This document contains questions and answers regarding solicitation number RFPN62742-21-R-1318 for the construction of sixteen munitions storage igloos, roadway reconstruction/resurfacing, associated utilities and security features, and incidental related work at Andersen Air Force Base, Guam. The Naval Facilities Engineering Command Pacific issued Notice No. 7 providing revisions to the solicitation, including removing the requirement for a neutral wire in the electrical design and specifying that the cost for backfilling any over-excavated areas shall be included under the line items for the base work and option items. Revised drawings will be forthcoming via amendment.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-21-R-1318
Notice No. 7
20 Dec 2021
PRE-PROPOSAL QUESTIONS & ANSWERS
WON 1640581, FY22 MCAF PROJECT P-31054/AJJY073105P4, PDI: MUNITIONS
STORAGE IGLOOS IV,
ANDERSEN AIR FORCE BASE, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
RESPONSE REVISED FROM NOTICE NO. 6 DATED 14 DECEMBER 2021
9. Electrical Works, Drawing E-611 and E-612, Note #2 and Note #6
a. Note #2 of secondary one line diagram on Dwg E-611 calls for 3-phase wires and 1-ground wire without a neutral wire (3#1/0, 1#1/0GND) from panel MDP through EHHs whereas the grounding diagram on Dwg E-612 indicates neutral wire from Panel MDP through Panel ECB-MSI inside the Igloo Bldg. Please clarify.
b. Note #2 of secondary one line diagram on Dwg E-611 calls for 3-phase wires and 1-ground wire without a neutral wire (3#1/0, 1#1/0GND) whereas Note #6 calls for 4-wire and 1-ground wire (4#4, 1#4 GND) Please clarify.
ANSWER:
a. The neutral wire from Panel MDP to ECB-MSI inside the Igloo Bldg will be removed.
Revised drawing will be provided in a forthcoming amendment.
b. Note #6 will be revised to read as 1 1/2” RGS Conduit, 3#4, 1#4GND. Revised drawing will be provided in a forthcoming amendment.
RESPONSE FOR NOTICE NO. 7:
10. RFP –Price Proposal Schedule SF1442, page 3 of 5 SLIN 0001AB and SLIN 0001AC
These unit price line items were provided for costing the work related to over excavating into soil or limestone based upon the conditions provided on drawing S-011. Please indicate where cost for the material, labor, and equipment used to backfill these over excavated areas should be placed. The description of the item clearly directs proposers to price the over excavation, but no guidance is provided for the backfill of the over excavation. We suggest including the backfill in the referenced line items as well since any material removed will need to be replaced with select granular and the quantity to be backfilled will depend on the amount of over excavation completed.
ANSWER: Cost for the material, labor, and equipment used to backfill shall be placed under
SLIN 0001AA, CLIN 0002, and CLIN 0003 of the Price Proposal Schedule for work under CLIN 0001 (Base Item), CLIN 0002 (Option Item No. 1), and CLIN 0003 (Option Item No. 2), respectively.