S02 VA813-028 IGNC Phase 5 Drawing_Sheets 152-291.pdf

PDF 39 MB Posted

Attached to
Indiantown Gap National Cemetery | Phase 5 Expansion Development
Solicitation number
36C10F22R0030
Issued by

View the file

Other files

File Type Posted
S06 A0003 RFI Updated Drawings.pdf PDF
S05 ALL A0003 RFIs Complete .docx DOCX document
S06 36C10F22R0030 A0003.pdf PDF
S04 Pre-Proposal Conference - IGAP Phase 5 Presentation.pdf PDF
S06 03 48 21 Precast Concrete Burial Crypts.pdf PDF
S04 Pre-Proposal Conference Attendance Sheet.pdf PDF
S06 PRICE-COST SCHEDULE Attachment.docx DOCX document
S06 A0002 RFI Updated Drawings.pdf PDF
S06 36C10F22R0030 A0002.pdf PDF
S06 23 42 00 Dust Collector.pdf PDF
S06 04 05 16 Masonry Grouting.pdf PDF
S06 05 12 00 Structural Steel Framing.pdf PDF
S06 23 36 00 Air Terminal Units.pdf PDF
S06 Past Performance Questionnaire 36C10F22R0030.docx DOCX document
S06 36C10F22R0030 A0001..pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 124-151.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Divisions 00-33.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 63-96.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 292-302.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D2.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D5-H.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix A-D1.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 16-23.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D4.pdf PDF
S02 36C10F22R0030 F.pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F22R0030.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 24-39.pdf PDF
S02 VA813-028 IGNC Phase 5 Specs_Appendix D3.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220093.pdf PDF
S02 PAST PERFORMANCE QUESTIONNAIRE SAMPLE.docx DOCX document
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 40-62.pdf PDF
S02 VAAR 852.219-77 VA Notice of Limitations on Subcontracting - Certificate of Compliance.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 97-123.pdf PDF
S02 Wage Determination Davis-Bacon Act No. PA20220006.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 11-15.pdf PDF
S02 VA813-028 IGNC Phase 5 Drawing_Sheets 1-10.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

40 Long Alley, Saratoga Springs, NY 12866

(518) 587-810

MP Designer of Record

WILLIAM H. GORDON

ASSOCIATES, INC

CHANTILLY, VIRGINIA

HONOR ENGINEERING CO.

HARRISBURG, PENNSYLVANIA

MABBETT & ASSOCIATES, INC.

BEDFORD, MASSACHUSETTS

PENNONI ASSOCIATES INC.

PHILADELPHIA, PENNSYLVANIA

COMMANDER'S CONCEPTS

COMMISSIONING

FOREST, VIRGINIA

AQUA ENGINEERING, INC

FORT COLLINS, COLORADO

B I M

C

F M

I G

A P

C

F M

I G

A P

A

R C

H L i n k e d

M o d e l r v t

P

M

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028PHASE 5 DEVELOPMENT

# Revisions Date 2.18.2022

RFP DOCUMENTS

02-18-2022

PHASE 4 RECORD DRAWING -

COLUMBARIUM COMPLEX C

ELEVATIONS 2

L-707

JGS KMK

FOR REFERENCE ONLY

DWG 152 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

40 Long Alley, Saratoga Springs, NY 12866

(518) 587-810

MP Designer of Record

WILLIAM H. GORDON

ASSOCIATES, INC

CHANTILLY, VIRGINIA

HONOR ENGINEERING CO.

HARRISBURG, PENNSYLVANIA

MABBETT & ASSOCIATES, INC.

BEDFORD, MASSACHUSETTS

PENNONI ASSOCIATES INC.

PHILADELPHIA, PENNSYLVANIA

COMMANDER'S CONCEPTS

COMMISSIONING

FOREST, VIRGINIA

AQUA ENGINEERING, INC

FORT COLLINS, COLORADO

B

C

F M

I G

A P

C

F M

I G

A P

A

R C

H L i n k e d

M o d e l r v t

P

M

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028PHASE 5 DEVELOPMENT

# Revisions Date 2.18.2022

RFP DOCUMENTS

02-18-2022

PHASE 4 RECORD DRAWING -

STONE VENEER SCHEDULE 1

L-713

JGS KMK

FOR REFERENCE ONLY

DWG 153 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

BIDDLE ROAD

INDIANTOWN GAP

ROAD (R/W VARIES)

OLD CUMBERLAND STREET

BROKEN AND DAMAGEDCONCRETE MONUMENT(FOUND)N32°47'41"W0.22'CORNER NO. 7

BOUNDARY LINE

(R /W

V

AR

IE

S)

(33' R/W)

(50' R/W)

LA

KO

TA

L

N (5

0' R/

W

INDIANTO

W

N G

AP

RO

AD (R/W

VARIES)

EXISTING

STORAGE

BUILDING

Boundary Road

Biddle Drive

Fisher Avenu e

Indiantown Gap Road

INDIANTOWN GAP NATIONAL

CEMETERY SIGN

X X

X X

X X

X X

X X

X

X

X

X

X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X

XXXXXXXXXX

SEEBEES MONUMENT

CHINA-BERMA-INDIA MEMORIAL

NEW ENTRANCE ROAD

NEW ROAD 'A'

NE

W

S

ER

VI

CE

E

NT

RA

NC

E

X

NEW LOOP ROAD

SOD MIX

SEED MIX

425430

421422423424426427428429431432433

430 435 440

428 429 431 432 433 434 436 437 438 439 441 442 443430427 428 429 431

440 436437438439441

430435440445

429431432433434436437438439441442443444446447448

426427428429

431432433434

436437

458459

0439 441 442 443

431432

436437

42842

449451452453454

468 469

472 473

476477

5 463

46446

421421422

424 42

3 434

436 4374 38 439

430430435

429429431

432433

447448

451452453454456457458459

470475480 469471472473474476477478479481

470469

466 467 468469

460 456457

458459

462463

470 46

46746846

482483

466467468469

471472473474

470 466

46947

461462 463464

468469 471472473

478479 481482483484

5 47

480 481

481482

479475

477478

457 458 459

457458459

462463464466

503503

458459

448 449

433434

-2.

9%

-2 .9%

-3.

0%

-2.4%

-5.4%

-2.1%

509 505

508.1 508.0

45 GS

45GS

GS54

61 GS

61 GS

56 61

GS56

45 GS

GS56

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

10"

4"

4"

4"

4"

4"

4"

4"

4" 4"

4"

3"

3"

3" 3"

3"

3"

3"

2" 1.5"

3"

2"

2"

1.5" 1.5"

3" 2"

2"

1.5"

1.5"

3"

3"

3"

3"

3"

3"

3"

2"

1.5"

3"

2"

1.5"

3"

2"

2"

1.5"

3"

3"

2"

1.5"

3"

3" 1.5"2"

1.5"

3"

3"

2"

1.5"

3"

2"

1.5"

3"

2"

1.5"

3"

2"

1.5"

3" 2"

1.5"

3"

1.5"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

2"

1.5"

1.5"

3"

2"

1.5"

3"2"

1.5"

3" 3"

1.5"

2"

1.5"

3"

3"

2"

1.5"

2"

1.5"

3"

3"

1.5"

2"

1.5"

3"

3"

2"

1.5"

1.5"

3" 3"

2"

1.5"

P

22 22

22 22

22 22

B38 2"

B39

2"

B40 2"

A

A

A

A

B31 1"

B32 2"

B33 2"76

B34

2"

B35 2"76

Q

B7 2"101

B6

2"

B5

2"

B11

2"

B10

2"

B9 2"

B8 2"76

B15

2"

B14 2"

B13

2"

B12 2"101

B18

2"

B16 2"

B17 2"101

B21

2"

B22 2"76

B23 2"

B24

2"

B20

2"

B19 2"101

B28

2"

B27 2"76

B26 2"

B25

2"

B29 2"101

B30 2"

B36 1.5"

B1 2"

EXCAVATE AND EXPOSE EXISTING 6-INCH MAINLINE. CONNECT

TO EXISTING MAINLINE USING DUCTILE IRON TEE AND REPAIR

COUPLINGS. INSTALL JOINT RESTRAINTS, BACKFILL HOLES,

AND COMPACT TO MATCH EXISTING CONDITIONS.

INSTALL TANK FILL VALVE INTENDED FOR MANUAL IRRIGATION

WITH WATER TRUCK.

