED BY A COMPLETE AND ACCURATE TITLE REPORT.

2.4. RIGHT-OF-WAY INFORMATION SHOWN HEREON IS TAKEN FROM THE FOLLOWING PLANS:

2.4.A. "COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF HIGHWAYS DRAWINGS FOR CONSTRUCTION AND CONDEMNATION OF RIGHT OF WAY TR. ROUTE NO. 72, 223, 354 & S.H. ROUTE NO. 141 SPUR IN LEBANON COUNTY FROM STA. 681+09 T.R. 72 TO

STA. 486+82 T.R. 223 LENGTH 29,484.63 FT. 5.58 MI."

2.4.B. "COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF HIGHWAYS DRAWINGS FOR CONSTRUCTION AND CONDEMNATION OF RIGHT OF WAY ROUTE NO. 38001 SECTION NO. 1 IN LEBANON COUNTY FROM STA. 904+28.00 TO STA. 973+62.48 LENGTH

6,927.59 FT. 1.312 MILE."

2.4.C. "COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF HIGHWAYS DRAWINGS FOR CONDEMNATION OF RIGHT OF WAY ROUTE NO. 38023 SECTION NO. 1 IN LEBANON COUNTY FROM STA. 0+00.00 TO STA. 2+03.00 LENGTH 203.00 FT. 0.0385 MI."

2.4.D. "COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF HIGHWAYS DRAWINGS ESTABLISHING LIMITED ACCESS HIGHWAY, DESIGNATING FUTURE LOCATION AND WIDTH, AUTHORIZING CONDEMNATION OF RIGHT OF WAY AND PROHIBITING ERECTION AND MAINTENANCE OF OUTDOOR ADVERTISING DEVICES OF LEG. ROUTE 1005 SECTION 2 R/W IN LEBANON COUNTY FROM STA. 187+30.00 NB. 187+68.00 SB. TO STA. 345+00.00 NB. 345+00.00 SB. LENGTH 15,678.36 FT. 2.969 MI. ALSO FREE ACCESS LEG.

ROUTE 38001 SECTION 7 R/W FROM STA. 925+27.50 TO STA. 966+24.96 LENGTH 4,097.46"

3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 42075C0120E DATED JULY 8, 2020, AND 42075C0115E DATED JULY 8, 2020 ZONE X, AREA OF MINIMAL FLOOD HAZARD AND ZONE A. NO PORTIONS OF THE PROJECT AREA ARE LOCATED WITHIN THE 100-YEAR

FLOODPLAIN AREA (ZONE AE).

4. SEE THIS SHEET FOR LEGEND OF SYMBOLS USED HEREIN. ALSO REFER TO EACH SHEET FOR ADDITIONAL LEGEND INFORMATION.

5. BURIAL CEREMONIES MAY BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, ALL WORK MUST STOP, ESPECIALLY WHEN HEAVY EQUIPMENT ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY CAN CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY. COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.

6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE FREQUENTLY AS REQUIRED.

7. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMIZED AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE CEMETERY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE CEMETERY DIRECTOR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN. TEXT WILL BE PROVIDED BY CEMETERY DIRECTOR.

8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.

9. GORDON DOES NOT CERTIFY THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLAN. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON AVAILABLE INFORMATION. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES BEFORE COMMENCING WORK AND FOR ANY DAMAGES WHICH OCCUR BY THEIR FAILURE TO LOCATE OR PRESERVE THESE UNDERGROUND UTILITIES. IF DURING CONSTRUCTION OPERATIONS THE CONTRACTOR SHOULD ENCOUNTER UTILITIES OTHER THAN THOSE SHOWN ON THE PLAN, THEY SHALL IMMEDIATELY NOTIFY THE VA RE/COR AND TAKE NECESSARY AND PROPER STEPS TO PROTECT THE FACILITY AND ENSURE THE CONTINUANCE OF SERVICE.

CONSTRUCTION NOTES:

1. THE CONTRACTING OFFICER REPRESENTATIVE (COR) AND CONTRACTOR ARE RESPONSIBLE FOR REVIEWING THE PLANS PRIOR TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CIRCUMSTANCES FOUND WITHIN

THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.

2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS AND THE DEPARTMENT OF TRANSPORTATION CONSTRUCTION STANDARDS AND

SPECIFICATIONS, WHERE APPLICABLE.

3. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLAN FOR PHASING AND DETAILS.

4. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED TO CONTROL EROSION AND SEDIMENTATION.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CHANGES OR CONDITIONS ATTACHED TO PERMITS REQUIRED FOR CONSTRUCTION.

6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.

7. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.

