S02_UPGRADE CATH LAB 4_ FINAL CDs_SPEC VOL 1_01 31 2025r_316 Pages.pdf
PDF 5 MB Posted
- Attached to
- Z1DA--PN: 618-CSI-230, Upgrade Cath Lab (MPLS)
- Solicitation number
- 36C26325B0017
About this file
This file is a comprehensive construction document for the VA Medical Center Minneapolis Cath Lab #4 Upgrade Project (Project Number 618-CSI-230), dated January 31, 2025. The project involves renovating an existing Cardiac Catheterization Lab located at 1 Veterans Drive in Minneapolis, Minnesota, with construction documents spanning multiple volumes and divisions. The specifications detail technical requirements for a complete facility upgrade, including architectural, structural, mechanical, electrical, and specialized medical infrastructure modifications.
The documents cover extensive technical specifications across 13 divisions, including non-structural metal framing, gypsum board installation, resinous flooring, door hardware, and radiation protection. Key elements include lead-lined doors, specialized medical gas systems, electrical upgrades, and comprehensive infection control measures. The project requires precise phasing, with specific attention to maintaining Cath Lab #3's operational status during construction. The upgrade involves installing new imaging equipment, modifying existing spaces, and ensuring minimal disruption to the medical center's ongoing operations. Construction documents are prepared by Dunham Engineering and include detailed drawings, technical specifications, and comprehensive installation requirements for each project component.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA MEDICAL CENTER MINNEAPOLIS
Upgrade Cath Lab #4
Project 618-CSI-230
CONSTRUCTION DOCUMENTS
January 31, 2025
SPECIFICATIONS
Volume I
Divisions 00 – 13
13605 1st Avenue North, Suite 100, Plymouth, MN 55441
Prepared in association with:
Dunham Engineering
VAMC Minneapolis VA Project# 618-CSI-230
Upgrade Cath Lab #4 01-31-2025 1 Veterans Drive CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
CERTIFICATIONS PAGE
Architect:
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota
Signature ____________________
Typed or Printed Name: _________________________
Date: ___________________
License Number: __________________
Professional Engineer: (Structural) or under my direct supervision and that I am a duly Licensed Professional
Engineer under the laws of the state of Minnesota
Date: ____ ________
Professional Engineer: (Mechanical)
Date: ___ ________
Tom Olesak 01/31/2025
18157
08/222024
Jason R. Gottwalt, P.E.
41360
Adam Adams
49318
__________01/31/2025
__________01/31/2025
01-31-2025
Upgrade Cath Lab #4 08-22-2024
1 Veterans Drive CONSTRUCTION DOCUMENTS
Professional Engineer: (Electrical)
Signature _ ____
Typed or Printed Name: ____
Date: ____ _______
License Number: ___ __________
- - - END - - -
__________01/31/2025
01-31-2025
Jiun Yih Kam
51923
1 Veterans Drive CONSTRUCTION DOCUMENTS
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21
01 33 23 Shop Drawings, Product Data, and Samples 02-23
01 33 23.01 Submittal Register
01 33 24 Electronic Submittal Procedures
01 35 26 Safety Requirements 10-22
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Selective Demolition 08-17
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY (NOT USED)
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames
08 71 00 Door Hardware
00 01 10-2
08 71 13 Automatic Door Operators 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories
09 67 23.20 Resinous Flooring
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 26 00 Wall and Door Protection 01-21
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
12 31 00 Manufactured Metal Casework
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION
13 49 00 Radiation Protection 01-21
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 11 00 Facility Water Distribution 05-21
22 13 00 Facility Sanitary and Vent Piping 09-20
22 40 00 Plumbing Fixtures 12-22
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities
22 63 00 Gas Systems for Laboratory and Healthcare Facilities
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 03-23
00 01 10-3