A

B

4 7

A27

1.5"

1.5"

1.5"

2"

2"

2" 1.5" 1.5" 1.25" 1.25"

1.5"33

1.25"

B4

2"

3"

3"

2"

1.5"

A28

2"

1.5"

2"

W

F

F

F

F

F

MANUAL MAINLINE DRAIN FOR

WINTERIZATION, DAYLIGH PIPE AND

TERMINATE IN MITERED HDEP DRAIN END.

USE EXISTING TWO WIRE

DECODER CABLE FOR

NEW ZONES THIS SHEET.

2" 2"

2"

2"

2"

2"

2" 2"

2"

2"

1"

1"

2"

2"

2"

2" 2"

2"

2"

1"

2"

1"

2"

1"

2"2"

SECTION 54

SECTION 53

SECTION 52

SECTION 51

SECTION 50

1.5" 48-

141.5" 36-

1.5" 48-

Q

Q

Q

Q

11" 21-

21.5" 38-

1.5" 36-

Q

1.5" 41-

1.5" 43- 171" 21-

41.5" 36-

31.5" 48-

61.5" 48-

51.5" 48-

71.5" 48-

81" 24- 111.5" 36-

1.5" 48-

91.5" 48-

151" 12-

181" 18-

221" 20-

F

F

ROUTE 2,000 FEET OF TWO WIRE DECODER CABLE TO 22

EXISTING BATTERY OPERATED REMOTE CONTROL VALVES.

CHANGE SOLENOID TO BE COMPATIBLE WITH NEW CONTROLLER

AND TWO WIRE SYSTEM. TURN OVER BATTERY OPERATED

SOLENOIDS TO OWNER'S REPRESENTATIVE.

3" 3"

LINETYPE INDICATES

OVERHEAD ELECTRICAL

POWER EASEMENT BOUDNARY:

NO WORK SHALL BE

PERFORMED NEAR OR UNDER

THE TRANSMISSION LINES

WITHOUT EXECUTING AN

AGREEMENT WITH FIRST

ENERGY POWER COMPANY

REGARDING SAFE WORK

REQUIREMENTS.

PLEASE CONTACT SHARON

SCHMITT AT

973-401-8233/201-274-9640 AND

SCHMITT@FIRSTENERGYCORP.COM

REFER TO UTILITY PLAN FOR

ADDITIONAL FIRST ENERGY

NOTES

Q25

H25

H25

H25

H25

H

H

H

H25

H25

H25

H25

H

H25

H

H25

H

H25

H

H25

H25

H25

H

H25

H25

H

H25

H25

H25

H

H

H25

H25

H25

H25

H

H

H

H25H 25H25H25H25H25

1.5"

H25

H

H

H25

H25

H25 H25

1.25"

COORDINATE

INSTALLATION OF 40-FOOT

SLEEVE BETWEEN GUARD

RAILS AND CULVERT WING

WALL DURING

CONSTRUCTION.

Q

QQ

Q

Q

Q

4"

4"

2"

2"

2"

2"

Q Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q Q

Q

2"

2"

2"

2"

2"

Q

Q

Q

H25

H25

H25

H25

H25

H25 H

H

H

H

Q25

Q25

COORDINATE

SPRINKLER

PLACEMENT

WITH SIGN

Q

Q25

Q25

H

2"

1.5" 1.5"

1.25"

1.25"

H25

H25 H25

H25 H25

H25 H25

H25

H25

H25

H25

H25

Q25

Q25

Q25

H25

H

H25

H

H

H25

H25 H25 H

H

H

H

EXCAVATE AND EXPOSE EXISTING MAINLINE

PIPE AND WIRE AND INSTALL NEW REMOTE

CONTROL VALVE AT LOCATION INDICATED.

CONNECT TO EXISTING WIRE FOR LANDSCAPE

AROUND THE COMITTAL SHELTER, HENCE

BOTH VALVES WILL BE ON THE SAME STATION

AS THERE ARE NO SPARE WIRES IN THE AREA.

I

FILTER DISCHARGE PIPE CLASS 200 PVC

24'' X 24'' X 24'' INTAKE SCREEN

WITH 12'' HDPE DR 32.5 INTAKE PIPE

B43

1.5"

4'x8' OF RIP RAP ROCK DOWNSTREAM

OF FILTER DISCHARGE PIPE. SEE DETAIL SHEET LI506

3-INCH HDPE PIPE ON CONSISTENT SLOPE TO ELEVATION 471' OF THE POND EDGE.

4'x8' OF RIP RAP ROCK DOWNSTREAM

OF FILTER DISCHARGE PIPE. SEE DETAIL SHEET LI506

4"min sleeve

2.5"

1.5" 2"

1.25"

1.25"

1.25"

1.5" 1.25"

1.25"

1.25"

B41

2"

4"min sleeve

2" 2"

1.5"

1.5" 1.25"

1.25"

B42 1.5"37

2" 1.25"

1.25"

1.25"

1.25"

3"

3"

3"

8"

ADDITIONAL RUN OF TWO WIRE

DECODER CABLE FOR FUTURE

EXPANSION, COIL 3-FEET OF

CABLE IN STANDARD VALVE BOX

ADJACENT TO THE ISOLATION

GATE VALVE.

3"

3"

3"

3"

3"

3"

3"

3"

ROUTE 2,000 FEET OF TWO WIRE DECODER CABLE TO 22

EXISTING BATTERY OPERATED REMOTE CONTROL VALVES.

CHANGE SOLENOID TO BE COMPATIBLE WITH NEW CONTROLLER

AND TWO WIRE SYSTEM. TURN OVER BATTERY OPERATED

SOLENOIDS TO OWNER'S REPRESENTATIVE.

ROUTE 2,000 FEET OF TWO WIRE DECODER CABLE TO 22

EXISTING BATTERY OPERATED REMOTE CONTROL VALVES.

CHANGE SOLENOID TO BE COMPATIBLE WITH NEW CONTROLLER

AND TWO WIRE SYSTEM. TURN OVER BATTERY OPERATED

SOLENOIDS TO OWNER'S REPRESENTATIVE.

1.5"

2"

1.5"

3"

2"

2"

1.5"1.5"

H25

2.5"2.5"2" 1.25"2"

1.5"

1.25"

A31 2"64

2"

2" 1.25" 1.25"

1.5"

1.5"

1.25"

1.25"

A32

1.5"

H25

H25

H25

H25 1.5"

1.25"

1.25"

F

F

F25

F25

F

2.5" 2" 2" 1.5"

1.5" 1.25"

1.25"

F

F25

F25F25

2"

2"

1.5"

A29 1.5"

2.5"

2.5"

2"

2"

1.25" 1.5"

1.5"

1.25" 1.25"

A30

2"

3"

2" 1.5"

1.5"

A26 1"5

3"

2"

1.5"

3"

3" 2"

1.5"

A36

2"

3"

A35

2"

A34 1"5

3"

2"

2"

1.5"

A33 2"

2"

A39

2"

A38 1.5"25

3"

A37 2"

COORDINATE EXACT LOCATION OF TRUCK FILL

VALVE WITH COR PRIOR TO INSTALLATION OF MAINLINE

UPGRADE EXISTING RAIN BIRD ESP-LXD WITH

IQ-NCC COMMUNICATION MODULE , THIS

CONTROLLER WILL BE THE CLIENT

CONTROLLER.

3"2" 1.5"

1.5"

3"

3"

2"

COORDINATE EXACT LOCATION OF POTABLE WATER WELL AND

PIPE PRIOR TO INSTALLATION OF MAINLINE.

M

M

M M

M

M

PROVIDE AND INSTALL P7171D COMMUNICATION WIRE IN

2-INCH CONDUIT FROM PUMP STATION CONTROLLER TO

WELL PUMP ON OFF RELAY. INSTALL HANDHOLDS IN

STANDARD VALVE BOX EVERY 200-FEET AND ALL

CHANGES OF DIRECTION.