8. THE CONTRACTOR SHALL CLEAR THE SITE OF ALL TREES, BUILDINGS, FOUNDATIONS, ETC. WITHIN THE LIMITS OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATING ANY DISCONNECTION AND/OR ABANDONMENT OF EXISTING UTILITIES AND STRUCTURES. IF NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ABANDONING ALL EXISTING WELLS AND/OR SEPTIC DRAIN FIELDS AND COORDINATING THEIR ABANDONMENT WITH THE VA NCA.

9. CONTRACTOR SHALL CONTACT PENNSYLVANIA ONE CALL SYSTEM, INC. AT 1-800-242-1776 OR PA811.COM A MINIMUM OF SEVENTY-TWO (72) HOURS PRIOR TO ANY EXCAVATION WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.

10. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION. THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD, WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL

NOTIFY GORDON.

11. GORDON DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION. IF SINKHOLES ARE FOUND IN THE FIELD, REMEDIATION WILL BE REQUIRED AS SPECIFIED BY A QUALIFIED GEOTECHNICAL ENGINEERING FIRM.

12. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE CONTRACTOR.

13. ALL PROPOSED ELEVATIONS AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.

14. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF ONE (1) FOOT SIX (6) INCHES BETWEEN CROSSING OF ALL UTILITY LINES UNLESS OTHERWISE NOTED.

15. EARTHWORK SHALL BE COMPACTED IN ACCORDANCE WITH SPECIFICATION 31 20 00.

16. THE CONTRACTING OFFICER REPRESENTATIVE (COR), CONTRACTOR, AND/OR SURVEYOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO STAKEOUT AND/OR CONSTRUCTION. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE U.S. DEPARTMENT OF VETERANS AFFAIRS ATTENTION FOR VERIFICATION PRIOR TO STAKEOUT.

17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. GORDON SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.

GENERAL UTILITY NOTES:

1. REFER TO THE PROJECT SPECIFICATIONS FOR WATER MAIN AND SANITARY SEWER CONSTRUCTION METHODS, MATERIALS, FIELD QUALITY CONTROL.

2. THERE SHALL BE NO PHYSICAL CONNECTION BETWEEN THE WATER DISTRIBUTION SYSTEM AND A SANITARY SEWER SYSTEM; ANY PIPES, PUMPS, HYDRANTS OR TANKS WHEREBY UNSAFE WATER OR OTHER CONTAMINATING MATERIALS MAY BE DISCHARGED OR

DRAWN INTO THE SYSTEM.

3. ALL NEW WATER MAINS SHALL BE DISINFECTED BEFORE THEY ARE PLACED IN SERVICE. ALL WATER MAINS TAKEN OUT OF SERVICE FOR INSPECTING, REPAIRING, OR OTHER ACTIVITY THAT MIGHT LEAD TO CONTAMINATION OF WATER SHALL BE DISINFECTED

BEFORE THEY ARE RETURNED TO SERVICE).

4. CONTRACTOR SHALL COORDINATE SERVICE DISCONNECTIONS AND NOTIFY VA RE/COR OF ANY SERVICE DISRUPTIONS PRIOR TO INSTALLATION OF PROPOSED UTILITIES.

WATER:

1. INSTALLATION OF WATER LINES:

A. BEFORE ANY PIPE IS INSTALLED IN TRENCHES, IT SHALL BE INSPECTED FOR DAMAGE AND THE INSIDE OF THE PIPE SHALL BE SWABBED TO REMOVE LOOSE DIRT AND FOREIGN OBJECTS. NO DAMAGED PIPE WILL BE PERMITTED TO BE INSTALLED.

B. BEDDING: CONTINUOUS AND UNIFORM BEDDING SHALL BE PROVIDED IN THE TRENCH FOR ALL BURIED PIPE. BACKFILL MATERIAL SHALL BE TAMPED IN LAYERS AROUND THE PIPE AND TO A SUFFICIENT HEIGHT ABOVE THE PIPE TO ADEQUATELY SUPPORT AND PROTECT THE PIPE. STONES FOUND IN THE TRENCH SHALL BE REMOVED FOR A DEPTH OF AT LEAST 6" BELOW THE BOTTOM OF THE PIPE.

C. COVER: ALL WATER MAINS SHALL BE COVERED WITH A MINIMUM OF 48" OF EARTH COVERING TO PREVENT FREEZING. ALL MAINS LESS THAN 8" IN DIAMETER AND WITHIN 5 FEET OF A HEAVILY TRAVELED HIGHWAY SHALL HAVE A MINIMUM OF 42" OF COVERING.

D. BLOCK: ALL TEES, BENDS, PLUGS AND HYDRANTS SHALL BE PROVIDED WITH TIE RODS OR JOINTS DESIGNED TO PREVENT MOVEMENT.

E. PRESSURE AND LEAKAGE TESTING: ALL TYPES OF INSTALLED PIPE SHALL BE PRESSURE TESTED AND LEAK TESTED IN ACCORDANCE WITH AWWA STANDARD C600. CONTRACTOR SHALL SUBMIT PLAN OF PROPOSED TESTING.