23 09 23 Direct-Digital Control System for HVAC 03-23
23 21 13 Hydronic Piping 03-23 23 31 00 HVAC Ducts and Casings 03-23
23 36 00 Air Terminal Units 03-23
23 37 00 Air Outlets and Inlets 03-23
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 05 36 Wireways for Radiology Equipment 11-22
26 05 53 Identification for Electrical Systems
26 05 73 Overcurrent Protective Device Coordination Study 11-22
26 08 00 Commissioning of Electrical Systems 11-22
26 09 23 Lighting Controls 11-22
26 24 16 Panelboards 11-22
26 27 26 Wiring Devices 11-22
26 29 21 Enclosed Switches and Circuit Breakers 11-22
26 51 00 Interior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 10 00 Control, Communication and Signal Wiring 06-15
27 15 00 Communications Structured Cabling 01-16
27 52 23 Nurse Call and Code Blue Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
00 01 15 - 1
LIST OF DRAWING SHEETS
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI002 ABBREVIATIONS
GI131 THIRD LEVEL LIFE SAFETY PLAN
GC131 THIRD LEVEL INFECTION CONTROL & PHASING PLANS
GC132 THIRD LEVEL CONSTRUCTION ACCESS ROUTE
ARCHITECTURAL
AD131 THIRD LEVEL DEMOLITION PLAN
AD132 THIRD LEVEL REFLECTED CEILING DEMOLITION PLAN
AE131 THIRD LEVEL FLOOR PLAN
AE132 THIRD LEVEL REFLECTED CEILING PLAN
AE211 INTERIOR ELEVATIONS
AE601 INTERIOR PARTITION TYPES, DOOR SCHEDULE AND
DETAILS
AF101 FINISH PLAN, FINISH SCHEDULE, & FINISH DETAILS
QH130 THIRD LEVEL EQUIPMENT PLAN AND SCHEDULE
STRUCTURAL
S001 NOTE SHEET
S101 THIRD LEVEL FLOOR FRAMING PLAN
S201 THIRD LEVEL INTERSTITIAL FRAMING PLAN
MECHANICAL
M000 MECHANICAL TITLE SHEET
MHD103 THIRD LEVEL DEMOLITION HVAC PLAN
MH103 THIRD LEVEL HVAC PLAN
MH103.1 THIRD LEVEL INTERSTITIAL HVAC PLAN (FOR DUCT
CLEANING)
M200 MECHANICAL DETAILS AND SCHEDULES
00 01 15 - 2
LIST OF DRAWING SHEETS
PLUMBING
PPD103 THIRD LEVEL DEMOLITION PLUMBING PLAN
FX103 THIRD LEVEL FIRE PROTECTION PLAN
PP103 THIRD LEVEL MEDICAL GAS PLAN
PP103.1 THIRD LEVEL INTERSTITIAL PLUMBING/ MEDICAL GAS
P200 PLUMBING DETAILS AND SCHEDULES
ELECTRICAL
E001 ELECTRICAL TITLE SHEET
E131 ELECTRICAL ORIENTATION PLAN
EL131 THIRD LEVEL ELECTRICAL LIGHTING PLAN
EP131 THIRD LEVEL ELECTRICAL POWER PLAN
ES131 THIRD LEVEL ELECTRICAL SYSTEMS PLAN
E300 ELECTRICAL ONE LINE DIAGRAM
E500 ELECTRICAL DETAILS
E600 ELECTRICAL SCHEDULES
- - - E N D - - -
1 Veterans Drive CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - i
GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 GENERAL INTENTION
1.2 STATEMENT OF BID ITEM(S)
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.4 construction security requirements
1.5 FIRE SAFETY
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 INFECTION PREVENTION MEASURES
1.9 DISPOSAL AND RETENTION
1.10 PCB Transformers and Capacitors: Not Applicable
1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.12 RESTORATION
1.13 PHYSICAL DATA – Not used
1.14 PROFESSIONAL SURVEYING SERVICES – Not used
1.15 LAYOUT OF WORK – Not used
1.16 As-Built Drawings
1.17 USE OF ROADWAYS
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.19 TEMPORARY USE OF EXISTING ELEVATORS
1.20 TEMPORARY USE OF NEW ELEVATORS – Not used
1.21 TEMPORARY TOILETS
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
1.23 NEW TELEPHONE EQUIPMENT
1.24 TESTS
1.25 INSTRUCTIONS
1.26 GOVERNMENT-FURNISHED PROPERTY
1.27 RELOCATED EQUIPMENT
1 Veterans Drive CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - ii
GENERAL REQUIREMENTS
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT – Not
Used 30
1.29 CONSTRUCTION SIGN – NOt used
1.30 SAFETY SIGN – Not used
1.31 CONSTRUCTION DIGITAL IMAGES – Not used
1.32 FINAL ELEVATION Digital Images – Not used
1.33 HISTORIC PRESERVATION
1.34 COMPLETION TIME
1.35 SCHEDULES
1.36 LIQUIDATED DAMAGES- Not used
1.37 CONTRACTOR’S COST BREAKDOWN (SCHEDULE OF VALUES)
1.38 SUBCONTRACTORS
1.39 MINIMUM HOURLY RATES OF WAGES
1.40 FIELD QUALITY CONTROL
1.41 KEYS AND BADGES
1.42 MSDS BOOK
1.43 LOCKOUT / TAGOUT
1.44 CONFINED SPACE ENTRY
1.45 PROHIBITION ON ASBESTOS-CONTAINING MATERIALS
Upgrade Cath Lab #4 02-23-2024
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 1
GENERAL REQUIREMENTS
SECTION 01 00 00
1.1 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Contracting Officer.