W

EXCAVATE AND EXPOSE THE WELL PUMP

DISCHARGE PIPE ASSUMED TO BE 2-INCH PVC AT

THE APPROXIMATE LOCATION INDICATED. PROVIDE

AND INSTALL A SOLVENT WELD SCH 40 SERVICE TEE

WITH THREADED OUTLET SIZED FOR A DATA

INDUSTRIAL 220 IMPELLER FLOW SENSOR. INSTALL

FLOW SENSOR ON TEE AND AND USE STANDARD

VALVE BOX WITH EXTENSIONS FOR FLOW SENSOR

INSTALLATION AND ISOLATION GATE VALVE. ROUTE

COMMUNICATION WIRE FROM FLOW SENSOR TO

PUMP HOUSE IN 2-INCH CONDUIT, DRILL A HOLE IN

THE CONCRETE BUILDING WALL AND ROUTE THE

COMMUNICATION WIRE TO A NEW CONTRACTOR

PROVIDED AND INSTALLED FLOW SENSOR

RECORDER. INSTALL RECORDER ADJACENT TO THE

EXISTING IRRIGATION CONTROLLER AND USE THE

EXISTING 120VAC POWER OUTLET AT THAT

LOCATION. COMMUNICATION WIRE ROUTED ABOVE

GROUND TO BE IN METAL CONDUIT. COORDINATE

LOCATION OF THE DATA INDUSTRIAL FC5000 FLOW

READER AND PROVIDE THE POWER CORD AND

WALL MOUNT. CONTRACTOR TO PROGRAM THE

FLOW READER WITH CORRECT K VALUES AND

OTHER INPUTS AS REQUIRED FOR ACCURATE FLOW

READING. SEE DETAIL

WELL WATER LEVEL MONITORING WILL USE A

BATTERY OPERATED PRESSURE TRANSDUCER.

THE TRANSDUCER WILL BE PROGRAMMED AND

DATA WILL WILL BE DOWNLOADED VIA BLUE TOOTH

TO A MOBILE DIVICE WITH COMPATIBLE CLOUD

APPLICATION. THE BASIS OF DESIGN IS SOLINIST

LEVEL LOGGER 5. SEE DETAIL

WELL WATER LEVEL MONITORING WILL USE A

BATTERY OPERATED PRESSURE TRANSDUCER.

THE TRANSDUCER WILL BE PROGRAMMED AND

DATA WILL WILL BE DOWNLOADED VIA BLUE TOOTH

TO A MOBILE DIVICE WITH COMPATIBLE CLOUD

APPLICATION. THE BASIS OF DESIGN IS SOLINIST

LEVEL LOGGER 5. SEE DETAIL

Q

4"

3"

3"

MAINTENENCE ADD ALT: IF ADD ALT NOT

ACCEPTED STUB OUT 3-INCH MAINLINE IN

LOCATION INDICATED DOWNSTREAM OF THE

ISOLATION GATE VALVE AND QUICK

COUPLING VALVE FOR FUTURE USE.

3"

3"

2"

1.5"

3"

1.5"

2"

3"

3"

2"

3"

3"

3"

3"

3"

1.5" 3"

2.5" 1.5"

1.5"

1.25"

1.5"

1.25"

1.25"

1.25"

1.25"

10"

3"

1.25"

3"

3" 1.5"

1.5"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

GENERAL NOTES

GENERAL DESCRIPTION FLAG NOTES

LEGEND

Q

A-1

2"

B

.5

F

F

F

22 22

A

AERATION LEGEND

A

M

A

F

W

IRRIGATION NOTES AND

LEGEND

KEY MAP N.T.S.

LI107

LI106

LI105

LI105

LI103

LI101 LI102

LI104

LI103

DWG 154 of 302

AE WORKS®

NEW ROAD 'A'

NEW LOOP ROAD

425430

422423424426427428429431432433

468 469

471 472 473 474

481 482 483 484

421421422

424 42

3 434 436 437 438 439

430430435

429429431431 432 432

470475480 469471472473474476477478479481

468469

460 456 457458459

461462463464

468469

477478

457 458 459

457458

-2.1%

10"

4"

4"

4"

3"

3"

3"

3"

3"

3"

3"

2"

1.5"

3"

2"

1.5"

3"

2"

2"

1.5"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

2"

1.5"

3"

3"

2"

1.5"

P

A

A

A

A

B31

1"

B32

2"

B33

2"

B34

2"

B35

2"

B7

2"

B6

2"

B5

2"

B17

2"

B36

1.5"

B1

2"

B

1.25"

B4

2"

W

F

F

F

MANUAL MAINLINE DRAIN FOR

WINTERIZATION, DAYLIGH PIPE AND

TERMINATE IN MITERED HDEP DRAIN END.

3" 3"

COORDINATE

INSTALLATION OF 40-FOOT

SLEEVE BETWEEN GUARD

RAILS AND CULVERT WING

WALL DURING

CONSTRUCTION.

Q

QQ

Q

Q 2"

2"

2"

2"

Q

Q

Q

Q

Q

Q

Q

Q

H25

H25

H25

H25

H25

H25 H

H

H

H

Q

Q

COORDINATE

SPRINKLER

PLACEMENT

WITH SIGN

Q

Q

Q

H

2"

1.5" 1.5"

1.25"

1.25"

H25

H25 H25 H25

H25 H25

H25

H25

H25

H25

H25

H25

Q

Q

Q

H

H25

H25

H

I

FILTER DISCHARGE PIPE CLASS 200 PVC

24'' X 24'' X 24'' INTAKE SCREEN

WITH 12'' HDPE DR 32.5 INTAKE PIPE

B43

1.5"

4'x8' OF RIP RAP ROCK DOWNSTREAM

OF FILTER DISCHARGE PIPE. SEE DETAIL SHEET LI506

3-INCH HDPE PIPE ON CONSISTENT SLOPE TO ELEVATION 471' OF THE POND EDGE.

4'x8' OF RIP RAP ROCK DOWNSTREAM

OF FILTER DISCHARGE PIPE. SEE DETAIL SHEET LI506

2" 1.25"

1.25"

3"

3"

M

M

M M

M

M

PROVIDE AND INSTALL P7171D COMMUNICATION WIRE IN

2-INCH CONDUIT FROM PUMP STATION CONTROLLER TO

WELL PUMP ON OFF RELAY. INSTALL HANDHOLDS IN

STANDARD VALVE BOX EVERY 200-FEET AND ALL

CHANGES OF DIRECTION.

WELL WATER LEVEL MONITORING WILL USE A

BATTERY OPERATED PRESSURE TRANSDUCER.

THE TRANSDUCER WILL BE PROGRAMMED AND

DATA WILL WILL BE DOWNLOADED VIA BLUE TOOTH

TO A MOBILE DIVICE WITH COMPATIBLE CLOUD

APPLICATION. THE BASIS OF DESIGN IS SOLINIST

LEVEL LOGGER 5. SEE DETAIL

3"

3"

2"

3"

3"

3"

3"

1.5" 3"

2.5" 1.5"

1.5"

1.5"

1.25"

1.25"

1.25"

1.25"

1.5"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

IRRIGATION PLAN 1

Scale: 1" =30'

M

AT

C H

LI

N

E

SE

E

SH

EE

T

LI

N

NORTH

PROJECT

MATCHLINE SEE SHEET LI104

M

ATC

H

LIN

E SEE SH

EET LI103

DWG 155 of 302

AE WORKS®

T-

NEW ENTRANCE ROAD

425430

422423424426427428429431432433

430 435 440

428 429 431 432 433 434 436 437 438 439 441 442

430427 428 429 431

440 436437438439441

426427428429

420 418

425430435440445

423424426427428429431432433434436437438439441442443444446447448

3424426427428429

431432433434

436437

0439 441 442 443

447448

451452453

5 463

46446

438 439

4"

4"

4"

4"

Q

4"

4"

Q Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

8"

ADDITIONAL RUN OF TWO WIRE

DECODER CABLE FOR FUTURE

EXPANSION, COIL 3-FEET OF

CABLE IN STANDARD VALVE BOX

ADJACENT TO THE ISOLATION

GATE VALVE.

3"

3"

3"

3"

3"

3"

3"

3"

COORDINATE EXACT LOCATION OF TRUCK FILL

VALVE WITH COR PRIOR TO INSTALLATION OF MAINLINE

2"

COORDINATE EXACT LOCATION OF POTABLE WATER WELL AND

PIPE PRIOR TO INSTALLATION OF MAINLINE.

Q

4"

3"

3"

MAINTENENCE ADD ALT: IF ADD ALT NOT

ACCEPTED STUB OUT 3-INCH MAINLINE IN

LOCATION INDICATED DOWNSTREAM OF THE

ISOLATION GATE VALVE AND QUICK

COUPLING VALVE FOR FUTURE USE.

10"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

IRRIGATION PLAN 1

Scale: 1" =30'

M

ATC

H

LIN

E SEE SH

EET LI101

N

NORTH

PROJECT

DWG 156 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

(304) 725-8456

SECTION 56

SECTION 57

SECTION 58

NEW ROAD 'A'481

482483

-2.

