RFQQ 2631 Attach D Answers UWMC MTLK Part9.pdf
PDF 4 MB Posted
- Attached to
- FIRE SPRINKLER SYSTEM TESTING AND INSPECTION
- Solicitation number
- UWM 2631
- Issued by
- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This document is a government file related to a state and local contract opportunity issued by UW Medicine for Automatic Fire Sprinkler System Testing & Inspection at Harborview Medical Center (HMC), UWMC Montlake and UWMC Northwest and its campus buildings. The solicitation covers regular inspections, testing, and maintenance of fire sprinkler systems, as well as other related fire sprinkler services on an as-needed basis. The contract is open to qualified and experienced bidders, and the proposal due date is specified in the RFQQ document rather than the WEBS closing date.
The pricing details, set-asides, incumbents, and funding sources are not explicitly provided in the given information. However, the contract opportunity covers a wide geographic area across multiple counties and cities in the state of Washington, indicating a comprehensive statewide or regional scope.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
At Churn Check the circulation relief valve for_ operation to discharge water (8.3.3.2)
Jj Check the pressure relief valve for proper operation (8.3.3.2)
Record Data .Speed Discharge Suction Net Head Streams Flow Percent of (rpm) Pressure Pressure (psi) No. Size Pltot (gpm) Rated
(psi) (psi) Pressure Capacity
35SC, )0 7 3 J_ " '--{ ;1 )1/; ~1~~- 'J
'3_55 i Ji:j2 .J._ )S-0 ;J_ :2 '/2 t\J/A ,5 I oc., ssc,1 .2 1~ 'J ;i. .2 '12 µ /A ;2i 1 ·3 \ L2l_; iS'.:) - Pressure Relief Valve
J2f" Did the pressure relief valve operate properly (8.3.3.3 and 8.3.3.3.1)
AutolJ)._atlc Transfer Switch (8.3.3.4)
Volts Amps
A 'f7).. A l(,G-, Bi,{. 7.2 B 11& c,_-,7\ C IW A l.iJC. A .k:JJ B t f 71 B .J. \ \ Ct{)) C ).c, o A L/7C A '7;.!~ BLt 7c a.:,..1t.
C Lf 7~ c :).)({
J3' Simulate power failure condition while the pump Is operating at peak load (Have Electrician disconnect power at:
Normal: SWCB-SA00-E0l Electrical Room SA0008)
ft. Verify that the transfer switch transfers power to the alternate source of power .,..el Verify that the pump continues to perform at peak load
,,- Remove the power failure condition and verify that, after a time delay, the pump Is reconnected to the normal power source.
Jtf' Inspect suction screens and clear any debris . .
Reduced Pressure Backflow Assembly
, e'.I Verify that valves are In the open position (13.6.1.2) jY Reduced Pressure Assembly differential sensing valve relief port Is not continuously discharging water (13.6.1.2)
Comments:
EC.02.03.05, EP-6 Page 2 of2
EC.02.03.05.2
Inspection, Testing, & Maintenance of Water Based Fire Protection Systems University of Washington Medical Center
1959 NE Pacific St, Seattle, WA 98195
(206)598-4911
This form covers a Monthly inspection period per NFPA
25 Tower/location: Muilenburg/Cascade Tower
General: Wet/Dry/Pre-action system inspection shall be inspected to verify the valves are in the normal open or closed position, sealed, locked or supervised, accessible, free from leaks and provided with applicable
Identification.
Valve Location Valve Valve Normal Secured
Feeds Associated Date
Number type positon by Valves Inspected 9200A Roof
09EB914 B TS 9200A None Mech. Rm.
open
S.E. Roof of
09EB915 B TS 9300A N/A
Rm. 9300A open
9th fir. EA2
09EA711 OS&Y TS 9EA,9EC 09EE914
stair open
9th fir. EEl
09EE511 OS&Y TS 9EA,9EC 09EA711
stairs open
7th fir. Ceil by 07EC812 B open TS 7th Fir. Sectional Valve None elev. 212
7th fir. Ceil by 07EC813 B open TS 7th Fir. Sectional Valve None elev. 217
6th fir. Ceil by 06EC815 B open TS 6th Fir. Sectional Valve None elev. 217
6th fir. Ceil by 06EC816 B open TS 6th Fir. Sectional Valve None elev. 212
5th fir. Ceil by 0SEC817 B open TS 5th Fir. Sectional Valve None elev. 212
5th fir. Ceil by 0SEC818 B open TS 5th Fir. Sectional Valve None elev. 217
4th fir. Ceil by 04EC819 B open TS 4th Fir. Sectional Valve None elev. 212
4th fir. Ceil by 04EC820 B open TS 4th Fir. Sectional Valve None elev. 217
3rd fir. EC next 03EC822 B TS 3rd Fir. Sectional Valve None to restrooms open
3rd fir. ECl
03EC821 OS&Y TS 3EA,3EC 03EA717
stair open
2nd fir. ECl
02EC824 B TS 2EA,2EC 02EA718
stair open
2nd fir. Ceil by 02EC825 B open TS 2nd Fir. Sectional Valve N/A
ECl stairs
Pa~e 1 of 14 Sprinkler Valves Monthly -July 2024 Author: Manager FOMS Date: 24.6.11 v.5