C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
D. Prior to commencing work, general contractor shall provide proof that a
30 Hour OSHA certified “competent person” will maintain a presence at the work site whenever the general or subcontractors are present.
E. Training:
1. All employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training, as determined by VA CP with input from the ICRA team.
2. Submit training records of all such employees for approval before the start of work.
F. Confined Space Training:
1. The VA Medical Center Property has been surveyed for Permit
Required Confined Spaces. An inventory of the spaces including the hazards and entry procedures are available from the Safety
Manager. Entry may be required for the installation of electrical systems, controls, plumbing, pipe fitting and insulation as part of the project scope.
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 2
2. Contractor shall be trained in confined space entry prior to entering confined space. Submit training records of all such employees for approval before start of work.
1.2 STATEMENT OF BID ITEM(S)
A. Contractor shall provide tools, materials and labor necessary for completion of construction project #618-CSI-230 “Upgrade Cath Lab #4” at the Minneapolis VA Healthcare System in Minneapolis, Minnesota and in accordance with the drawings and specifications.
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. AFTER AWARD OF CONTRACT, Specifications and drawings will be furnished electronically on a compact disk. Drawing and specification will be in
Adobe PDF format.
B. Hard Copy drawings and specifications may be made by the Contractor, at the Contractor’s expense, from electronic files furnished by the
Issuing Contracting Officer.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 3
2. For working outside the “regular hours” as defined in the contract, the General Contractor shall give 3 day notice to the
Project Manager so that security/escort arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Each contractor or subcontractor employee shall obtain a security clearance from the
VA Medical Center. Obtaining a security clearance will require each contractor and/or subcontractor employee to report to the
Facilities Engineering Project Section to complete paperwork and visit Human Resource Management for finger printing. When the employee has been cleared to work at the Medical Center, the employee shall return to have a picture taken and will be issued a badge at that time. Employees must schedule appointments with a Facilities Engineering Project Manager prior to arriving on site to complete security clearance paperwork. This process could take up to thirty days.
4. No photography of VA premises is allowed without written permission of the Contracting Officer.
5. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting
Officer.
C. Guards: Not used
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Project Manager for the purpose of security
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 4 inspections of every area of project including tool boxes and parked machines and take any emergency action.
E. Document Control:
1. Before starting any work, the General Contractor/Subcontractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive
Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering
Document Management Software (EDMS).
a. Security, access, and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 5
b. ”Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Contractor’s vehicles and workers vehicles are to be parked in
Employee Parking lots. Coordinate with Project Manager.
2. Shipping/Receiving dock parking; access shall be restricted to picking up and dropping off materials and supplies.
1.5 FIRE SAFETY
A. Applicable Publications: Publications listed below form part of this
Article to extent referenced. Publications are referenced in text by basic designations only. The most recent versions of each publication apply.
1. American Society for Testing and Materials (ASTM):
E84...............Surface Burning Characteristics of Building
Materials
2. National Fire Protection Association (NFPA):
10................Standard for Portable Fire Extinguishers
30................Flammable and Combustible Liquids Code
51B...............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
70................National Electrical Code
101……………………………..Life Safety Code
241...............Standard for Safeguarding Construction, Alteration, and Demolition Operations
3. Occupational Safety and Health Administration (OSHA):
29 CFR 1926.......Safety and Health Regulations for Construction
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 6
B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to the COR for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA AND SAMPLES. Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc.
Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.
C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).
E. Temporary Construction Partitions:
1. Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas and adjoining areas. Construct partitions of gypsum board or treated plywood
(flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire-retardant treated wood or metal steel studs. Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install Class C, ¾ hour fire/smoke rated doors with self-closing devices.
2. Install fire-rated temporary construction partitions as shown on drawings to maintain integrity of existing exit stair enclosures, exit passageways, fire-rated enclosures of hazardous areas, 1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 7 horizontal exits, smoke barriers, vertical shafts and openings enclosures.
3. Close openings in smoke barriers and fire-rated construction to maintain fire ratings. Seal penetrations with listed through-penetration firestop materials in accordance with Section 07 84
00, FIRESTOPPING.
F. Temporary Heating and Electrical: Install, use, and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.
G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with the Project Manager.
H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to the COR.
I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA
241 and NFPA 10.
J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.
K. Sprinklers: Install, test, and activate new automatic sprinklers prior to removing existing sprinklers.
L. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections.
Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with paragraph 1.6, OPERATIONS AND STORAGE AREAS, and coordinate with Project Manager. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 8
M. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with Project
Manager.
N. Hot Work: Perform and safeguard hot work operations in accordance with
NFPA 241 and NFPA 51B. Coordinate with Project Manager. Obtain permits from Project Manager the morning the work is to be completed, provide 24 hr. notice when possible. Designate contractor's responsible project-site fire prevention program manager to permit hot work.
O. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to Project Manager.
P. Smoking: Smoking is prohibited on the entire Minneapolis VAMC campus.
Q. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.
R. Perform other construction, alteration, and demolition operations in accordance with 29 CFR 1926.
S. If required, submit documentation to the COR that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 9 completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by the CORwhere required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
All storage locations must be approved by project COR.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation. There is currently minimal storage space available within the medical center. Contractors should plan for
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 10 alternate storage outside the medical center. Storage boxes will be allowed on VA Grounds or back parking lots with prior approval.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
4. All materials stored on VA Premises must be labeled with contractor name, point of contact, telephone number, project title, date of storage, and project COR.
G. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined must include, but not be limited to:
2. To ensure such executions, Contractor must furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor must notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and
Contractor, as follows:
Phase 1: This phase is required to setup a clear separation of construction activities from Cath Lab #3 (3J-143) which will remain in operation during normal business hours and during emergencies. The temporary construction partition in Suite Passageway shall be built during the weekend or nights. The door to 3J-141 must be sealed tight and remain airtight. Room 3J-139 will become temporary storage for materials moved out of the existing spaces during construction.
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 11
Another construction barrier/wall should be built to separate the storage room from the new construction access hallway. The existing doors into 3J-139 shall become the construction if they can be made airtight otherwise the contractor shall provide other temporary doors that meet the ICRA standards. The casework in front of the temporary wall opening can be removed and carefully salvaged during this phase.
The casework will need to be reinstalled after the Cath Lab #4 construction is complete.
Phase 2: Once the temporary wall opening is made and the construction zone preparations are done then the main construction activities can begin in Cath Lab#4 and adjacent areas as show in the plans. The contractor must coordinate with the VA COR what fixed equipment (i.e.
Light or Equipment Booms) should remain during construction and take measures to protect the equipment. If the contractor and VA feel it’s necessary, some of the fixed equipment may need to be removed and stored during construction. The contractor should perform the removal and reinstallation of this equipment unless stated otherwise by the VA.
The main imaging equipment removal shall happen first and will be removed by the imaging vender. The remaining demolition and construction should happen in the appropriate sequence as planned by the contractor with VA CORs approval. Any loud or disruptive vibration work shall be done after normal Cath Lab operation hours and should be coordinated with VA COR.
Phase 3: Once all construction is complete the imaging vender will install the new cath lab imaging equipment. The contractor is responsible to maintain a safe construction zone during equipment installation and must coordinate all activities with the imaging vender and VA COR at this time. Once the equipment installation is complete along with all construction the temporary wall opening can be filled in and the construction barriers in 3J-139 and C3-84 can be removed.
Phase 4: The final phase is reinstallation of casework, any wall mounted items, and restoration of finishes in 3J-139 so the room can be returned to the original state.
