RFQQ 2631 Attach D Answers UWMC MTLK Part7.pdf

PDF 2 MB Posted

Attached to
FIRE SPRINKLER SYSTEM TESTING AND INSPECTION
Solicitation number
UWM 2631
Issued by
Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington

About this file

This document is a Report of Inspection/Test Annual NFPA 25, Annual NFPA 72 for the University of Washington Medical Center (UWMC) Montlake Tower, which was built in 2012. The report, conducted by technician Mike Sanders on January 6, 2024, provides details on the inspection and testing of the fire sprinkler system and fire alarm control panels at the UWMC Montlake Tower facility located at 1959 NE Pacific Street in Seattle, Washington.

The report includes information on the control panels, batteries, primary and secondary power supplies, and other system components, indicating that all items have passed inspection. The report provides details on the make, model, and battery specifications for each control panel, as well as the installation and replacement dates for the batteries.

View the file

Other files

File Type Posted
RFQQ 2631 Attach D Answers HMC Rep.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part14.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part2.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part3.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part5.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part9.pdf PDF
RFQQ 2631 Attach D Bidders Questions Final.xlsx XLSX spreadsheet
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 2.doc DOC document
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 4.doc DOC document
RFQQ 2631 Attach D Answers UWMC MTLK Part16.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part8.pdf PDF
RFQQ 2631 Attach D Answers UWMC NWH Rep.pdf PDF
RFQQ 2631 Attach D Answers Final.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part1.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part11.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part12.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part4.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part6.pdf PDF
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 1.doc DOC document
RFQQ 2631 FIRE SPR SYS TEST INSPECT AMEND 3.doc DOC document
RFQQ 2631 Attach D Answers Equip.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part10.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part13.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part15.pdf PDF
RFQQ 2631 Attach D Answers UWMC MTLK Part17.pdf PDF
RFQQ 2631 FIRE SPR SYSTEM TESTING INSPECT.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report of Inspection/ Test Annual NFPA 25, Annual NFPA 72

2024-01-06 Conducted by: Mike Sanders -Technician w Property Account

Medicine UWMC - Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street · 1959 NE Pacific St Seattle Washington 98195 IVF,R SITY of W1\ II ING ON.

Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

4SA Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 03/01/2024 02/28/0029

Control Panel

Interface Equipment Yes Lamps/LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches · Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

SSA Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 02/01/2020 02/01/2025

Control Panel

Interface Equipment Yes Lamps/ LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Copyright 2024 Inspect Point Page 17 of21

2024-01-06 Conducted by: Mike Sanders - Technician ·w Property Account

Medicine UWMC - Montlake Tower Built 2012 University of Washington Med.lea! Center Bulldln,#: 3 1959 Ne Pacific Street 1959 N Pacific St Seattle Washington 98195 u 1\' ER SI TY nJ W1\ SII ING 0 • Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

GSA Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 02/01/2021 01/31/2026

Control Panel

Interface Equipment Yes Lamps/LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

7SA Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 02/01/2022 01/31/2027

Control Panel

Interface Equipment Yes Lamps/ LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass I Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

2024-01-06 Conducted by: Mike Sanders - Technician w Property Account

Medicine UWMC - Montlake Tower Built 2012 Unlversli of Washington Medical Center Building#: 3 1959 Ne aclflc Street 1959 NE Pacific St Seattle Washington 98195 U111vrnsr rv 1.1J WA II INGTO • Seattle WA 98195 206-598-6247 Print Date: 2024-03-19 sandem3@uw.edu

SSA • 4009 Panel Simplex 4009 2

Battery Size Date Installed Replacement Date

7AH 02/01/2020 02/01/2025

Control Panel

Interface Equipment Yes Lamps/LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%

Control Panel Information

Location Manufacturer Model # of Batteries

BSA • 4100ES Panel Simplex 4100ESTSP 2

Battery Size · Date Installed Replacement Date

SOAH 03/01/2024 03/01/2029

Control Panel

Interface Equipment Yes Lamps/LEDs Yes

Fuses Yes Primary Power Supply (AC) Yes

Trouble Switches Yes Secondary Power Supply (DC) Yes

Disconnect Switches Yes Pass/ Fall Pass

Control Panel Batteries

Battery Voltage w Charger Battery Voltage w/o Charger

Load Test%