9%

-2 .9%

3" 3"

3"

3"

2"

2"

1.5"

3"

2"

1.5"

1.5"

2"

1.5"

3"2"

1.5"

2"

1.5"

2"

1.5"

3"

3"

1.5"

2"

1.5"

3"

3"

2"

1.5"

1.5"

3" 3"

B31

1"

B32

B28

2"

B27

2"

B26

2"

B25

2"

B29

2"

B30

2"

2"

2"

2"

2"

2" 2"

2"

2"

1"

1"

2"

2"1"

SECTION 54

SECTION 53

SECTION 52

SECTION 51

SECTION 50

1.5" 48-

1.5" 36-

1.5" 48-

Q

Q

Q

11" 21-

21.5" 38-

1.5" 36-

Q

41.5" 36-

31.5" 48-

61.5" 48-

51.5" 48-

71.5" 48-

81" 24-

1.5" 36-

1.5" 48-

91.5" 48-

F

F

1.5" H

H

H

H

H

H

H

1.25"

ROUTE 2,000 FEET OF TWO WIRE DECODER CABLE TO 22

EXISTING BATTERY OPERATED REMOTE CONTROL VALVES.

CHANGE SOLENOID TO BE COMPATIBLE WITH NEW CONTROLLER

AND TWO WIRE SYSTEM. TURN OVER BATTERY OPERATED

SOLENOIDS TO OWNER'S REPRESENTATIVE.

3"2" 1.5"

1.5"

3"

3"

2"

1.5"

1.5"

2"

3"

3"

2"

3"

3"

3"

3"

3"1.5"

PBTH

(TYP)

PBTH

(TYP)

480 481

481482

481482

1.5"

3"2"

1.5"

22 22

2" 2"

2"

2"

2"

2"

2" 2"

2"

2"

1"

2"

1"

2"

1"

2"2"

SECTION 54

1.5" 48-

1.5" 36-

1.5" 48-

Q

Q

1.5" 36-

1.5" 41-

171" 21-

151" 12-

181" 18-

221" 20- F

1.5"

3"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

IRRIGATION PLAN 2

Scale: 1" =30'

M

AT

C H

LI

N

E

SE

E

SH

EE

T

LI

N

NORTH

PROJECT

MATCHLINE THIS SHEET

M

AT

C H

LI

N

E

SE

E

SH

EE

T

LI

MATCHLINE THIS SHEET

M

AT

C H

LI

N

E

SE

E

SH

EE

T

LI

DWG 157 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

SECTION 60

SECTION 61

SECTION 59

SECTION 57

NE

W

S

ER

VI

CE

E

NT

RA

NC

E

X X

X X

X X

X

X X

X X

X X

X X

XX

X

X X

X X

X

PBTH

(TYP)

PBTH

(TYP)

446447448449

451452453454456457458459

466467468469

471472473474

470 466

46947

458459 461462463464

466467468469 471472473474

478479 481482483484

5 47

481482

6 475

457 458 459

457458459

462463464466

-2 .9%

-3.

0%

-2.4%

-5.4%

4"

4" 4"

4"

3"

3"

3"

2" 1.5"

3"

2"

2"

1.5" 1.5"

3" 2"

2"

1.5"

1.5"

3"

3" 3"

3"

3"

3" 1.5"2"

1.5"

3"

3"

3"

2"

1.5"

3"

2"

1.5"

3"

2"

1.5"

3" 2"

1.5"

3"

1.5"

3"

2"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

3"

2"

1.5"

3"

2"

1.5"

3" 3"

2"

1.5"

3"

3"

3" 3"

1.5"

2" 3"

3"

2"

1.5"

1.5"

22 22

B38

2"

B39

2"

B40

2"

Q

B7

2"

B6

2"

B5

2"

B11

2"

B10

2"

B9

2"

B8

2"

B15

2"

B14

2"

B13

2"

B12

2"

B18

2"

B16

2"

B17

2"

B21

2"

B22

2"

B23

2"

B24

2"

B20

2"

B19

2"

4 7

F

F

F

F

ROUTE 2,000 FEET OF TWO WIRE DECODER CABLE TO 22

EXISTING BATTERY OPERATED REMOTE CONTROL VALVES.

CHANGE SOLENOID TO BE COMPATIBLE WITH NEW CONTROLLER

AND TWO WIRE SYSTEM. TURN OVER BATTERY OPERATED

SOLENOIDS TO OWNER'S REPRESENTATIVE.

Q

Q

Q Q

Q

2"

2"

2"

2"

2"

Q

Q

H25

H

H

H25 H

25 H

H

H

H

H

B43

1.5"

4"min sleeve

2.5"

1.5" 2" 1.25"

1.25"

1.25"

1.5" 1.25"

1.25"

1.25"

B41

2"

4"min sleeve

2" 2" 1.5"

1.5" 1.25"

1.25"

B42

1.5"

2" 1.25" 1.25"

1.25"

3"

1.5"

2"

3"

3"

3"

1.5" 3"

1.25"

1.25"

1.25"

1.25"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

IRRIGATION PLAN 2

Scale: 1" =30'

MATCHLINE SEE SHEET LI101

N

NORTH

PROJECT

M

ATC

H

LIN

E SEE SH

EET LI103

M

ATC

H

LIN

E SEE SH

EET LI103

DWG 158 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

(R /W

V

AR

IE

S)

Fi sh er A ve nu e

INDIANTOWN GAP NATIONAL

CEMETERY SIGN

' P

BTH

BUFF

ER

0'

PB

TH

BU

FF

ER

45 GS

45 GS

45 GS

61 GS

61 GS

61 GS

45 GS

61 GS

Q

14 14

INSTALL SPRINKLERS 12-INCHES

FROM SIGN IN THIS AREA

INSTALL SPRINKLERS 12-INCHES

FROM WALL IN THIS AREA

INSTALL SPRINKLERS 12-INCHES

FROM WALL IN THIS AREA

2.5"2" 1.25"

1.25" 1.5"

1.5"

1.25" 1.25"

2"

2.5"

2" 1.5"

1.5" 1.5"

1.25"

1.5" 1.25"

1.25"

1.25"

2"

2.5"

1.5" 1.5"

1.25"

1.25"

1.25"

1.5"

3"

2.5"

2.5" 1.5"

1.25"

1.25"

2"2"

1.25" 1.25"

1.25"

1.25"

1.25"

2"

3"

3" 2.5"

2"

2"

1.25"

2"

3" 3" 2.5" 2"

2"

1.25"

2"

3"

2.5"2" 1.5"

1.25"

1.5" 1.5"

1.25"

2"

3"

2"1.5"

1.25"

2" 1.5"

1.25" 2"

1.25"

2.5" 2.5"

2" 1.5"

1.25"

1.25" 2"

1.25"

2.5"

1.5"

1.25"

1.25"

2"

300' PBTH BUFFER

Q

Q

Q

Q

Q

Q

Q

Q

Q

1.25"

2.5" 2.5"

2" 1.5"

1.25"

1.25" 2"

1.25"

2.5"

1.5"

1.25"

1.25"

2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

IRRIGATION PLAN 3

Scale: 1" =40'

M

ATC

H

LIN

E TH

IS SH

EET

M

AT

C H

LI

N

E

TH

IS

S

H

EE

T

1 ADD ALTERNATE #2 IRRIGATION

PLAN N.T.S.

2 ADD ALTERNATE #2 IRRIGATION

PLAN N.T.S.

N

NORTH

PROJECT

DWG 159 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

3503503

509 505

508.1 508.0

A27

1.5"

1.5"

1.5"

2"

3"

3"

2"

1.5"

A28

2"

1.5"

2"

USE EXISTING TWO WIRE

DECODER CABLE FOR

NEW ZONES THIS SHEET.

LINETYPE INDICATES

OVERHEAD ELECTRICAL

POWER EASEMENT BOUDNARY:

NO WORK SHALL BE

PERFORMED NEAR OR UNDER

THE TRANSMISSION LINES

WITHOUT EXECUTING AN

AGREEMENT WITH FIRST

ENERGY POWER COMPANY

REGARDING SAFE WORK

REQUIREMENTS.