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 12
H. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of Project
Manager. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without an Energized Circuit Permit issued by the Project Manager.
2. Contractor shall submit a request to interrupt any such services to the COR, in writing, 25 days in advance of proposed interruption. Request shall be on the attached “Shutdown
Request” form and include all requested information.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center.
Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 25 calendar days prior to the desired time and shall be performed as directed by the Project Manager.
5. In case of a contract construction emergency, service will be interrupted on approval of Project Manager. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 13 project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the
Government and not the Contractor.
I. Abandoned Lines: All unused service lines shall be demolished to the source unless approved by the COR. All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
J. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the
Project Manager.
K. Coordinate the work for this contract with other construction operations as directed by the COR. This includes the scheduling of traffic and the use of roadways, as specified in paragraph 1.16, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of areas of buildings in which alterations occur and areas which are anticipated routes of access, Project
Manager, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 14
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and Project
Manager.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of
Project Manager, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly.
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and Project Manager together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures;
and will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 15
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 INFECTION PREVENTION MEASURES
A. Implement the requirements of VAMC’s Infection Control Risk Assessment
(ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.
B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to the COR for review for compliance with contract requirements in accordance with Section 01 33
23, SHOP DRAWINGS, PRODUCT DATA SAMPLES.
1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.
C. Medical center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 16 determine impact of construction activities on indoor air quality. In addition:
1. The COR and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the construction zone shall depend on the location and type of activity. Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.
2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.
D. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.
1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by the COR. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction.
2. Do not perform dust producing tasks within occupied areas without the approval of the COR. For construction in any areas that will remain jointly occupied by the medical Center and Contractor’s workers, the Contractor shall:
a. Provide dust proof fire-rated temporary drywall construction barriers to completely separate construction from the operational areas of the hospital in order to contain dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied side. Install a self-closing rated door in a metal frame, commensurate with the partition, to allow worker access. Maintain negative air at all times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 17 control is the only hazard, and an agreement is reached with the COR and Medical Center.
b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings. Install HEPA
(High Efficiency Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles. Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other prefilter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center.
c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 600mm x 900mm
(24” x 36”), shall be used at all interior transitions from the construction area to occupied medical center area. These mats shall be changed as often as required to maintain clean work areas directly outside construction area at all times.
d. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday.
Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently. Remove debris as they are created.
Transport these outside the construction area in containers with tightly fitting lids.
e. The contractor shall not haul debris through patient-care areas without prior approval of the Project Manager and the
Medical Center. When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 18 be made free from dust and moisture by vacuuming and wipe down.
f. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.
g. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.
h. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.
E. Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.
2. Interstitials: After all construction materials and disposable materials have been removed from the interstitial spaces, the contractor shall vacuum the interstitial floors within the construction limits of the project.
3. Mechanical Rooms: At the completion of the project, remove all construction related materials and disposable debris from the mechanical rooms used during construction. Relocate attic stock to areas designated by the COR. Sweep and mop entire mechanical room floors.
4. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 19
1.9 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored.
Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse.
Store such items where directed by the COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor .
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.10 PCB TRANSFORMERS AND CAPACITORS: NOT APPLICABLE
1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 20
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to paragraphs 1.6 Operations and Storage Areas, 1.7
Alterations, 1.11 Restoration for additional instructions concerning repair of damage to structures and site improvements.
1.12 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
Project Manager. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the Project
Manager before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 21 existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with the FAR.
1.13 PHYSICAL DATA – NOT USED
1.14 PROFESSIONAL SURVEYING SERVICES – NOT USED
1.15 LAYOUT OF WORK – NOT USED
1.16 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR's review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings to the Project Manager within 15 calendar days after each completed phase and after the acceptance of the project by the Project
Manager.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.17 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed by the Contractor at Contractor's expense.
When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building
1 Veterans Drive 100% CONSTRUCTION DOCUMENTS
Minneapolis, MN 55417
01 00 00 - 22 operations. These roads may be used by all who have business thereon within zone of building operations.
C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to compliance with the following provisions:
1. Permission to use each unit or system must be given by Project
Manager. If the equipment is not installed and maintained in accordance with the following provisions, the Project Manager will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e.
transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded.