Copy of AS06JV RFIs MNVA Cath Lab.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Z1DA--PN: 618-CSI-230, Upgrade Cath Lab (MPLS)
- Solicitation number
- 36C26325B0017
About this file
This file is a Solicitation Questions and Answers document for a VA Cath Lab Upgrade project (Solicitation Number: 36C26325B0017) located in Minneapolis. The Q&A document covers multiple technical and logistical aspects of the project, including critical details about equipment installation, phasing, and responsibilities. Key highlights include specific requirements for project personnel (noting that the Superintendent, Safety and Health Officer, and Quality Control Manager must be separate individuals), installation responsibilities for Canon medical equipment, and coordination requirements with Canon representatives for on-site equipment placement. The project involves upgrades to Cath Lab #3 and #4, with strict phasing restrictions that prevent simultaneous construction in both labs, and involves specialized medical equipment installation including longitudinal ceiling rails, radiation shield mounting tracks, and various medical system components like uninterruptible power systems, battery systems, and medical equipment rack cabinets.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Solicitation Questions and Answers
| # | SOW Reference | Question | Answer |
| 1 | 01 35 26 | Does this project require a full time SSHO with no other duties separate from the project superintendent? Can the superintendent be the SSHO for this project? | Per Spec 01 35 26 section 1.6C the Superintendent, SSHO, and Quality Control Manager CANNOT be the same person. |
| 2 | 01 35 26 | Can the General Contractor's superintendent be the Quality Control Manager for this project? | Per Spec 01 35 26 section 1.6C the Superintendent, SSHO, and Quality Control Manager CANNOT be the same person. |
| 3 | S02_6__Attachment | Can the VA resend S02_6__Attachment+1+Single+Source+Justification+MPT+to+SAT+-+Electrical+Distribution+Panels+signed+Redacted. It seemed to have a problem when we downloaded it. | Download as a zip file |
| 4 | ICRA Phasing Plan | Will we be able to do multiple phases at one time? | No. Construction for the door in Cath Lab #3 cannot occur simultaneously with the construction in Cath Lab #4. |
| 5 | S-201 | Canon Longitudinal Ceiling Rail Mounted to existing Unistrut framing. Is this something that NXL/Canon will be installing or is this installed by GC? | NXL/Canon would provide and install the Canon Longitudinal Ceiling Rail. NXL/Canon will also mount the Canon Longitudinal Ceiling Rail to the Existing Unistrut Faming. |
| 6 | S-201 | Radiation shield Mounting track mounted to existing Unistrut framing. Is this something that NXL/Canon will be installing or is this installed by GC? | NXL/Canon would provide and install the Radiation Shield Mounting Track. NXL/Canon will also mount the Radiation Shield Mounting Track to the existing Unistrut Framing. |
| 7 | Canon Drawings | When will the Items supplied by Canon be delivered for contractors to install? |
a. USP Eaton 93PM-100 Uninterruptible power System (480V)?
b. BAT Eaton Battery?
c. RMD Remote Monitoring Device (for UPS)?
d. CAT CAT-880B table Base?
e. RACK Control/Power Rack cabinet with floor anchorage bracket?
f. DFP System Rack cabinet with floor anchorage bracket?
g. UST P1001 Unistrut?
| h. ACC – (2) 24x24 access panels for CAS-830B? | Once Canon has the consturction schedule from the contracto, Canon will align deliveries. USP Eaton 93PM-100 Uninterruptible power System (480V) delivery is 2 weeks prior to VL System. BAT Eaton Battery delivery is 2 weeks prior to VL System. RMD Remote Monitoring Device (for UPS) delivery is 2 weeks prior to VL System. CAT CAT-880B table Base delivery is with main VL System. RACK Control/Power Rack cabinet with floor anchorage bracket, Canon will supply the cabinent anchors. DFP System Rack cabinet with floor anchorage bracket, Canon will supply the cabinent anchors. UST P1001 Unistrut will have to supplied by the contractor. ACC – (2) 24x24 access panels for CAS-830B is supplied by the contractor. | ||||
| 8 | Canon Drawings A-1 | Will the VA be providing Physiological Equipment per Canon drawings on sheet A1? | Refer to the construction drawings. The physiological equipment is on the equipment schedule in the construction drawings. | ||
| 9 | Canon S-1 | Per sheet S1 of canon drawings says to coordinate locations with Canon, will there be canon guy on site or will we have to schedule this with them to review locations on site? | The general contractor will have to schedule a meeting with Canon for them to review the locations on site. | ||
| 10 | Structural Engineer | What kind of anchors will be required for the ¾” Rod hangers? All the canon drawings state we must meet the anchorage hardware per the structural engineer of record. | S201 calls for the ¾” dia. rod hangers. Detail 1/S201 shows the rod attaching to |
a 4” section of steel tube with a nut and washer, the steel tube is welded to the existing interstitial beam. Additionally, detail 2/S201 shows the top of the hanger rod connecting with a coupler to the threaded rod anchor that is drilled and epoxied into the existing concrete beams
| 11 | QH-130 | QH130 – On the equipment schedule who is responsible for all the relocated items? | The VA Biomed and Cath Lab Staff is resposible for all the relocated items. |
| 12 | Div 21 | What Fire Sprinkler work is required for this project? Doesn’t seem like much is changing, do we need to turn head up in Equipment 3J-140A? If we demo out and install new on the same day, do we need to turn heads up? | Refer to the construction drawings to see the required fire sprinkler work. |
| 13 | |||
| 14 | |||
| 15 | |||
| 16 | |||
| 17 | |||
| 18 | |||
| 19 | |||
| 20 | |||
| 21 | |||
| 22 | |||
| 23 | |||
| 24 | |||
| 25 | |||
| 26 |