- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This document is a Report of Inspection/Test for the Five Year NFPA 25 inspection conducted on March 30, 2024 at the University of Washington Medical Center (UWMC) - Montlake Tower, a building constructed in 2012 located at 1959 NE Pacific Street in Seattle, Washington. The inspection was performed by Technician Mike Sanders and covers the automatic fire sprinkler system, including the storage tank, valves, alarms, and other components. The report indicates that all inspected items passed the required tests and are in good working condition.
The related state and local contract opportunity is for the provision of Automatic Fire Sprinkler System Testing & Inspection services at UWMC Montlake, UWMC Northwest, and Harborview Medical Center. The contract will establish a qualified pool of Bidders to provide these services on an as-needed basis. The contract is open to various jurisdictions throughout Washington state, including counties such as King, Pierce, and Snohomish. Pricing and funding details are not provided in the information given.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report of Inspection/ Test Five Years NFPA 25
2024-03-30 Conducted by: Mike Sanders - Technician w Property Account
Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Pacific St Seattle Washington 98195 U1 IV R ITY of WAS JI IN GTO • Seattle WA 98195 206-598-6247 Print Date: 2024-03-30 sandem3@uw.edu
Interior of automatic tank refill valves that cannot be 0 Yes Exterior coated and insulated surfaces of tank and 0 Yes reset externally okay? D No supporting structure free from degradation? D No
D NA D NA
Expansion joints not leaking or cracking? 0 Yes Interior inspection to be performed once every three 0 Yes
D No years on steel tanks without corrosion protection and D No
D NA once every five years on other tanks
D NA
Interior in good condition with no pitting, corrosion, 0 Yes No voids under the floor (ring foundations)? 0 Yes spalling, rot, deterioration, waste materials,m debris, D No D No aquatic growth, or failure of interior coating?
D NA D NA
Heating system in good condition? D Yes Are anti-vortex plates in good condition? 0 Yes
D No D No
0 NA D NA
If pitting, corrosion or failure of coating was observed D Yes Adhesion Test In accordance with ASTM D3359 with 0 Yes during the interior Inspection, was the following D No acceptable results? D No performed?
0 NA D NA
Dry film thickness measurements taken to determine 0 Yes Ultrasonic readings for wall thickness? D Yes coating thickness? D No D No
D NA 0 NA
Wet sponge test, no problems with coating? 0 Yes Ultrasonic testing or removal of coupons shows no 0 Yes
D No problem with tank bottom? D No
D NA D NA
Vacuum box test on flat bottom tank shows no problem? 0 Yes Check valves internally inspected, all parts operate 0 Yes
D No properly and are In good condition? D No
D NA D NA
Interior of automatic tank refill valves that can be reset 0 Yes externally okay? D No
D NA
TESTING
High level water alarm passed test? 0 Yes Low water level alarm passed test? 0 Yes
D No D No
D NA D NA
Valve supervisory switches indicate movement? 0 Yes All control valves orerated through·full range and 0 Yes
D No returned to norma position? D No
D NA D NA
Automatic fill valve automatically actuated? 0 Yes Record Refill Rate: gpm 11000 D No
D NA
Level indicators accurate and free to move? 0 Yes Do gauges compare to calibrated one or replaced? 0 Yes
D No D No
D NA D NA
Copyright 2024 Inspect Point
Report of Inspection / Test
2024-03-30 Conducted by: Mike Sanders - Technician w Property Account
Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Pacific St Seattle Washington 98195 U IVER ITY of WASl l lNGTO • Seattle WA 98195 206-598-6247 Print Date: 2024-03-30 . sandem3@uw.edu
MAINTENANCE
Adjusted, repaired, reconditioned, or replaced 0 Yes Strainers of automatic refill valves cleaned? 0 Yes components had the associated tests and/or Inspections D No D No performed? ·
D NA D NA
Sediment drained or flushed from tank? 0 Yes Operating stem of all OS&Y valves lubricated completely 0 Yes
D No closed, and reopened? D No
D NA D NA
Cathodic protection maintained in a.ccordance with 0 Yes opened then closed, and tank vents? D No
D NA
Copyright 2024 Inspect Point
Report of Inspection/ Test
2024-03-30 Property UWMC - Montlake Tower Built 2012 Building#: 3 1959 NE Pacific St Seattle WA 98195 Print Date: 2024-03-30
Conducted by: Mike Sanders - Technician Account
University of Washington Medical Center 1959 Ne Pacific Street Seattle Washington 98195 .
206-598-6247 sandem3@uw.edu
Deficiencies - UWMC - Montlake Tower - Fire Pump Storage Tank
None