PLEASE CONTACT SHARON

SCHMITT AT

973-401-8233/201-274-9640 AND

SCHMITT@FIRSTENERGYCORP.COM

REFER TO UTILITY PLAN FOR

ADDITIONAL FIRST ENERGY

NOTES

Q

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H 25H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H 25H

25H 25H

25H 25H

3"

3"

3"

1.5"

2"

1.5"

3"

2"

2"

1.5"1.5"

H

2.5"2.5"2" 1.25"2"

1.5"

1.25"

A31

2"

2"

2" 1.25" 1.25"

1.5"

1.5"

1.25"

1.25"

A32

1.5"

H

H

H

H 25 1.5"

1.25"

1.25"

F

F

F

F

F

2.5" 2" 2"

1.5"

1.5" 1.25"

1.25"

F

F

F 25F

2"

2"

1.5"

A29

1.5"

2.5"

2.5"

2"

2"

1.25" 1.5"

1.5"

1.25" 1.25"

A30

2"

3"

2" 1.5"

1.5"

A26

1"

3"

2"

1.5"

3"

3" 2"

1.5"

A36

2"

3"

A35

2"

A34

1"

3"

2"

2"

1.5"

A33

2"

2"

A39

2"

A38

1.5"

3"

A37

2"

3503503

509 505

508.1 508.0

Q

Q

Q

Q

Q

3 3

3 3 3 3 3

Q

3"

3"

2"

11 "

411 "

11 "

11 "

11 "

11 "

411 "

11 "

11 "

11 "

2"

11 "

11 "

11 "

2"

11 "

11 "

11 "

2"11 "

4 11 "

3"

3"

3"

REMOVE SPRINKLERS, LATERAL PIPE, MAINLINE PIPE

AND VALVES WITHIN DEMOLITION BOUNDARY, TURN

OVER SALVAGEABLE SPRINKLERS AND VALVES TO THE

OWNER'S REPRESENTATIVE, DISPOSE OF THE REST OF

UNSALVAGEABLE EQUIPMENT AND PIPE LEGALLY

OFFSITE

EXCAVATE AND EXPOSE THE EXISTING 3-INCH PVC PIPE

AND CONTROL WIRE AT THE LOCATION INDICATED.

CAP THE PIPE WITH PVC SCH 40 SOLVENT WELD CAP

AND COIL 3-FEET OF CONTROL WIRE AND PLACE CAP

AND WIRE COIL IN STANDARD VALVE BOX FOR FUTURE

RECONNECTION.

EXCAVATE AND EXPOSE THE EXISTING 3-INCH PVC PIPE

AND CONTROL WIRE AT THE LOCATION INDICATED.

CAP THE PIPE WITH PVC SCH 40 SOLVENT WELD CAP

AND COIL 3-FEET OF CONTROL WIRE AND PLACE CAP

AND WIRE COIL IN STANDARD VALVE BOX FOR FUTURE

RECONNECTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

IRRIGATION PLAN 4

Scale: 1" =30'

N

NORTH

PROJECT

1 COMITTAL SHELTER A IRRIGATION

DEMOLITION 2 COMITTAL SHELTER A IRRIGATION

PLAN

DWG 160 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

Q

2"

2" 1.5" 1.5" 1.25" 1.25"

1.5"

EXCAVATE AND EXPOSE EXISTING MAINLINE

PIPE AND WIRE AND INSTALL NEW REMOTE

CONTROL VALVE AT LOCATION INDICATED.

CONNECT TO EXISTING WIRE FOR LANDSCAPE

AROUND THE COMITTAL SHELTER, HENCE

BOTH VALVES WILL BE ON THE SAME STATION

AS THERE ARE NO SPARE WIRES IN THE AREA.

EXCAVATE AND EXPOSE EXISTING 6-INCH MAINLINE. CONNECT

TO EXISTING MAINLINE USING DUCTILE IRON TEE AND REPAIR

COUPLINGS. INSTALL JOINT RESTRAINTS, BACKFILL HOLES,

AND COMPACT TO MATCH EXISTING CONDITIONS.

INSTALL TANK FILL VALVE INTENDED FOR MANUAL IRRIGATION

WITH WATER TRUCK.

A

UPGRADE EXISTING RAIN BIRD ESP-LXD WITH

IQ-NCC COMMUNICATION MODULE , THIS

CONTROLLER WILL BE THE CLIENT

CONTROLLER.

W

EXCAVATE AND EXPOSE THE WELL PUMP

DISCHARGE PIPE ASSUMED TO BE 2-INCH PVC AT

THE APPROXIMATE LOCATION INDICATED. PROVIDE

AND INSTALL A SOLVENT WELD SCH 40 SERVICE TEE

WITH THREADED OUTLET SIZED FOR A DATA

INDUSTRIAL 220 IMPELLER FLOW SENSOR. INSTALL

FLOW SENSOR ON TEE AND AND USE STANDARD

VALVE BOX WITH EXTENSIONS FOR FLOW SENSOR

INSTALLATION AND ISOLATION GATE VALVE. ROUTE

COMMUNICATION WIRE FROM FLOW SENSOR TO

PUMP HOUSE IN 2-INCH CONDUIT, DRILL A HOLE IN

THE CONCRETE BUILDING WALL AND ROUTE THE

COMMUNICATION WIRE TO A NEW CONTRACTOR

PROVIDED AND INSTALLED FLOW SENSOR

RECORDER. INSTALL RECORDER ADJACENT TO THE

EXISTING IRRIGATION CONTROLLER AND USE THE

EXISTING 120VAC POWER OUTLET AT THAT

LOCATION. COMMUNICATION WIRE ROUTED ABOVE

GROUND TO BE IN METAL CONDUIT. COORDINATE

LOCATION OF THE DATA INDUSTRIAL FC5000 FLOW

READER AND PROVIDE THE POWER CORD AND

WALL MOUNT. CONTRACTOR TO PROGRAM THE

FLOW READER WITH CORRECT K VALUES AND

OTHER INPUTS AS REQUIRED FOR ACCURATE FLOW

READING. SEE DETAIL

WELL WATER LEVEL MONITORING WILL USE A

BATTERY OPERATED PRESSURE TRANSDUCER.

THE TRANSDUCER WILL BE PROGRAMMED AND

DATA WILL WILL BE DOWNLOADED VIA BLUE TOOTH

TO A MOBILE DIVICE WITH COMPATIBLE CLOUD

APPLICATION. THE BASIS OF DESIGN IS SOLINIST

LEVEL LOGGER 5. SEE DETAIL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

IRRIGATION PLAN 5

Scale: 1" =30'

N

NORTH

PROJECT2 COMITTAL SHELTER 2 MEDIAN

PLAN

1 PUMP STATION WATER TRUCK FILL

PLAN

DWG 161 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

1 AIR/VACUUM RELIEF VALVE

ASSEMBLY N.T.S. 2 ISOLATION GATE VALVE

ASSEMBLY N.T.S. 3 QUICK COUPLER VALVE

ASSEMBLY N.T.S.

4 REMOTE CONTROL VALVE

ASSEMBLY N.T.S.

IRRIGATION DETAILS 1

DWG 162 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

1 POP-UP SPRAY SPRINKLER

ASSEMBLY N.T.S. 2 POP-UP ROTOR SPRINKLER

ASSEMBLY N.T.S. 3 POP-UP ROTOR SPRINKLER

IN IRRIGATION AISLE ASSEMBLY N.T.S.

5 IN GROUND CREMAINS SPRINKLER PLACEMENT

DETAIL N.T.S.4 SPRINKLER PLACEMENT

DETAIL N.T.S.

54" MIN.

1'

>54"

>54"

IRRIGATION

AISLE BOUNDARY VARIES

8"

4'

62"

IRRIGATION DETAILS 2

DWG 163 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

1 CONTROLLER

ASSEMBLY N.T.S. 2 GROUNDING

DETAIL N.T.S. 3 DECODER CABLE FUSE DEVICE

ASSEMBLY N.T.S.

6 FLOWER WATER STATION

ASSEMBLY N.T.S.5 THRUST BLOCK

DETAIL N.T.S.4 JOINT RESTRAINT

DETAIL N.T.S.

PLAN VIEW

A. IRRIGATION CONTROLLER ASSEMBLY

B. UL LISTED 5/8" X 10' COPPER-CLAD

GROUNDING ROD

C. UL LISTED 4" X 8' COPPER GROUNDING PLATE

D. POLYMER 9" ROUND VALVE BOX WITH COVER

E. CADWELD CONNECTION: PAIGE ELECTRIC

F. 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL

G. BRICK (1 OF 4)

H. #6 AWG INSULATED SOLID COPPER WIRE. NO

SHARP BENDS.

I. SPHERE OF INFLUENCE

J. EARTH CONTACT MATERIAL, POWERSET© OR

POWERFILL© DEPENDING ON SOIL CONDITIONS

K. FINISH GRADE

A

C

B

8'

10'

11'

I

I

30" MINIMUM

12"

SECTION VIEW

H

H

H

B

C J

D

G

F

E

NOTES:

1. CONNECT ALL #6 AWG WIRES INSIDE THE

CONTROLLER. CONNECT ONE WIRE TO

THE CONTROLLER GROUND LUG AND

USE A #4 SPLIT BOLT TO CONNECT ALL

WIRES TOGETHER.

2. EARTH CONTACT MATERIAL MUST

COMPLETELY COVER THE WELD JOINT

ON THE GROUND PLATE.

K

Pipe Fitting with Joint Restraint

11.25° BEND (IPS)

(PJ x PJ)

TEE w/ REDUCER IN

BRANCH & RUN (IPS)

(PJ x PJ x PJ)

45° BEND (IPS)

(PJ x PJ)

22.5° BEND (IPS)

(PJ x PJ)

TEE (IPS)

(PJ x PJ x PJ)

90° BEND (IPS)

(PJ x PJ)

REDUCER (IPS)

(PJ x PJ)

PIPE BELL

UNDISTURBED SOIL

THRUST BLOCK

WIRE

X Y

IRRIGATION DETAILS 3

DWG 164 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

IRRIGATION PUMP STATION

"A A " ELEVATION VIEW

EQUIPMENT LIST

1'

5 4

PLAN VIEW

" M

IN

IM

U M

M

AI

N

TE

N

AN

C E

C

LE

AR

AN

C E

8 9

60-INCHES

REQUIRED FOR

FILTER

MAINTENANCE

3'

PLAN VIEW

A A 17

FRONT VIEWSIDE VIEW

CUT BOTTOM OUT OF 4' X 4' PLYWOOD AND SLIP OVER

PIPE, USE CUT OFF TO SEAL BOTTOM OF FORM. BACK

FILL AROUND FORM OR USE TIES AS NECESSARY

PRIOR TO POURING CONCRETE.

PIPE WALL FLANGE

CONCRETE

CONCRETE

PIPE WALL FLANGE

HDPE INTAKE PIPE

FINAL GRADE

2 INTAKE PIPE RESTRAINT

DETAIL N.T.S. 3 RESTRAINED CASING SPACER

DETAIL N.T.S.

DWG 165 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

1 IRRIGATION WELL PUMP

ASSEMBLY N.T.S.

IRRIGATION WELL PUMP

24"

36"

24"

2 TANK FILL VALVE

ASSEMBLY N.T.S.

30" MIN.15" MIN.

2'

5'

FLOW

SECTION VIEW

A

B

C

D E

FG

H

I

30" MIN.15" MIN.

J

2'

8'

5'

DWG 166 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

Sprinkler Status

WILLIAM H. GORDON ASSOCIATES, INC

CHANTILLY, VA

(304) 930-5779

HONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street Sewickley, PA Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRING, NY

(518) 587-8100

AL

TE

RN

AT

E

BI

M

C

FM

0-

IG

AP

/C

FM

0-

IG

AP

-A

R C

H _2

0_

N ew

W as hb ay

.rv t

8/ 2/

0:

:2

AM

INDIANTOWN GAP NATIONAL

CEMETERY

LEBANON COUNTY, PA

VA 813-028

2.18.2022

PHASE 5 DEVELOPMENT

RFP DOCUMENTS

# Revisions Date JDL CCT

Ce rt i f ie d Irr igat ion Designer

I R R

I G AT I O N A S S OC I A T I O

NCID

46102

JO

HN D. LEONARD

1 AERATION DIFFUSER

ASSEMBLY N.T.S.

4 INTAKE SCREEN

ASSEMBLY N.T.S.

3 AERATION COMPRESSOR CABINET

ASSEMBLY N.T.S.

IRRIGATION POND

AERATION

A

B

C

D

2 2-INCH ISOLATION GATE VALVE

ASSEMBLY N.T.S.

A

BF

C

D G

H

E

2'-0"

12"

1'-2"

DWG 167 of 302

AE WORKS®

INTEGRITY FEDERAL SERVICES

PLAN

ELEVATION

2 4 FEET20

SCALE: 1/4" = 1'-0"

2 4 FEET20

SCALE: 1/4" = 1'-0"

WDC ASA

VEGETATED

VEGETATED

MONUMENTS

F L

O W

N

NORTH SPANDREL WALL

32'-4"�

SOUTH SPANDREL WALL

29'-8"�

CULVERT

� PIPE-ARCH

CULVERT

� PIPE-ARCH

FLAG POLE

FLAG POLE

CURB (TYP.)

CONC. DRAINAGE

(TYP.)

STORM INLET

REPAVING

LIMIT OF ROADWAY

(TYP.)

SIDEWALK TRANSITION

ADA COMPLIANT

(TYP.)

TO DELINEATE CURBS

WHITE LINE STRIPING

(TYP.)

GEOTEXTILE MATERIAL

ROCK, R-4 BACKED WITH

(TYP.)

4'-0"

5'-6" 5'-6"4'-6" 4'-6"

SPACING

TIE-ROD

RAILING (TYP.)

CAP AND METAL PEDESTRIAN

DYED REINFORCED CONC. WALL

RAILING (TYP.)

METAL PEDESTRIAN

CONC. CAP (TYP.)

DYED REINFORCED

(FULL LENGTH)

SEDIMENT DEPOSIT

PIPE-ARCH

STRUCTURAL PLATE

1.

2.

3.

4.

5.

6.

7.

11.

13.

14.

15.

16.

18.

19.

20.

24.

17.

DESIGN IS IN ACCORDANCE WITH THE LRFD METHOD WHEN APPLICABLE.

PROVIDE 2-INCH CONCRETE COVER ON REINFORCEMENT BARS, EXCEPT AS NOTED.

A HIGHER CLASS CONCRETE MAY BE SUBSTITUTED FOR A LOWER CLASS CONCRETE

RAKE FINISH ALL HORIZONTAL CONSTRUCTION JOINTS, EXCEPT AS INDICATED.

ALL DIMENSIONS SHOWN ARE HORIZONTAL, EXCEPT AS NOTED.

SUPERSTRUCTURE DIMENSIONS SHOWN ARE FOR A NORMAL TEMPERATURE OF 68

STANDARD BRIDGE CONSTRUCTION (BC-700M SERIES) DRAWINGS.

THE FOLLOWING LEGEND APPLIES TO ALL DRAWINGS:

R.F. = REAR FACE

E.F. = EACH FACE

T. = TOP

BOT. = BOTTOM

F.F. = FRONT FACE

DEGREES FAHRENHEIT.

DESIGN SPECIFICATIONS:

DESIGN LIVE LOADS:

STRUCTURAL STEEL:

AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 2017, AND AS SUPPLEMENTED

PROVIDE REINFORCING STEEL BARS MINIMUM EMBEDMENT AND SPLICE LENGTHS IN

DO NOT CONSIDER ANY OF THE DATA ON THE EXISTING STRUCTURE MADE AVAILABLE

OF ANY OF THE CONDITIONS THAT YOU WILL ENCOUNTER IN THE FIELD.

APPLY AN APPROVED EPOXY ADHESIVE, WHERE AN ADHESIVE IS SPECIFIED.

21.

22.

CHAMFER EXPOSED CONCRETE EDGES 3/4 INCH BY 3/4 INCH, EXCEPT AS NOTED.

12.

10.

PROVIDE STRUCTURAL STEEL CONFORMING TO AASHTO M270 GRADE 36 DESIGNATION,

EXCEPT WHERE NOTED OTHERWISE.

PROVIDE GRADE 60 REINFORCING STEEL BARS THAT MEET THE REQUIREMENTS

OF ASTM A615/A615M, A996/A996M OR A706/A706M. DO NOT WELD GRADE 60

REINFORCING STEEL BARS UNLESS SPECIFIED. GRADE 40 REINFORCING STEEL

BARS MAY BE SUBSTITUTED WITH A PROPORTIONAL INCREASE IN CROSS-SECTIONAL

AREA, IF APPROVED. DO NOT USE RAIL STEEL A996/A996M REINFORCEMENT

BARS IN BRIDGE ABUTMENTS, OR WHERE BENDING OR WELDING OF THE

REINFORCEMENT BARS IS INDICATED.

