RFQQ 2631 Attach D Answers UWMC MTLK Part8.pdf

PDF 4 MB Posted

Attached to
FIRE SPRINKLER SYSTEM TESTING AND INSPECTION
Solicitation number
UWM 2631
Issued by
Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington

About this file

This document is a report related to a state and local contract opportunity for Automatic Fire Sprinkler System Testing & Inspection services at UW Medicine facilities, including Harborview Medical Center (HMC), UWMC Montlake, and UWMC Northwest. The solicitation seeks to establish a pool of qualified and experienced bidders to provide these services on an as-needed basis. The report includes details such as the inspection date, property account, building information, and any identified deficiencies for the UWMC Montlake Tower.

The state and local contract opportunity calls for bidders to provide fire sprinkler system testing and inspection services for the specified UW Medicine facilities located in various jurisdictions across the state of Washington. The contract will be awarded to a pool of qualified bidders, and services will be provided on an as-needed basis. No specific quantities, award dates, or contract term details are provided in the documentation.

View the file

Other files

File Type Posted
RFQQ 2631 Attach D Answers Final.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part1.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part11.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part12.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part4.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part6.pdf PDF
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 1.doc DOC document
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 3.doc DOC document
RFQQ 2631 Attach D Answers HMC Rep.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part14.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part2.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part3.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part5.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part7.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part9.pdf PDF
RFQQ 2631 Attach D Bidders Questions Final.xlsx XLSX spreadsheet
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 2.doc DOC document
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 4.doc DOC document
RFQQ 2631 Attach D Answers UWMC MTLK Part16.pdf PDF
RFQQ 2631 Attach D Answers UWMC NWH Rep.pdf PDF
RFQQ 2631 Attach D Answers Equip.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part10.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part13.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part15.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part17.pdf PDF
RFQQ 2631 FIRE SPR SYSTEM TESTING INSPECT.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report of Inspection/ Test Annual NFPA 25, Annual NFPA 72

2024-01-06 · Conducted by: Mike Sanders - Technician w Property Account

Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Pacific St Seattle Washington 98195 dV ERSlTY to/ WASII ING N Seattle WA 98195 206-598-6247 Print Date: 2024-03·19 sandem3@uw.edu

Inspector Signature

I state that the Information on this form Is correct at the time and place of my Inspection, and all equipment tested at this time was left In operational condition upon completion of this Inspection except as noted.

Inspector Name Signature Date Completed

2024-03-19

Client Signature

I state that the Information on this form Is correct at the time and place of my Inspection, and all equipment tested at this time was left In operational condition upon completion of this Inspection except as noted.

Client Name Signature Date Completed

Mike Sanders 2024-03-19

MA : J½_Q Swluf 5

Copyright 2024 Inspect Point

Report of Inspection / Test Annual NFPA 25, Annual NFPA 72

2024-01-06 Property UWMC • Montlake Tower Bullt 2012 Bulldlng#: 3 1959 NE Pacific St Seattle WA 98195 Print Date: 2024-03-19

Deficiencies ~ UWMC Fire Pump

None I Deficiencies • Fire Pump ATS #14

None

Conducted by: Mike Sanders - Technician Account

University of Washington Medical Center 1959 Ne J:>aclflc Street Seattle Washington 98195 206-598-6247 sandem3@uw.edu

Deficiencies - UWMC - Montlake Tower - Alarm Systems

None

Copyright 2024 Inspect Point w Medicine U1 IVEICI ' Y uf WASIII NGT

Fire Pump Annual Test

University of Washington Medical Center 1959 NE Pacific Street Seattle, WA 98195

Pump Electric driven, horizontal split-case Manufacturer: A-C Fire Pump Systems SN:-10058750101 Model:393H8200 Rated GPM: 750 Rated Head: 601ft (260 psi) Suction from 33,000 Gallon Tank Driver Manufacturer: WEG SN: 10021766 Model: 200360P3G4475 Rated HP: 200 Rated RMP: 3550 Rated Volt: 460 Operating Volt: 380 Rated Amps: 224 Amps @150%: 228 3-Phase, 60 cycle Controller

Inspection {In accordance with Section 8.2 of NFPA 25 (2011 Edition))

J2( Heat is adequate, not less than 40 degrees F ~ Pump suction and dlsc.harge and bypass valves are fully open p' Piping is free of leaks JJ' Suction line pressure gauge Is reading within acceptable range

System line pressure gauge reading is within acceptable range Suction reservoir Is full · fa": Waterflow test valves are in the closed position pt Controller 1:>ilot light (power on) Is Illuminated fer Transfer switch normal pilot light Is Illuminated ? Isolating switch is closed - standby (emergency) power source J2( Reverse phase alarm pilot Is off, or normal phase rotation light is on ~ OIi ievei In vertical motor sight glass is within acceptable range jZl1 Power to pressure maintenance (jockey) pump Is provided

115 Check parallel and angular alignment of the pump and driver (8.3.3.7)

Test

,W Record the system suction and discharge pressure gauge readings zf Check the pump packing glands for slight discharge

)2!' Adjust gland nuts if necessary .0' Check for unusual noise or vibration jLI" Check packing boxes, bearings, or pump casing for overheating

,0' Open Test Valve )2( Start pump. Record pump starting pressure. ="-'-"~psi ,la' Record time for motor to accelerate to full speed. ci sec.

~ Record time controller Is on first step. l sec.

Ja Record time pump runs after starting (for automatic stop controllers.) -~~ __ sec.

EC.02.03.05. EP-6 Page 1 ofZ