F. DISINFECTION: ALL NEW, CLEANED OR REPAIRED WATER MAINS SHALL BE DISINFECTED IN ACCORDANCE WITH AWWA STANDARD C651. THE SPECIFICATIONS SHALL INCLUDE MICROBIOLOGICAL TESTING OF ALL WATER MAINS.

2. WATER SERVICE LINES SHOWN ARE APPROXIMATE AND SUBJECT TO CHANGE BASED ON BUILDING ARCHITECTURAL DRAWINGS AND UTILITY CONNECTION LOCATIONS. CONTRACTOR SHALL VERIFY LOCATION OF UTILITY CONNECTIONS AND COORDINATE WITH VA

RE/COR PRIOR TO INSTALLATION.

SANITARY SEWER:

1. ALL SANITARY SEWER LINES SHALL BE COVERED WITH A MINIMUM OF 60" OF EARTH COVERING OVER THE TOP OF PIPE.

2. SEWER LINES SHALL BE LAID IN STRAIGHT LINE WITH UNIFORM SLOPE BETWEEN MANHOLES. SEWERS ON 20% SLOPE OR GREATER SHALL BE ANCHORED SECURELY WITH CONCRETE ANCHORS, OR APPROVED EQUAL.

3. MANHOLES - SHALL BE PRE-CAST CONCRETE MEETING REQUIREMENTS OF AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM). THE MINIMUM BASE DIAMETER SHALL BE 48" (MINIMUM OPENING 24"). THE INSIDE BASE OF THE MANHOLE SHALL BE FILLED WITH CONCRETE TO FORM A BENCH SLOPING TOWARD THE FLOW CHANNEL. WATERTIGHT MANHOLE COVERS ARE TO BE USED WHEREVER THE MANHOLE COVERS MAY BE FLOODED BY STREET RUNOFF OR HIGH WATER. PIPE CONNECTIONS TO MANHOLES AND JOINTS ON MANHOLES SHALL BE WATERTIGHT. CONCRETE MANHOLES SHALL BE WATERPROOFED ON THE EXTERIOR WHERE GROUNDWATER CONDITIONS ARE UNFAVORABLE.

4. GRAVITY SEWER LINES SHALL BE PVC PIPE, SCHEDULE SDR-35. ALL PIPES AND FITTINGS SHALL MEET OR EXCEED ALL REQUIREMENTS OF ASTM SPECIFICATIONS D-3034 AND/OR OTHER REQUIREMENTS OF UNI-BELL UNI-B4. JOINTS SHALL BE EITHER O-RING TYPE "OR" MECHANICAL SEAL JOINT MEETING MATERIAL REQUIREMENTS OF ASTM 1784 AND JOINT REQUIREMENTS OF ASTM 3212. NO SOLVENT CEMENT JOINTS WILL BE PERMITTED IN FIELD CONSTRUCTION.

5. LATERAL PIPING AND FITTINGS, IN SIZES 4" THROUGH 6", SHALL BE PVC PIPE, SCHEDULE 40.

10. THE CONTRACTOR SHALL FURNISH AND INSTALL THE WYE BRANCHES, RISER PIPE, SERVICE LATERALS, TRANSITION FITTINGS, AND INCIDENTALS WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE VA RE/COR.

N/ A

DWG 4 of 302

AE WORKS®

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

OHE OHE OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE OHE OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OH

E

OH

E

OHEOHE

OHE

OHE

OHE

OHE

OHE

OHEOHE OHE

OHEOHE

OH

E

OH

E

OHE OHE OHE

OH

E

OH

E

OH

E

OHE

OHE OHE

EX.

GRAVEL

DRIVE

EX. 1" WATER

SERVICE LINE

UGE

UGE

W

EX. WATER

VAULT COMMITTAL

SHELTER 1

FFE=505.27

EX. SANITARY

SEWER PUMP

STATION

EX. 40' UTILITY

ESM'T (TYP.)

EX. UNDERGROUND

ELECTRICAL LINE

(TYP.)

EX. HONOR

GUARD BLDG.

