2_P31054_Dwgs-Signed.pdf

PDF 36 MB Posted

Attached to
FY22 MCAF P-31054, PDI: MUNITIONS STORAGE IGLOOS IV, ANDERSEN AIR FORCE BASE, GUAM
Solicitation number
RFPN62742-21-R-1318
Issued by

About this file

This document provides details for a federal contract solicitation for construction services. The solicitation number is RFPN62742-21-R-1318 and is from the Department of the Navy Naval Facilities Engineering Command for the construction of sixteen munitions storage igloos, roadway reconstruction and resurfacing, associated utilities and security features at Andersen Air Force Base in Guam. The project includes the construction of sixteen munitions storage igloos, roadway reconstruction/resurfacing, associated utilities and security features, and incidental related work. Responses to this solicitation are due to the Department of the Navy Naval Facilities Engineering Command for construction services at Andersen Air Force Base in Guam.

View the file

Other files

File Type Posted
21R1318_Notice11-Issued.pdf PDF
21R1318_Notice10-Issued.pdf PDF
21R1318_Amend0009-Issued.pdf PDF
21R1318_Notice9-Issued.pdf PDF
21R1318_Amend0007-Dwgs.pdf PDF
21R1318_Amend0008-Issued.pdf PDF
21R1318_Notice8-Issued.pdf PDF
21R1318_Notice7-Issued.pdf PDF
21R1318_Amend0007-Issued.pdf PDF
21R1318_Amend0006-Issued.pdf PDF
21R1318_Notice6-Issued.pdf PDF
21R1318_Amend0005-Issued.pdf PDF
21R1318_Notice5-Issued.pdf PDF
21R1318_Notice4-Issued.pdf PDF
21R1318_Notice3-Issued.pdf PDF
P31054_SV-Sign-In_Completed_211117.pdf PDF
21R1318_Amend0004.pdf PDF
21R1318_Notice2-Issued.pdf PDF
21R1318_Notice1-Issued.pdf PDF
21R1318_Amend0003-Issued.pdf PDF
21R1318_Amend0002-Issued.pdf PDF
1_P31054_Specs-Signed-Rev1.pdf PDF
P31054_Amd0001-Attchs.pdf PDF
RFPN6274221R1318.pdf PDF
21R1318_Amend0001-Issued.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05/28/2021

P-31054/AJJY073105P4 PDI - MUNITIONS STORAGE IGLOOS IV

INDEX OF DRAWINGS

G-012

ANDERSEN

AIR FORCE BASE

SITE AND ACCESS MAP

G-101 x x x x x x x x x x x x x x x x x x xx x x x

SCOPE OF WORK SUMMARY

G-102

MUNITIONS STORAGE AREA 1

(MSA-1)

A B C D

X

11 10 x x x x x x x x x x x x x x x x x xx x x x

NATURAL AND CULTURAL RESOURCE MITIGATION

G-103

MUNITIONS STORAGE AREA 1

(MSA-1)

23 24

15 16 17

A B C D E F G H

H

D

CB

A

F

E

G

V-001

V-101

V-102

V-103

V-401

V-402

B-011

LICENSED

PROFESSIONAL

ENGINEER

No. 6095-C

GL

EN

Y. F . LAU

EXP. April 30, 2022

U.S .A

.HAWA I I

AHAAA

x x x x x x x x x x x x x x x x x xx x x x

B-111

MUNITIONS STORAGE AREA 1

(MSA-1)

BORING LOCATION PLAN

B-1

B-2 / P-1

B-3

B-4 / P-2

B-5

B-6

B-7

B-8

B-9 / P-3

B-1/P-1

B-1

B-2/P-1 B-3 B-4/P-2 B-6 B-8

B-7

B-9/P-3

B-5

B-2 (Ph 2)

B-3 (Ph 2)

B-4 (Ph 2)

B-5 (Ph 2)

B-13 (Ph 2)

B-13 (Ph 2)

B-3 (Ph 2)

B-2 (Ph 2)

B-4 (Ph 2)

B-5 (Ph 2)

