RFQQ 2631 Attach D Answers UWMC MTLK Part1.pdf
PDF 4 MB Posted
- Attached to
- FIRE SPRINKLER SYSTEM TESTING AND INSPECTION
- Solicitation number
- UWM 2631
- Issued by
- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This is a Five Year Inspection Report for the UWMC - Montlake Tower fire sprinkler system, conducted on March 30, 2024 by Technician Mike Sanders. The report covers the inspection and testing of the water storage tank for the automatic sprinkler system, in accordance with NFPA 25-2011 standards. All equipment was found to be in operational condition at the time of the inspection.
Additionally, this report is related to a state and local contract opportunity issued by the University of Washington Medical Center (UWMC) to establish a pool of qualified and experienced Bidders to provide Automatic Fire Sprinkler System Testing & Inspection services at UWMC Montlake, UWMC Northwest, and Harborview Medical Center, as well as other related Fire Sprinkler Services on an as-needed basis. The contract will cover multiple jurisdictions across the state of Washington, including counties, cities, and census-designated places. Bidders are required to follow the proposal due date specified in the RFQQ document, not the WEBS closing date.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Five Year Inspection Report
Completed on: 2024-03-30 for UWMC - Montlake Tower
1959 NE Pacific St Seattle, WA 98195
Conducted By:
Mike Sanders - Technician Account
University of Washington Medical Center 1959 Ne Pacific Street
Seattle, Washington 98195
This Joint Commission inspection was performed in accordance with the following codes and regulations:
UWMC - Montlake Tower 1959 NE Pacific St Seattle, WA, 98195
EC 02.03.05 EP 07
EC 02.03.05 EP 07 Summary w Medicine U IVER ITV of WA SII INGTON.
For automatic sprinkler systems: Every six months, the hospital tests water-storage tank high- and low-water level alarms. The results and completion dates are documented.
Note: For additional guidance on performing tests, see NFPA 25-2011: 9.3; Table 9.1.1.2.
Devices Tested this Pass Fall Tested YTD Not Tested Types Inspection VTD
Water Storage Tanks 1 1 0 1 0
EC 02.03.05 EP 07 Detail - Water Storage Tanks (UWMC - Montlake Tower - Fire Pump Storage Tank)
Device Address Locatlo Last Type n · Tested
1 Water Storage Tanks N/A NIA 2024-03-30 (UWMC - Montlake Tower - Fire Pump Storage Tank)
Conducted by: Mike Sanders - Technician Account Copyright 2024 Inspect Point
Total
Status
Pass
UWMC - Montlake Tower 1959 NE Pacific St Seattle, WA, 98195
Inspector Signature w Medicine UNIVERSIT Y o/ WASII IN GTON.
I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.
Inspector Name
Applied Divers &
: Job
# 240206MR01
Client Signature
Signature Date Completed
2024-03-30
I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.
Client Name
Mike Sanders
Signature
Conducted by: Mike Sanders - Technician Account Copyright 2024 Inspect Point
Date Completed
2024-03-30
Report of Inspection/ Test Five Years NFPA 25
2024-03-30 Conducted by: Mike Sanders• Technician w Property Account
Medicine UWMC • Montlake Tower Built 2012 University of Washington Medical Center Building#: 3 1959 Ne Pacific Street 1959 NE Pacific St Seattle Washington 98195 u I VERS ITY of WASI II NGTO • Seattle WA 98195 206-598-6247 Print Date: 2024-03-30 sandem3@uw.edu
Report of Inspection/ Test for Asset - UWMC - Montlake Tower - Fire Pump Storage Tank
OWNER SECTION
Is the water storage tank In service? 0 Yes Has it remained in service since the last inspection? 0 Yes
D No D No
D NA D NA
Are systems supplied by the tank free of actuations of 0 Yes devices or alarms since the last inspection? D No
D NA
INSPECTION
For Control valves supervised with seals: In correct open 0 Yes For Control valves supervised with seals: Ac'cesslble and 0 Yes or closed position? D No free from external leaks? D No
D NA D NA
For Control valves supervised with seals: Provided with 0 Yes For Control valves supervised with seals: Provided with 0 Yes appropriate wrenches? D No appropriate identification? D No
D NA D NA
Are automatic tank fill valves (not locked or supervised) 0 Yes In tanks ·with no water level alarm, water level and 0 Yes open? D No conditions are correct? D No
D NA D NA
In tanks with locked or supervised automatic tank fill 0 Yes Exterior of automatic fill valve is okay? 0 Yes valves, and automatic fill valves open? D No D No
D NA D NA
Gauges: good condition, normal pressure? 0 Yes Control valves with locks or electr ical supervision: In 0 Yes
D No correct open or closed position? D No
D NA D NA
Control valves with locks or electrical supervision: 0 Yes Control valyes with locks or electrical supervision: 0 Yes
Accessible and free from external leaks? D No Provided with appropriate wrenches? D No
D NA D NA
Control valves with locks or electrical supervision: 0 Yes Control valves with locks or electrical supervision: Lock 0 Yes
Provided with appropriate identification? D No or supervision In place? D No
D NA D NA
In tanks with water level alarms, water level and 0 Yes In pressure tanks with pressure source supervised, is air 0 Yes condition are correct? D No pressure correct? D No
D NA D NA
Tank vents clean? 0 Yes Exterior of tank, support structure, foundation, 0 Yes
D No condition of water Is tank, catwalks and ladders, strong D No
D NA and free from obvious damage and ice?
D NA
Area around tank free from combustible and materials 0 Yes Strainers, filters and orifices of automatic tank fill valves 0 Yes that could accelerate corrosion and ice? D No are clean? D No
D NA
' D NA
Copyright 2024 Inspect Point
File details come from the government source that posted it. Updated .