24" CMP

4" PVC 10" TCP

" T

CP

15"

12"

METAL

GARAGE

METAL

GARAGE

METAL

GARAGE

APPROX. LOCATION OF

WATER LINE TAKEN FROM

RECORD DRAWINGS TITLED,

"PHASE 4 - GRAVESITE

DEVELOPMENT & CEMETERY

IMPROVEMENTS" DATED 07-08-11

APPROX. LOCATION OF

WATER LINE TAKEN FROM

RECORD DRAWINGS TITLED,

"PHASE 4 - GRAVESITE

DEVELOPMENT & CEMETERY

IMPROVEMENTS" DATED 07-08-11

APPROX. LOCATION OF

WATER LINE TAKEN FROM

RECORD DRAWINGS TITLED,

"PHASE 4 - GRAVESITE

DEVELOPMENT & CEMETERY

IMPROVEMENTS" DATED 07-08-11

BENCHMARK #1:

MAG NAIL #150

ELEV.=480.43

N:398218.4120

E:2299270.9570

BENCHMARK #2:

MAG NAIL #151

ELEV.=487.47

N:398501.5700

E:2299382.4650

BENCHMARK #3:

MAG NAIL #153

ELEV.=505.04

N:399492.0690

E:2297813.7830

BENCHMARK #4:

MAG NAIL #152

ELEV.=518.67

N:399287.5830 E:2297474.8980

BENCHMARK #5:

MAG NAIL #155

ELEV.=467.39

N:398562.5570 E:2296066.6900

BENCHMARK #6:

MAG NAIL #154

ELEV.=493.75

N:398104.9430

E:2296376.7920

BENCHMARK #7:

MAG NAIL #2

ELEV.=491.83

N:397561.1900 E:2297013.7300

BENCHMARK #8:

REBAR #102

ELEV.=480.13

N:397392.1220 E:2297022.7150

U.S. Department of Veterans Affairs

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

02.18.2022 JPG BJS# Revisions Date

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

Stamp

AL

TE

RN

AT

E

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

GRAPHICAL SCALE: 1"=400'

400 200 0 400 800 1200

NORTH

GRAPHIC LEGEND:

PROPERTY LINE

OVERALL CEMETERY PROPERTY

PLAN

GI010

FIS

HE

R

AV

E

BIDDLE DR

BIDDLE DR

BIDDLE DR

QUARTERMASTER RD

CAVALRY RD

INTERSTATE 81

OLD CUMBERLAND ST

OL

D

CU

MB

ER

LA

ND

S

T

UNION TOWNSHIPEAST HANOVER

TOWNSHIP

N/ A

DWG 5 of 302

MAINTENANCE COMPLEX

COMMITTAL SHELTER 2

PENNSYLVANIA

VETERANS

MEMORIAL

RETENTION POND

COLUMBARIUM C

COMMITTAL SHELTER 1

REST ROOMS

ADMINISTRATION BUILDING

COLUMBARIUM A

COLUMBARIUM B

MAIN ENTRANCE

INDIANTOWN GAP ROAD

FIS

HE

R

AV

EN

UE

OLD CUMBERLAND ST

INDIANTOW

N GAP ROAD

BIDDLE DRIVE

9B

9C

8C

9A

38A

38B

38C

11 11

16A

16B

19B

19A

21A

16C

24B24A

24C24D

33A

31A 31B

33B

12B

12C

12D

12A

19C

16C

24E

APPROXIMATE END OF STUDY LIMITS

PER FEMA MAP 42075CO120E

APPROXIMATE 'ZONE A' FLOODPLAIN

LIMITS PER FEMA MAP 42075CO120E

NORTH EXIT

STAFF ENTRANCE

COLUMBARIUM D

BIDDLE DRIVE

OL

D

CU

MB

ER

LA

ND

S

TR

EE

T

MAINTENANCE ENTRANCE

PBTH

(TYP)

PBTH

(TYP)

EX. DRAINAGE WAY

EX. DRAINAGE WAY

EX

. D

RA

INA

GE W

AY

EX

. D

RA

INA

GE W

AY

EX. DRAINAGE WAY

EX. DRAINAGE WAY

EX. DRAINAGE WAY

EX. DRAINAGE WAY

EX

. D

RA

IN

AG

E W

AY

EX

. D

RA

INA

GE W

AY

EX

. D

RA

IN

AG

E W

AY

EX

. D

RA

IN

AG

E

W

AY

EX

. D

RA

IN

AG

E

W

AY

EX. DRAINAGE WAY

EX. DRAINAGE WAY

EX. DRAINAGE WAY

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FPFP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

GATE

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FPFPFPFP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP FP FP FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

MONUMENTS

BLEACHERS

POSTS

POSTS

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

POST

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

POSTS

POST

POSTS POST

POST

POST

POST

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

POST

POST

POST

POST

POST

POST

POST

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

POST

POST

POST

POST

POST

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FPFP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

POST

POST

POST

POST

FP

FP

FP

FP

FP

FP

FP

FP FP

FP FP

FPFP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FPFP

FP

FP

FP

POST

POST

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FPFP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FPFP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

POST

POST

POST

GATE

GATE

GATE

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FLAGPOLES

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP

FP

FP

FP

FLAGPOLES

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP FP FP

FP

FP

FP

FP

FP

FP

FP

FP

F…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .