RFQQ 2631 Attach D Answers UWMC MTLK Part6.pdf

PDF 4 MB Posted

Attached to
FIRE SPRINKLER SYSTEM TESTING AND INSPECTION
Solicitation number
UWM 2631
Issued by
Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington

About this file

This document is a Report of Inspection / Test for the Annual NFPA 25 and Annual NFPA 72 conducted at the University of Washington Medical Center (UWMC) Montlake Tower building located in Seattle, Washington. The report provides details on the inspection and testing of the facility's fire alarm system, including the fire pump, alarm systems monitoring, secondary power, notification appliances, emergency communication equipment, and auxiliary functions. It also includes information on the control panel and battery readings.

The state and local contract opportunity is for UW Medicine to establish a pool of qualified and experienced bidders to provide Automatic Fire Sprinkler System Testing & Inspection services at Harborview Medical Center (HMC), UWMC Montlake, and UWMC Northwest and its campus buildings. The contract will also cover other related fire sprinkler services on an as-needed basis. The solicitation is open to bidders across multiple Washington counties and cities.

View the file

Other files

File Type Posted
RFQQ 2631 Attach D Answers HMC Rep.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part14.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part2.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part3.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part5.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part7.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part9.pdf PDF
RFQQ 2631 Attach D Bidders Questions Final.xlsx XLSX spreadsheet
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 2.doc DOC document
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 4.doc DOC document
RFQQ 2631 Attach D Answers UWMC MTLK Part16.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part8.pdf PDF
RFQQ 2631 Attach D Answers UWMC NWH Rep.pdf PDF
RFQQ 2631 Attach D Answers Final.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part1.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part11.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part12.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part4.pdf PDF
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 1.doc DOC document
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 3.doc DOC document
RFQQ 2631 Attach D Answers Equip.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part10.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part13.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part15.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part17.pdf PDF
RFQQ 2631 FIRE SPR SYSTEM TESTING INSPECT.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report of Inspection / Test Annual NFPA 25, Annual NFPA 72

202~01-06 Conducted by: Mike Sanders - Technician w Property Account

Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street .

1959 NE Pacific St Seattle Washington 98195 u IV : HS IT Y II/ WA II ING I •

Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

Report of Inspection / Test for Asset - Fire Pump ATS #14

Transfer Switch Information

Description Fire Pump Manufacturer Russelectrl

ATS #14 C

Model FTA1930- Serial Number 630832-

AM200B 01RE

Inspection and Testing Form - UWMC - Montlake Tower - Alarm Systems

Monitoring Entity

Contact Name Simplex Telephone 18007522490

Reference Number 37-1080 Type Transmission Dialer

Approving Agency

Contact Name Seattle Fire Department Telephone N/A

Email N/A Service Type Seattle Fire Department

System Type

Control Unit Manufacturer Johson Controls Inc Model Number 4100ES

Circuit Styles Nodes Software Revision. 12.06

Date Last Serviced 2024-02-21 Last Date and Software or Configuration 2024-02-21 was Revised

Number of Circuits 1

Power Supply

Main Nominal Voltage 120 Main Nominal Amps N/A

Overcurrent Protection N/A Panel Board Location SA1007

Disconnecting Means Location N/A Secondary Standby NIA

Storage Battery: Amp Hour Rating NIA Calculated Capacity to operate system NIA (Hours)

Engine-driven generator dedicated to fire N/A Location of fuel storage N/A alarm system

Has Emergency System described In NFPA YES Has L1cally required standby described In YES 70, Article 700 NFPA 0, Article 701 .

Has Optional standby system described In YES NFPA 70, Article 702, which also meets the performance requirements of Article 700 ·or 701

C~pyrlght 2024 Inspect Point

Report of Inspection/ Test

2024-01-06 Conducted by: Mike Sanders - Technician w Property A.ccount

Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Paclfli:: St Seattle Washington 98195 IVERSITY o.f \VA SIi iNG 0 Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

NOTIFICATIONS MADE PRIOR TO ANY TESTING Yes No N/A Who Time

Monitoring Entity 0 D D Dlsbatcher 6:00

Building Occupants 0 D D Aaron Schwelkl 6:00

Building Management 0 D D Mike Sanders 6:00

Other (Specify) 0 D D UWMC • Dlsbatch 6:00

AHJ Notified of Any Impairments 0 D D SFD 6:00

SYSTEM TESTS AND INSPECTIONS Visual Functional Pass/Fall Comments

Supervision Yes Yes Pass

Local Annunciator Yes Yes Pass

Remote Annunciator Yes Yes Pass

Power Extender Panels Yes Yes Pass

Isolation Modules Yes Yes Pass

Sound Pressure Level- Ambient Yes Yes Pass

Sound Pressure Level- Alarm Yes Yes Pass

System Intelligibility · CSI Yes Yes Pass

System Intelligibility- STI Yes Yes Pass

Functional Test Yes Yes Pass

Reset/Power down Test Yes Yes Pass

UPS Power Test Yes Yes Pass

CCU Security Mechanism Yes Yes Pass

Prerecorded Message Content NIA NIA NIA

Prerecorded Message Activation NIA NIA NIA

Software Backup Performed NIA NIA NIA

Test Backup Software Yes Yes Pass

Fire Alarm to MNS Interface Yes Yes Pass

MNS to Fire Alarm Interface Yes Yes Pass

In-building MNS to wide area MNS Yes Yes Pass

MNS to direct recipient MNS Yes Yes Pass

Other (Specify) NIA N/A NIA

SECONDARY POWER Visual Functional Pass/Fall Comments

Copyright 2024 Inspect Point i=

Report of Inspection/ Test Annual NFPA 25, Annual NFPA 72

2024-01-06 Conducted by: Mike Sanders - Technician w Property ·Account

Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Pacific St Seattle Washington 98195 L IVEH SI y 11/ WA II ING Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