LICENSED

PROFESSIONAL

ENGINEER

No. 6095-C

GL

EN

Y. F . LAU

EXP. April 30, 2022

U.S .A

.HAWA I I

B-711

U.S .A

.HAWA I I

B-712

.HAWA I I

B-713

.HAWA I I

B-714

.HAWA I I

B-715

.HAWA I I

C-001

C-002

C-003

CD101

CD102

CD103

CD104

CD105

CD106

CS101

CS102

CS103

CS104

CS105

CS106

CP101

CP102

CG101

CG102

CG103

CG104

CG105

CG106

C-401

C-501

C-502

STRUCTURAL GENERAL NOTES SCHEDULE - FOUNDATION SUBGRADE PREPARATION - BASIS OF BID

S-011 x x x x x x x x x x x x x x x x x xx x x x

STRUCTURAL SITE PLAN

S-111

MUNITIONS STORAGE AREA 1

(MSA-1)

XX

13 14 15 16

2 3 4 5 6 7 8 9 10 11

B1

PLAN - MUNITIONS STORAGE IGLOO

B3

SECTION - FOUNDATION AT RETAINING WALL

A3

SECTION - FOUNDATION AT DOOR

A1

SECTION - FOUNDATION AT IGLOO WALL

S-121

LIGHTING POWER ONE LINE DIAGRAM GENERAL NOTES

DUCT DESIGNATION

ABBREVIATIONS

LINE TYPES

MOUNTING HEIGHT SCHEDULE

E-011 xxx x x x x x x x xxx x x x x x xxx x x x xxx x x x x x x x xxx x x x x x xxx x

XFMR

x x x x xx x x x x x x x

SWGR

x x x x x xxx x x x x x xxx x x x x x x x xxx x x x x x xxx x

ES110

PLAN

NORTH

OVERALL ELECTRICAL SITE PLAN

SCALE: 1"=150'

ELECTRICAL DUCTBANK SCHEDULE

S1

S2

S3 1 xx xxx x x x x x x x xxxx xx x x xxxx x xxxx x x x x x x x xxxx xx x x xxxx

XFMR

x x x xxxxx x xxxx

SWGR

x x x xx xxx x x x

S3

S2

S1

S2

S1

S2

S1

S2

S1

S2

S1

S2

S1

S3 S3 S3 S3

ES111

PLAN

NORTH

KEY PLAN

SCALE: NTS

PLAN

NORTH

ENLARGED ELECTRICAL SITE PLAN 1

SCALE: 1"=40'

MATCHLINE, SEE SHEET

MA

TC

HL

IN

E, S

EE

S

HE

ET

S2

S1

S2 S2 S2 S2 S2

S3 S3 S3 S3 S3 S3 xxxxx x x x x x x x xxxx x xx x xxxx xxxxx x x x x x x x xxxx x xx x xxxx

XFMR

xx x xxx xx x xxxx

SWGR

x x x x x xxx x x x

PLAN

NORTH

KEY PLAN

SCALE: NTS

ES112

PLAN

NORTH

ENLARGED ELECTRICAL SITE PLAN 2

SCALE: 1"=40'

MATCHLINE, SEE SHEET

MA

TC

HL

IN

E, S

EE

S

HE

xxxxx x x x x x x x xxxx x xx x xxxx xxxxx x x x x x x x xxxx x xx x xxxx

XFMR

xx x xxx xx x xxxx

SWGR

x x x x x xxx x x x

PLAN

NORTH

KEY PLAN

SCALE: NTS

ES113

PLAN

NORTH

ENLARGED ELECTRICAL SITE PLAN 3

SCALE: 1"=40'

MATCHLINE, SEE SHEET

MA

TC

HL

IN

E, S

EE

S

HE

S3 S3 S3 S3 S3 x x x x xxxx x xx x xxxx xxxxx x x x x x x x xxxx x xx x xxxx

XFMR

xx x xxx xx x xxxx

SWGR

x x x x x xxx x x x xxxxx x x x x x x x xxxx x xx x xxxx

S3

S3

S3

S3

S3

PLAN

NORTH

KEY PLAN

SCALE: NTS

ES114

PLAN

NORTH

ENLARGED ELECTRICAL SITE PLAN 4

SCALE: 1"=40'

MATCHLINE, SEE SHEET

MA

TC

HL

IN

E, S

EE

S

HE

A1

MUNITIONS STORAGE IGLOO - LIGHTING PLAN (TYPICAL OF 16)

SCALE: 3/16"=1'-0"

GRAPHIC SCALE

3/16"=1'-0"

16'8' 24'0'

E-111

MUNITIONS STORAGE IGLOO - POWER PLAN (TYPICAL OF 16)

SCALE: 3/16"=1'-0"

GRAPHIC SCALE

3/16"=1'-0"

16'8' 24'0'

E-112

C2E-511

TYPICAL DUCT SECTION (CONCRETE ENCASED)

NOT TO SCALE C5E-511

TRENCH RESTORATION DETAIL

NOT TO SCALE

A5ALLOWABLE KEYED BLOCKOUT LOCATIONS

NOT TO SCALEA2E-511

TYPICAL DUCT SECTION (CONDUIT ARRANGEMENT)

NOT TO SCALE

E-511

B5E-111

SINGLE POINT GROUND BAR DETAIL

NOT TO SCALEB2E-111, T-111

PANEL ELEVATION

NOT TO SCALE

E-512

2"

3"

7"

SCALE: NOT TO SCALE

4' X 5' X 5' HANDHOLE DETAIL (SECONDARY POWER HANDHOLE-SHH)

B3 A3

A2 A2

A5

A3

A3

A5

B2HANDHOLE DETAIL

SCALE: NOT TO SCALE

A3LIFTING HANDLE DETAIL

SCALE: NOT TO SCALE

A5COVER SEAT MOUNTING DETAIL

SCALE: NOT TO SCALE

B3HANDHOLE COVER DETAIL

SCALE: NOT TO SCALE

A2CABLE RACK, INSULATOR AND PULLING IRON DETAILS

SCALE: NOT TO SCALE

E-513

E-513

E-513

E-513

E-513

SSSS

E-513

E-611

A3SECONDARY ONE LINE DIAGRAM

SCALE: NOT TO SCALE

A2E-111

EXTERIOR LIGHTING CONTROL DIAGRAM

NOT TO SCALE A4GROUNDING DIAGRAM

NOT TO SCALE

E-612

E-613

E-614

DUCT DESIGNATION

GENERAL NOTES TELECOMMUNICATION SYMBOL LIST

ABBREVIATIONS LINE TYPES

MOUNTING HEIGHT SCHEDULE

T-011

211020R

12-31-21 xxx x x x x x x x xxx x x x x x xxx x x x xxx x x x x x x x xxx x x x x x xxx x

XFMR

x x x xx x x x x xx x x

SWGR

x x x x x xxx x x x x x xxx x x x x x x x xxx x x x x x xxx x

TS110

PLAN

NORTH

OVERALL TELECOMMUNICATIONS SITE PLAN

SCALE: 1"=150'

211020R

12-31-21

TELECOMMUNICATION DUCTBANK SCHEDULE

T1

T2

T3

T4

ST1

T1

T4

ST1

T1

T4 T4 T4 T4 xxxxx x x x x x x x xxxx x xx x xxxx xxxxx x x x x x x x xxxx x xx x xxxx

XFMR

xx x xxx xx x xxxx

SWGR

x x x x x xxx x x x

PLAN

NORTH

KEY PLAN

SCALE: NTS

MATCHLINE, SEE SHEET

MA

TC

HL

IN

E, S

EE

S

HE

ET

211020R

12-31-21

TS111

PLAN

NORTH

ENLARGED TELECOMMUNICATIONS SITE PLAN 1

SCALE: 1"=40'

T2

T4 T4 T4 T4 T4 T4

ST1

T3 xxxxx x x x x x x x xxxx x xx x xxxx xxxxx x x x x x x x xxxx x xx x xxxx

XFMR

xx x xxx xx x xxxx

SWGR

x x x x x xxx x x x

211020R

12-31-21

PLAN

NORTH

KEY PLAN

SCALE: NTS

MATCHLINE, SEE SHEET

MA

TC

HL

IN

E, S

EE

S

HE

ET

TS112

PLAN

NORTH

ENLARGED TELECOMMUNICATIONS SITE PLAN 2

x x x x xxxx x xx x xxxx xxxxx x x x x x x x xxxx x xx x xxxx

XFMR

xx x xxx xx x xxxx

SWGR

x x x x x xxx x x x

211020R

12-31-21

PLAN

NORTH

KEY PLAN

SCALE: NTS

MATCHLINE, SEE SHEET

MA

TC

HL

IN

E, S

EE

S

HE

ET

TS113

PLAN

NORTH

ENLARGED TELECOMMUNICATIONS SITE PLAN 3

T4 T4 T4 T4 T4 x x x x xxxx x xx x xxxx xxxxx x x x x x x x xxxx x xx x xxxx

XFMR

xx x xxx xx x xxxx

SWGR

x x x x x xxx x x x

211020R

12-31-21

PLAN

NORTH

KEY PLAN

SCALE: NTS

MATCHLINE, SEE SHEET

MA

TC

HL

IN

E, S

EE

S

HE

ET

TS114

PLAN

NORTH

ENLARGED TELECOMMUNICATIONS SITE PLAN 4

MUNITIONS STORAGE IGLOO - TELECOMMUNICATIONS PLAN (TYPICAL OF 16)

SCALE: 3/16"=1'-0"

T-111

211020R

12-31-21

GRAPHIC SCALE

3/16"=1'-0"

16'8' 24'0'

C2T-511

TRENCH RESTORATION DETAIL

NOT TO SCALE C5T-511

TYPICAL DUCT SECTION

NOT TO SCALE

A5ALLOWABLE KEYED BLOCKOUT LOCATIONS

SCALE: NOT TO SCALEA2T-511

TYPICAL DUCT SECTION CONDUIT ARRANGEMENT

NOT TO SCALE

T-511

211020R

B2T-111

IDS CABINET EQUIPMENT LAYOUT

SCALE: NOT TO SCALE

C5

INNERDUCT DETAIL

SCALE: NOT TO SCALE

A5

MAINTENANCE HOLE RACKING DETAIL

SCALE: NOT TO SCALE

A2T-111

WALL MOUNTED VOICE OUTLET WITHIN CABINET

SCALE: NOT TO SCALE

T-512

OSP FIBER CABLE ID TAG

CAUTION:

A5

OSP BACKBONE CABLE LABELING REQUIREMENTS

NOT TO SCALE

T-513

211020R

6"

7"

6"

2" MIN.

9"

8 7/8"

3"

3"

3"

3"

1"

1"

1"

3" 3"

2"

3"

NOT TO SCALE

4' X 5' X 5' HANDHOLE DETAIL (TELECOM HANDHOLE-THH)

B3 A3

A2 A2

A5

A3

A3

A5

B2T-514

HANDHOLE DETAIL

NOT TO SCALE

A3T-514

LIFTING HANDLE DETAIL

NOT TO SCALE

A5T-514

COVER SEAT MOUNTING DETAIL

NOT TO SCALE

B3T-514

HANDHOLE COVER DETAIL

NOT TO SCALE

A2T-514

CABLE RACK, INSULATOR AND PULLING IRON DETAILS

NOT TO SCALE

T-514

211020R

A2PATHWAY DIAGRAM

SCALE: NOT TO SCALE A5CABLING DIAGRAM

SCALE: NOT TO SCALE

T-611

211020R

J J

C4TYPICAL IDS PROVISION DIAGRAM

NOT TO SCALE

A2TYPICAL FIBER CABLE DIAGRAM

NOT TO SCALE

J J

J

A5TYPICAL TELEPHONE DIAGRAM

NOT TO SCALE

T-612

211020R

DDESB APPROVED

APSI - MUNITIONS STORAGE IGLOOS PACKAGE

INDEX OF DRAWINGS

G-001

S-001

A#DETAIL / SECTION TITLE

ABBREVIATIONS AND SYMBOLS

A1REINFORCEMENT SPLICE SCHEDULE

B3CLOSED STIRRUP TIE DETAILB1STIRRUP AND TIE HOOK DIMENSIONS

C1STANDARD HOOK DIMENSION

A4REFERENCE SYMBOL KEY

S-002

FOUNDATION AND FLOOR PLAN

S-101

ROOF FRAMING PLAN

S-102

C1FRONT ELEVATION

B1REAR ELEVATION

A1SIDE ELEVATION

S-201

B1TRANSVERSE BUILDING SECTION

C1LONGITUDINAL BUILDING SECTION

S-301

A1WALL SECTION AT DOOR A3SIDE WALL SECTION A4REAR WALL SECTION

S-302

B1RETAINING WALL SECTION

S-303

C1TYP. SLAB-ON-GRADE DETAIL C4TYP. FOOTING CORNER BAR DETAIL

B1TYP. STEPPED FOOTING DETAIL

C2

TYP. SLAB-ON-GRADE

CONSTRUCTION JOINT DETAIL C3

TYP. SLAB-ON-GRADE

CRACK CONTROL JOINT DETAIL

S-501

A1PIPE SLEEVE DETAIL

C1SIDE WALL PANEL ELEVATION C2REAR WALL PANEL ELEVATION

A2PANEL SECTION

B1TYP. CONNECTION AT MAIN DOOR JAMB

B3

TYP. PANEL TO PANEL CONNECTION (CORNER)

B2

TYP. PANEL TO PANEL CONNECTION (MIDSPAN)

A3REINFORCEMENT DETAIL AT END OF WALL

S-502

A3ROOF PANEL CONNECTION DETAILA1ROOF PANEL PLAN

B1PRECAST ROOF PANEL DETAIL

C1ROOF PANEL CROSS SECTION C3GROUT TUBE PLACEMENT DETAIL

A4ROOF PANEL END DETAIL

S-503

C2ROOF PANEL CONNECTION AT SIDE WALL C4ROOF PANEL CONNECTION AT REAR WALL

A1WALL PANEL CONNECTION AT BASE

S-504

B1DOOR FRAME ELEVATION

A1SECTION A2GUSSET PLATE DETAIL A3DOOR FRAME HINGE PLATE DETAIL A4DOOR FRAME HINGE PLATE DETAIL S-701

A1RIGHT DOOR ELEVATION - INTERIOR VIEW A3LEFT DOOR ELEVATION - INTERIOR VIEW

S-702

X

X Y

Y

X

X Y

Y

D1SECTION D2SECTION D3SECTION D4SECTION

A1LEFT DOOR EXTERIOR PLATE AND INNER SUPPORT FRAMING A3LEFT DOOR INTERIOR PLATE AND HOLE LOCATION

C5SECTION X-X

B5SECTION Y-Y

S-703

D1HANDLE DETAIL D2DOOR HINGE PLATE DETAIL D3GUSSET HINGE PLATE DETAIL D4HINGE PIN DETAIL D5THRUST BEARING DETAIL

C1TUBE SUPPORT PLATE DETAIL

S-704

B1

INTERNAL LOCKING DEVICE (ILD)

B4

INTERNAL LOCKING DEVICE (ILD)

S-705

M-101

M-501

E-001

G

G

G

G

G

G

G

G

G

G

G

GG

G G G G

G

G

G

G

G

G

G

G GGG

G G GGG

G G G G

G

G

G

E-101

A3TYPICAL LIGHTNING PROTECTION AND GROUNDING SYSTEM PLAN

SCALE: 1/8"=1'-0"

B5ISOMETRIC VIEW OF LPS

A2TYPICAL IGLOO GROUNDING SECTION

C2WALL/FLOOR/ROOF BONDING DETAIL

SCALE: NOT TO SCALE

BOTTOM VIEW

SIDE VIEW

C5E-101

CONDUIT/PIPE GROUND CONNECTION

SCALE: NOT TO SCALE

A5E-101

STATIC GROUND INSERT DETAIL

SCALE: NOT TO SCALE

E-501

C3E-101

TYPICAL GROUND TEST WELL DETAIL

SCALE: NOT TO SCALE

C5E-101, E-501

AIR TERMINAL MOUNTING DETAIL

SCALE: NOT TO SCALE

A1E-101

SINGLE POINT GROUND BAR DETAIL

SCALE: NOT TO SCALE

GROUNDING CONDUCTOR SUPPORT DETAILS

C1E-101

GROUND ROD DETAIL

SCALE: NOT TO SCALE

A3(TYPICAL FOR EXPOSED CONDUCTORS)

SCALE: NOT TO SCALE A5EXOTHERMIC WELD DETAILS

SCALE: NOT TO SCALEA4 E-101

ORDNANCE GROUND INSERT DETAIL

SCALE: NOT TO SCALE

30"

12"

E-502

?href

R

0'- 0"

(T

YP

R

0'- 0"

(T

YP

R

0'- 0"

(T

YP

E-503

C3ROLLING SPHERE ANALYSIS - (SIDE ELEVATION)

SCALE: 1/8"=1'-0"

A2ROLLING SPHERE ANALYSIS - (FRONT ELEVATION)

SCALE: 1/8"=1'-0" A5ROLLING SPHERE ANALYSIS - (REAR ELEVATION)

SCALE: 1/8"=1'-0"

GENERAL
G-011 TITLE SHEET. VICINITY AND LOCATION MAPS
G-012 INDEX OF DRAWINGS
G-101 SITE AND ACCESS MAP
G-102 SCOPE OF WORK SUMMARY
G-103 NATURAL AND CULTURAL RESOURCE MITIGATION
SURVEY
V-001 TOPOGRAPHIC SURVEY MAP KEY PLAN
V-101 TOPOGRAPHIC SURVEY AND PHOTO LOCATION 1
V-102 TOPOGRAPHIC SURVEY AND PHOTO LOCATION 2
V-103 TOPOGRAPHIC SURVEY AND PHOTO LOCATION 3
V-401 MISCELLANEOUS SITE PHOTOS 1
V-402 MISCELLANEOUS SITE PHOTOS 2
GEOTECHNICAL
B-011 GEOTECHNICAL NOTES, USCS, BORING LOG LEGEND, ROCK DESCRIPTION SYSTEM
B-111 BORING LOCATION PLAN
B-711 BORING LOGS 1
B-712 BORING LOGS 2
B-713 BORING LOGS 3
B-714 BORING LOGS 4
B-715 BORING LOGS 5
CIVIL
C-001 CIVIL GENERAL NOTES, LEGENDS, AND SYMBOLS
C-002 OVERALL SITE KEY PLAN
C-003 LIMITS OF CONSTRUCTION PLAN
CD101 SITE DEMOLITION PLAN 1
CD102 SITE DEMOLITION PLAN 2
CD103 SITE DEMOLITION PLAN 3
CD104 SITE DEMOLITION PLAN 4
CD105 SITE DEMOLITION PLAN 5
CD106 SITE DEMOLITION PLAN 6
CS101 SITE PLAN 1
CS102 SITE PLAN 2
CS103 SITE PLAN 3
CS104 SITE PLAN 4
CS105 SITE PLAN 5
CS106 SITE PLAN 6
CP101 5TH STREET ROAD PLAN AND PROFILE 1
CP102 5TH STREET ROAD PLAN AND PROFILE 2
CG101 SITE GRADING AND DRAINAGE PLAN 1
CG102 SITE GRADING AND DRAINAGE PLAN 2
CG103 SITE GRADING AND DRAINAGE PLAN 3
CG104 SITE GRADING AND DRAINAGE PLAN 4
CG105 SITE GRADING AND DRAINAGE PLAN 5
CG106 SITE GRADING AND DRAINAGE PLAN 6
C-401 TYPICAI MUNITIONS STORAGE IGLOO PLAN AND SECTION
C-501 MISCELLANEOUS DETAILS 1
C-502 MISCELLANEOUS DETAILS 2
STRUCTURAL
S-011 SITE STRUCTURAL GENERAL NOTES
S-111 STRUCTURAL SITE PLAN
S-121 MUNITIONS STORAGE IGLOO FOUNDATION SUBGRADE, PLAN & DETAILS
ARCHITECTURAL
A-011 ARCHITECTURAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
A-111 MUNITIONS STORAGE IGLOO - TYPICAL FLOOR PLAN
A-112 MUNITIONS STORAGE IGLOO - TYPICAL REFLECTED CEILING PLAN
A-211 MUNITIONS STORAGE IGLOO - BUILDING ELEVATIONS
A-311 MUNITIONS STORAGE IGLOO - BUILDING SECTIONS
A-511 MUNITIONS STORAGE IGLOO - WALL SECTIONS AND DETAILS
A-611 MATERIAL & FINISH SCHEDULE LIST OF MATERIALS AND SIGNAGE MOUNTING HEIGHT
ELECTRICAL
E-011 ELECTRICAL GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS AND MOUNTING HEIGHT SCHEDULE
ES110 OVERALL ELECTRICAL SITE PLAN
ES111 ENLARGED ELECTRICAL SITE PLAN 1
ES112 ENLARGED ELECTRICAL SITE PLAN 2
ES113 ENLARGED ELECTRICAL SITE PLAN 3
ES114 ENLARGED ELECTRICAL SITE PLAN 4
E-111 MUNITIONS STORAGE IGLOO - LIGHTING PLAN
E-112 MUNITIONS STORAGE IGLOO - POWER PLAN
E-511 MISCELLANEOUS DETAILS 1
E-512 MISCELLANEOUS DETAILS 2
E-513 MISCELLANEOUS DETAILS 3
E-611 SECONDARY ONE LINE DIAGRAM
E-612 MISCELLANEOUS DIAGRAMS 1
E-613 PANELBOARD SCHEDULES
E-614 LIGHT FIXTURE SCHEDULE
TELECOMMUNICATIONS
T-011 TELECOMMUNICATIONS GENERAL NOTES, SYMBOL LIST,
TS110 OVERALL TELECOMMUNICATIONS SITE PLAN
TS111 ENLARGED TELECOMMUNICATIONS SITE PLAN 1
TS112 ENLARGED TELECOMMUNICATIONS SITE PLAN 2
TS113 ENLARGED TELECOMMUNICATIONS SITE PLAN 3
TS114 ENLARGED TELECOMMUNICATIONS SITE PLAN 4
T-111 MUNITIONS STORAGE IGLOO - TELECOMMUNICATIONS PLAN
T-511 MISCELLANEOUS DETAILS 1
T-512 MISCELLANEOUS DETAILS 2
T-513 MISCELLANEOUS DETAILS 3
T-514 MISCELLANEOUS DETAILS 4
T-611 OUTSIDE PLANT PATHWAY AND CABLING DIAGRAM
T-612 MISCELLANEOUS DIAGRAMS
DDESB APPROVED APSI - MUNITIONS STORAGE IGLOOS PACKAGE
GENERAL
G-001 TITLE SHEET AND INDEX OF DRAWINGS
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 ABBREVIATIONS
S-101 FOUNDATION AND FLOOR PLAN
S-102 ROOF FRAMING PLAN
S-201 BUILDING ELEVATIONS
S-301 BUILDING SECTIONS
S-302 WALL SECTIONS
S-303 RETAINING WALL SECTIONS AND DETAILS
S-501 FOUNDATION AND SLAB-ON-GRADE DETAILS
S-502 PRECAST WALL PANEL DETAILS
S-503 PRECAST ROOF PANEL DETAILS
S-504 WALL AND ROOF CONNECTION DETAILS
S-701 DOOR FRAME ELEVATIONS AND DETAILS
S-702 DOOR ELEVATIONS
S-703 DOOR SECTIONS
S-704 DOOR DETAILS
S-705 INTERNAL LOCKING DEVICES
MECHANICAL
M-101 MECHANICAL PLAN, SECTIONS, AND NOTES
M-501 MECHANICAL DETAILS
ELECTRICAL
E-001 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
E-101 TYPICAL LIGHTNING PROTECTION AND GROUNDING SYSTEM PLAN
E-501 LIGHTNING PROTECTION AND GROUNDING DETAILS 1
E-502 LIGHTNING PROTECTION AND GROUNDING DETAILS 2
E-503 ROLLING SPHERE ANALYSIS

File details come from the government source that posted it. Updated .