This notice provides clarification on a question received in response to solicitation number RFPN62742-21-R-1318 issued by the Department of the Navy Naval Facilities Engineering Command Pacific. The solicitation is for the construction of sixteen munitions storage igloos, roadway reconstruction/resurfacing, associated utilities and security features, and incidental related work at Andersen Air Force Base, Guam. The notice clarifies that the backfill material to be used from exposed medium hard to hard limestone to the footing invert is select granular material, not controlled low strength material as incorrectly specified in Note 4 of drawing S-011 included with the solicitation.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-21-R-1318
Notice No. 4
Notice No. 4 1 Dec 2021
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-21-R-1318
WON 1640581, FY22 MCAF PROJECT P-31054/AJJY073105P4, PDI: MUNITIONS
STORAGE IGLOOS IV,
ANDERSEN AIR FORCE BASE, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
7. On Sheet 45 of 107/ Drawing S-011.
On the drawing S-011, Note 3 specify the material backfill after over excavation to a limestone is Selected Granular Backfill (Condition A, B and C). However, Note 4 specify the Controlled Low Strength Material (CLSM) must be used as backfill material from the exposed medium hard to hard limestone to the footing invert. Please verify which material is to be used for backfilling on the over excavated foundation on igloos.
ANSWER: Note 4 should read “Select Granular Material must be used as backfill material from the exposed medium hard to hard limestone to the footing invert.” Clarification will be provided in a forthcoming amendment.