Battery Condition Yes Yes Pass

Load Voltage Yes Yes Pass

Discharge Test Yes Yes Pass

Charger Test Yes Yes Pass

Specific Gravity Yes Yes Pass

Transient Suppressors Yes Yes Pass

Remote Annunciators Yes Yes Pass

NOTIFICATION APPLIANCES Visual Functional Pass/Fail Comments

Audible Yes Yes Pass

Visual Yes Yes Pass

Speakers Yes Yes Pass

Voice Clarity Yes Yes Pass

EMERGENCY COMMUNICATION Visual Functional Pass/Fall Comments

EQUIPMENT

Phone Set NIA NIA NIA

Phone Jacks NIA NIA NIA

Off-Hook Indicator NIA NIA NIA

Ampllfler(s) Yes Yes Pass

Tone Generator(s) Yes Yes Pass

Call-In Signal NIA NIA NIA

System Performance Yes Yes Pass

System Audibility Yes Yes Pass

System Intelligibility Yes Yes Pass

Radio Communication Enhancement System Yes Yes Pass

Area of Refuge Communication System Yes Yes Pass

Elevator Emergency Communication System Yes Yes Pass

Other (Specify) N/A N/A N/A

AUXILIARY FUNCTIONS/INTERFACE Visual Functional Pass/Fall Comments

EQUIPMENT/SPECIAL HAZARDS

Door-Releasing Devices Yes Yes Pass

Fan Shutdown Yes Yes Pass

2024-01-06 Conducted by: Mike Sanders - Technician w Property Account

Medicine UWMC - Montlake Tower Built 2012 Unlversli of Washington Medical Center Building#: 3 1959 Ne aclflc Street 1959 NE Pacific St Seattle Washington 98195 NIVF. SITY 11J WA SII ING O 1• Seattle WA 98195 206-598-6247 .

Print Date: 2024-03-19 sandem3@uw.edu

Smoke Management/Smoke Control Yes Yes Pass

Smoke Damper Operation Yes Yes Pass

Smoke Shutter Release NIA N/A N/A

Door Unlocking Yes Yes Pass

Elevator Recall .Yes Yes Pass

Elevator Shunt-Trip Yes Yes Pass

MNS override of FA signals No No

Other (Specify) No No

SUPERVISING STATION MONITORING EC 02.03.05 Yes No N/A Who Time

EP0S

Alarm Signal 0 D D Dlsbatch 10:00

Alarm Restoration 0 D D Aaron Schwelkl 10:00

Supervisory Signal 0 ' D D Dlsbatch 6:00

Supervisory Restoration 0 D D Aaron Schwelkl 10:00

Trouble Restoral 0 D D Aaron Schwelkl 10:00

NOTIFICATIONS THAT TESTING IS COMPLETE Yes No N/A Who Time

Monitoring Agency 0 D D Dlsbatch 10:00

Building Occupants 0 D D Aaron Schwelkl 10:00

Building Management 0 D D Mike Sanders 10:00

AHJ Notified of Any Impairments 0 D D SFD 10:00

Other (Specify) 0 D D UWMC- FOMS& 10:00 Dlsbatch

ALARM INITIATING DEVICES AND CIRCUIT INFORMATION Qty Installed Qty Tested

Manual Stations

Ion Detectors

Photo Detectors

Duct Detectors

Heat Detectors

Waterflow Switches

Supervisory Switches

Other (Specify)

2024-01-06 Conducted by: Mike Sanders - Technician w Property Account ·

Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Pacific St Seattle Washington 98195 1 IV RSI TY uf W.\'SII INGTO 1•

Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

ALARM INDICATING DEVICE INFORMATION Qty Installed Qty Tested

Bells

Horns

Chimes

Strobes

Horn Strobes

Speakers

Speaker Strobes

Other (Specify)

2024-01-06 Conducted by: Mike Sanders - Technician w Property Account

Medici UWMC - Montlake Tower e Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Pacific St Seattle Washington 98195 U IVEH SITY 11/ W Sii lNGT N.

Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

Control Panel & Battery Readings control Panel Information

Location Manufacturer Model # of Batteries

3SA Simplex 4100ES 2

Battery Size Date Installed Replacement Date

110AH 03/01/2021 03/01/2026

Control Panel

Interface Equipment Yes · Lamps/ LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Lo.ad Test%

2024-01-06 Conducted by: Mike Sanders - Technician w Property Account

Medicine UWMC - Montlake Tower Built 2012 Unlverslt~ of Washington Medical Center Building#: 3 1959 Ne aclflc Street · 1959 NE Pacific St Seattle Washington 98195 ' I\' RS ITY 11/ WA SII ING N.

Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

Additional Control Panels ·

Control Panel Information

Location Manufacturer Model # of Batteries

CUP Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 02/01/2021 02/01/2026

Control Panel

Interface Equipment Yes Lamps I LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

1SA Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 02/01/2021 02/01/2026

Control Panel

Interface Equipment Yes Lamps/ LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

2SA· LOWER Simplex 4009 2

Copyright 2024 Inspect Point .

2024-01-06 Conducted by: Mike Sanders - Technician w Property Account

Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Pacific St Seattle Washington 98195 1 IVERSITY o/ WA II ING .

Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

Battery Size, Date Installed Replacement Date

7AH 02/01/2021 02/01/2026

Control Panel

Interface Equipment Yes Lamps /LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

2SA· UPPER Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 02/01/2021 02/01/2026

Control Panel

Interface Equipment Yes Lamps/ LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

3SA Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 03/01/2023 02/29/0028

Control Panel

Interface Equipment Yes Lamps/LEDs Yes

File details come from the government source that posted it. Updated .