FIELD AS NECESSARY FOR PROPER FIT OF THE PROPOSED CONSTRUCTION.

VERIFY ALL DIMENSIONS AND GEOMETRY OF THE EXISTING STRUCTURE IN THE

NOT PERMITTED UNLESS SPECIFIED.

THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE SAFE ERECTION OF ALL

STRUCTURAL COMPONENTS. PROVIDE ALL NECESSARY BRACING AND SUPPORTS.

APPLY AN EPOXY ADHESIVE BETWEEN ALL EXISTING STONE MASONRY AND

STRUCTURAL STEEL IN ACCORDANCE WITH PUBLICATION 408, SECTION 1060.

8.

APPLY PAINT IN A MANNER SO NO PAINT IS PLACED ON SURROUNDING STONE

USE CLASS AA CEMENT CONCRETE.

9.

UTILITY NOTE:

COORDINATE, LOCATE AND CONDUCT ALL WORK RELATED TO PUBLIC AND

PRIVATE UTILITIES IN ACCORDANCE WITH PUBLICATION 408/2020,

SECTIONS 105.06 AND 107.12.

23.

PROVIDE MATERIALS AND PERFORM WORK IN ACCORDANCE WITH PENNDOT

SPECIFICATIONS PUBLICATION 408/2020, AASHTO/AWS/D1.5:2008 BRIDGE

WELDING CODE, AND CONTRACT SPECIAL PROVISIONS.

BY THE DEPARTMENT'S DESIGN MANUAL, PART 4, DECEMBER 2019.

PHL-93, P-82, AND P2016-13

AT NO ADDITIONAL COST TO THE VA, IF APPROVED.

TO YOU BY THE VA OR ITS AUTHORIZED AGENTS AS POSITIVE REPRESENTATIONS

BY THE VA. SUBMIT PAINT COLOR.

MASONRY.

CONSTRUCTION DETAILS OTHER THAN THOSE SHOWN WILL CONFORM TO THE DEPARTMENT'S

GENERAL NOTES:

ACCORDANCE WITH STANDARD DRAWING BC-736M, UNLESS OTHERWISE INDICATED.

WELDING OF REINFORCEMENT BARS DURING FABRICATION OR CONSTRUCTION IS

GALVANIZE FABRICATED STRUCTURAL STEEL, THEN PAINT EXPOSED FABRICATED

PAINT ALL STEEL AND METAL FASTENERS WITH PAINT OF A COLOR APPROVED

A

A

ENDWALL (TYP.)

WITH CONC OUTLET

6" DIA. FOUNDATION DRAIN

(TYP.)

TIE-ROD

9'-9" CLR.

(PIPE ARCH)

O U

T

O U

T

DECORATIVE PLATE (TYP.)

DIA. TIE-ROD WITH 12" DIA.

LATERAL BRACING TIE-ROD, 1"

9'-9" SPAN

FROM STONE FACE

EXTEND MORTAR TO 1"

REPOINT STONE MASONRY,

C

R B

C U

R B

(NORTHWEST CULVERT)

TRIBUTARY TO AIRE RUN

BRIDGE REPAIR - BRIDGE NO. 1 OVER

B

B

CFS CFS CFS CFS

CFS CFSCFS CSF

NOTE: CFS DENOTES COMPOST FILTER SOCK

EPOXY COAT ALL REINFORCING BARS AND WELDED WIRE FABRIC (WWF),

UNLESS NOTED.

COATED REINFORCING STEEL BARS AT NO ADDITIONAL COST TO THE OWNER.

GALVANIZED REINFORCING STEEL BARS AND WWF MAY BE SUBSTITUTED FOR EPOXY

APPLY A TOOLED EDGE TO SIDEWALK.

JOINTS.

PROPOSED CEMENT CONCRETE AND AT ALL CEMENT CONCRETE CONSTRUCTION

CONCRETE FOR SIDEWALK (TYP.)

USE DYED EXPOSED AGGREGATE

WITH REINFORCED CONCRETE,

REPLACE SIDEWALK AND CURB

VARIES 4'-8"�

TO 4'-10"�

RADIAL

DIMENSIONS

16'-0"� CURB/CURB

28'-10"� OUT/OUT

V A

R I

E S

T

ASPHALT PAVING

EXPOSED AGGREGATE

CONC. SIDEWALK

(TYP.)

STEEL STRUCTURAL PLATE

PIPE-ARCH CULVERT

FLOW

SECTION A-A - EXISTING

FEET32101

SCALE: 3/8" = 1'-0"

1'-4"�

SPANDREL

WALL

1'-4"�

SPANDREL

WALL

RADIAL

DIMENSIONS 16'-6"� CURB/CURB

28'-10"� OUT/OUT

ASPHALT PAVING

FLOW

SECTION A-A - PROPOSED

FEET32101

SCALE: 3/8" = 1'-0"

1'-4"�

SPANDREL

WALL

1'-4"�

SPANDREL

WALL

SUBBASE

STEEL STRUCTURAL PLATE

PIPE-ARCH CULVERT

V A

R I

E S

V A

R I

E S

L V

E R

T

(TYP.)

CONC. CAP

4" REINF.

METAL PEDESTRIAN

RAILING (TYP.)

L V

E R

T

VARIES 5'-5"�

TO 5'-3 1/2"�

1'-7" CAP

1'-7" CAP

EXPOSED AGGREGATE

REINF. CONCRETE

SIDEWALK (TYP.)

4'-10" 4'-10"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F il e P a th

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseStampConsultants

321 4 5 6 7 8 9 10

CEMETERY

INDIANTOWN GAP NATIONAL

LEBANON COUNTY, PA

VA 813-028

02.18.2022 # Revisions Date

Sprinkler StatusHONOR ENGINEER COMPANY

HARRISBURG, PA

(717) 533-9077

MABBETT & ASSOCIATES, INC.

STONEHAM, MA

(781) 275-6050

PENNONI ASSOCIATES INC.

MECHANICSBURG, PA

(717) 620-5925

COMMANDER'S CONCEPTS COMMISSIONING

FOREST, VA

(713) 492-1922

AQUA ENGINEERING, INC

FORT COLLINS, CO

(970) 372-6104

BARBER & HOFFMAN, INC.

CRANBERRY TOWNSHIP, PA

(724) 741-0848

Architect/Engineer of Record

AE Works, LTD.

418 Beaver Street

Sewickley, PA

Phone: 412-287-7333 www.ae-works.com

THE LA GROUP

SARATOGA SPRINGS, NY

(518) 587-8100 p e n n o n i.

c o m \d a ta \A c c o u n ts \A

E W

L A \A

E W

L A V

A I n d ia n to w n G a p C e m e te ry \D

E S

IG

N \C

T \D

G N \F

IN

A L \0

-B

R -G

A P -R

E V -0

-1

-2

.d g n

INTEGRITY FEDERAL SERVICES

MARTINSBURG, WV

(304) 725-8456

AE WORKS®

RFP DOCUMENTS

PHASE 5 DEVELOPMENT

REGISTERED

AI

N A

VYS

N

N E

P

L

C O

M

M

O NWEALT

H O

F

PROFESSIONAL

WILLIAM DURYEA CAMERON

No. PE37283E

ENGINEER

02-18-2022 DWG 168 of 302

BR101AE WORKS®

F L

O W

ASAWDC

STEEL STRUCTURAL PLATE PIPE-ARCH CULVERT REPAIR

OVER TRIBUTARY TO AIRE RUN (SOUTHWEST CULVERT)

BRIDGE NO.2

(FULL LENGTH)

SEDIMENT DEPOSIT

PIPE-ARCH

STRUCTURAL PLATE

ELEVATION

2 4 FEET20

SCALE: 1/4" = 1'-0"

" A

CULVERT

� PIPE-ARCH

5'-6" 5'-6"8'-0"

SPACING

TIE ROD

A

RAILING (TYP.)

METAL PEDESTRIAN

CONC. CAP (TYP.)

DYED REINFORCED

8'-0"

1.

2.

3.

4.

5.

6.

7.

16.

18.

19.

20.

24.

17.

DESIGN IS IN ACCORDANCE WITH THE LRFD METHOD WHEN APPLICABLE.

PROVIDE 2-INCH CONCRETE COVER ON REINFORCEMENT BARS, EXCEPT AS NOTED.

A HIGHER CLASS CONCRETE MAY BE SUBSTITUTED FOR A LOWER CLASS CONCRETE

STANDARD BRIDGE CONSTRUCTION (BC-700M SERIES) DRAWINGS.

THE FOLLOWING LEGEND APPLIES TO ALL DRAWINGS:

R.F. = REAR FACE

E.F. = EACH FACE

T. = TOP

BOT. = BOTTOM

F.F. = FRONT FACE

DESIGN SPECIFICATIONS:

DESIGN LIVE LOADS:

STRUCTURAL STEEL:

AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 2017, AND AS SUPPLEMENTED

PROVIDE REINFORCING STEEL BARS MINIMUM EMBEDMENT AND SPLICE LENGTHS IN

DO NOT CONSIDER ANY OF THE DATA ON THE EXISTING STRUCTURE MADE AVAILABLE

OF ANY OF THE CONDITIONS THAT YOU WILL ENCOUNTER IN THE FIELD.

APPLY AN APPROVED EPOXY ADHESIVE, WHERE AN ADHESIVE IS SPECIFIED.

21.

22.

PROVIDE STRUCTURAL STEEL CONFORMING TO AASHTO M270 GRADE 36 DESIGNATION,

EXCEPT WHERE NOTED OTHERWISE.

PROVIDE GRADE 60 REINFORCING STEEL BARS THAT MEET THE REQUIREMENTS

OF ASTM A615/A615M, A996/A996M OR A706/A706M. DO NOT WELD GRADE 60

REINFORCING STEEL BARS UNLESS SPECIFIED. GRADE 40 REINFORCING STEEL

BARS MAY BE SUBSTITUTED WITH A PROPORTIONAL INCREASE IN CROSS-SECTIONAL

AREA, IF APPROVED. DO NOT USE RAIL STEEL A996/A996M REINFORCEMENT

BARS IN BRIDGE ABUTMENTS, OR WHERE BENDING OR WELDING OF THE

REINFORCEMENT BARS IS INDICATED.

NOT PERMITTED UNLESS SPECIFIED.

THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE SAFE ERECTION OF ALL

STRUCTURAL COMPONENTS. PROVIDE ALL NECESSARY BRACING AND SUPPORTS.

APPLY AN EPOXY ADHESIVE BETWEEN ALL EXISTING STONE MASONRY AND

STRUCTURAL STEEL IN ACCORDANCE WITH PUBLICATION 408, SECTION 1060.

8.

APPLY PAINT IN A MANNER SO NO PAINT IS PLACED ON SURROUNDING STONE

USE CLASS AA CEMENT CONCRETE.

UTILITY NOTE:

COORDINATE, LOCATE AND CONDUCT ALL WORK RELATED TO PUBLIC AND

PRIVATE UTILITIES IN ACCORDANCE WITH PUBLICATION 408/2020,

SECTIONS 105.06 AND 107.12.

23.

PROVIDE MATERIALS AND PERFORM WORK IN ACCORDANCE WITH PENNDOT

SPECIFICATIONS PUBLICATION 408/2020, AASHTO/AWS/D1.5:2008 BRIDGE

WELDING CODE, AND CONTRACT SPECIAL PROVISIONS.

BY THE DEPARTMENT'S DESIGN MANUAL, PART 4, DECEMBER 2019.

PHL-93, P-82, AND P2016-13

AT NO ADDITIONAL COST TO THE VA, IF APPROVED.

TO YOU BY THE VA OR ITS AUTHORIZED AGENTS AS POSITIVE REPRESENTATIONS

BY THE VA. SUBMIT PAINT COLOR.

MASONRY.

CONSTRUCTION DETAILS OTHER THAN THOSE SHOWN WILL CONFORM TO THE DEPARTMENT'S

GENERAL NOTES:

ACCORDANCE WITH STANDARD DRAWING BC-736M, UNLESS OTHERWISE INDICATED.

WELDING OF REINFORCEMENT BARS DURING FABRICATION OR CONSTRUCTION IS

PAINT ALL STEEL AND METAL FASTENERS WITH PAINT OF A COLOR APPROVED

GALVANIZE FABRICATED STRUCTURAL STEEL, THEN PAINT EXPOSED FABRICATED

CURB (TYP.)

CONC. DRAINAGE

BRUSH

BRUSH

N

REPAVING

LIMIT OF ROADWAY

CULVERT

� PIPE-ARCH

�"4-'04

LLAW LERDNAPS HTRON

�"8-'34

LLAW LERDNAPS HTUOS

2 4 FEET20

SCALE: 1/4" = 1'-0"

PLAN

(TYP.)

GEOTEXTILE MATERIAL

ROCK, R-4 BACKED WITH

ENDWALL (TYP.)

WITH CONC OUTLET

6" DIA. FOUNDATION DRAIN

(TYP.)

SIDEWALK TRANSITION

ADA COMPLIANT

POLE

FLAG

(TYP.)

TIE-ROD

(TYP.)

TO DELINEATE CURBS

WHITE LINE STRIPING

(TYP.)

4'-0"

(TYP.)

GEOTEXTILE MATERIAL

ROCK, R-4 BACKED WITH

9'-9" CLR.

(PIPE ARCH)

R B

C U

R B

T

O U

T

FROM STONE FACE

EXTEND MORTAR TO 1"

REPOINT STONE MASONRY,

9'-9" SPAN

(SOUTHWEST CULVERT)

TRIBUTARY TO AIRE RUN

BRIDGE REPAIR - BRIDGE NO. 2 OVER

B

B

CFS

CFS CFS

CFS

NOTE: CFS DENOTES COMPOST FILTER SOCK

CFS

CFS

CFS

CFS

DECORATIVE PLATE (TYP.)

DIA. TIE-ROD WITH 12" DIA.

LATERAL BRACING TIE- ROD, 1"

11.

13.

14.

15.

RAKE FINISH ALL HORIZONTAL CONSTRUCTION JOINTS, EXCEPT AS INDICATED.

ALL DIMENSIONS SHOWN ARE HORIZONTAL, EXCEPT AS NOTED.

SUPERSTRUCTURE DIMENSIONS SHOWN ARE FOR A NORMAL TEMPERATURE OF 68

DEGREES FAHRENHEIT.

CHAMFER EXPOSED CONCRETE EDGES 3/4 INCH BY 3/4 INCH, EXCEPT AS NOTED.

12.

10.

FIELD AS NECESSARY FOR PROPER FIT OF THE PROPOSED CONSTRUCTION.

VERIFY ALL DIMENSIONS AND GEOMETRY OF THE EXISTING STRUCTURE IN THE

9. EPOXY COAT ALL REINFORCING BARS AND WELDED WIRE FABRIC (WWF),

UNLESS NOTED.

COATED REINFORCING STEEL BARS AT NO ADDITIONAL COST TO THE OWNER.

GALVANIZED REINFORCING STEEL BARS AND WWF MAY BE SUBSTITUTED FOR EPOXY

APPLY A TOOLED EDGE TO SIDEWALK.

JOINTS.

PROPOSED CEMENT CONCRETE AND AT ALL CEMENT CONCRETE CONSTRUCTION

CONCRETE FOR SIDEWALK (TYP.)

USE DYED EXPOSED AGGREGATE

WITH REINFORCED CONCRETE.

REPLACE SIDEWALK AND CURB

RADIAL

DIMENSIONS 16'-4"� CURB/CURB

29'-2"� OUT/OUT

ASPHALT PAVING

EXPOSED AGGREGATE

CONC. SIDEWALK

(TYP.)

STEEL STRUCTURAL PLATE

PIPE-ARCH CULVERT

FLOW

SECTION A-A - EXISTING

FEET32101

SCALE: 3/8" = 1'-0"

1'-5"�

SPANDREL

WALL

1'-5"�

SPANDREL

WALL

RADIAL

DIMENSIONS 16'-8"� CURB/CURB

29'-2"� OUT/OUT

ASPHALT PAVING

FLOW

SECTION A-A - PROPOSED

FEET32101

SCALE: 3/8" = 1'-0"

1'-5"�

SPANDREL

WALL

1'-5"�

SPANDREL

WALL

SUBBASE

STEEL STRUCTURAL PLATE

PIPE-ARCH CULVERT

V A

R I

E S

V A

R I

E S

L V

E R

T

(TYP.)

CONC. CAP

4" REINF.

METAL PEDESTRIAN

RAILING (TYP.)

L V

E R

T

1'-8" CAP

1'-8" CAP

EXPOSED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .