Exhibit_F_Form_F3-2.docx

DOCX document 29 KB Posted

Attached to
MDA Soil Vapor Monitoring
Solicitation number
RFP-0000476
Issued by

About this file

Exhibit F Form F3-2

View the file

Other files

File Type Posted
Exhibit_D_MDA_Vapor_Monitoring_FINAL_Rev1.doc DOC document
RFP-0000476_MDA_Final_Rev._1.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule_-_FINAL.doc DOC document
RFP-0000476_Amendment_1_Rev_0_071619.docx DOCX document
map_19-0011-07_MDA_H_wells.pdf PDF
IMG_0173.jpg JPG image
IMG_0157.jpg JPG image
Appendix_D_2_N3B_RFI.docx DOCX document
IMG_0177.jpg JPG image
Appendix_D_5.docx DOCX document
IMG_0146.jpg JPG image
N3B-SOP-ER-2008.pdf PDF
WCSF_Vapor_Sampling_DRAFT.pdf PDF
RFP-0000476_MDA_Final.pdf PDF
IMG_0158.jpg JPG image
MDA_SVM_Training_Matrix_Rev0.docx DOCX document
IMG_0154.jpg JPG image
N3B-ER-SOP-20235.pdf PDF
IMG_0271.JPG JPG image
Certificate_of_Current_Cost_or_Pricing_Data.pdf PDF
Exhibit_C_FORM_F_Project_Organization_and_Workplan.doc DOC document
IMG_0141.jpg JPG image
IMG_0183.jpg JPG image
EX-I_Attachement_B_-_Subcontractor_Submittals__MDA_SVM.doc DOC document
IMG_0266.JPG JPG image
MDA_L_-_Periodic_Monitoring_Report_for_Vapor_Sampling_-_Second_Quarter_FY11_LA-UR-11-4246.pdf PDF
N3B-AP-ER-1001.pdf PDF
IMG_0268.JPG JPG image
IMG_0253.JPG JPG image
Insurance_Requirements_RFP-0000476.pdf PDF
IMG_0167.jpg JPG image
EX-H_Final.pdf PDF
IMG_0138.jpg JPG image
manifold.jpg JPG image
Exhibit_C_FORM_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_G_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_SDDR_Form_2178.pdf PDF
map_19-0011-05_TA21_wells.pdf PDF
IMG_0181.jpg JPG image
Exhibit_C_Form_H_Resume_of_Key_Personnel_-_FINAL.doc DOC document
Exhibit_C_FORM_B_Construction_Plant_Equipment_List.doc DOC document
IMG_0269.JPG JPG image
switches.jpg JPG image
IMG_0151.jpg JPG image
IMG_0172.jpg JPG image
IMG_0252.JPG JPG image
Exhibit_C_FORM_C-1_Lower_Tier_Experience_Statement.doc DOC document
N3B-ER-SOP-10094.pdf PDF
Exhibit_C_Form_A_-_MDA_Vapor_Monitoring_FINAL.docx DOCX document
collecting_tritium_samples.jpg JPG image
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit F Form F3-2 Environment, Safety and Health Worksheet

Subcontractor Name: Worksheet completed by: Date:

Proposed N3B Subcontract Number: 0000476

1. Experience Modification Rate (EMR)

List your firm’s Interstate EMR for the past three (3) years and total hours worked.

Year:
EMR:
Year:
EMR:
Year:
EMR:

3-year average:

If the state where the jobsite is located has an EMR rating system, provide the state EMR for the past three (3) years and the total hours worked.

Year:
EMR:
Year:
EMR:
Year:
EMR:

3-year average:

2. Total Recordable Case (TRC) and Days Away/Restricted/Transferred Case (DART) Rates

List the cumulative injury statistics rates for the past three (3) years using the BLS formula to determine recordability.

Year:
TRC:DART:
Hours Worked:
Year:
TRC:DART:
Hours Worked:
Year:
TRC:DART:
Hours Worked:
3-year average TRC:
DART:

Attach copies of the OSHA Annual Summary Logs (OSHA’s Form 300A) for the three most recent years and a current year OSHA 300 Log for the months during the period since the last annual report.

Any OSHA fine(s) over the past three (3) years? If yes, provide a written explanation on an attachment to this form.

3. Fatalities

Any fatalities within the last three (3) years? If Yes, list total number of fatalities: , and provide a written explanation for each fatality on an attachment to this form.

4. Bureau of Alcohol, Tobacco, and Firearms violations

Any Bureau of Alcohol, Tobacco, and Firearms violations within the last three (3) years?
If Yes, list the number:, and type of violations:.

5. For companies exempt from record keeping requirements per 29 CFR 1904.1 (ten or fewer employees), complete items 1 and 3 above and summarize the cause of the injuries/illnesses for the past three (3) years, including the current year, on a separate attachment to this form. Additionally, include corrective actions taken to prevent re-occurrence.

RFP-0000476

Rev. 1 - February 2017

LA-UR-21898

6. Check your type of work for the most recent 3 year period: Non-Residential Building, include dates:

Heavy (Non-Highway) Construction, include dates: Mechanical, include dates:

Electrical, include dates:

Other (State type and date):

7.List key Safety and Health personnel planned for this project. Please list name and expected position.
NAMEPOSITION
8.List key Environmental personnel planned for this project. Please list name and expected position.
NAMEPOSITION

9. Environmental Record

Has your firm been subject to any environmental enforcement proceedings before a federal or state agency within the last five (5) years? If Yes, for each proceeding provide the name of the agency, the nature of the proceeding, the charge(s) and the result on an attachment to this form.

Has your firm violated or exceeded any federal or state environmental standard, requirement,
regulation or statute within the last three (3) years?If Yes, for each violation give a brief description of the nature of the violation on an attachment to this form.

NOTE: THIS FORM IS PRIMARILY FOR BID EVALUATION HOWEVER IS NOT PRECLUDED FROM BECOMING PART OF A RESULTANT SUBCONTRACT.

File details come from the government source that posted it.