Appendix D-2 N3B RFI

View the file

Other files

File Type Posted
Exhibit_D_MDA_Vapor_Monitoring_FINAL_Rev1.doc DOC document
RFP-0000476_MDA_Final_Rev._1.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule_-_FINAL.doc DOC document
RFP-0000476_Amendment_1_Rev_0_071619.docx DOCX document
map_19-0011-07_MDA_H_wells.pdf PDF
IMG_0173.jpg JPG image
IMG_0157.jpg JPG image
IMG_0177.jpg JPG image
Appendix_D_5.docx DOCX document
IMG_0146.jpg JPG image
N3B-SOP-ER-2008.pdf PDF
WCSF_Vapor_Sampling_DRAFT.pdf PDF
RFP-0000476_MDA_Final.pdf PDF
IMG_0158.jpg JPG image
MDA_SVM_Training_Matrix_Rev0.docx DOCX document
IMG_0154.jpg JPG image
N3B-ER-SOP-20235.pdf PDF
IMG_0271.JPG JPG image
Certificate_of_Current_Cost_or_Pricing_Data.pdf PDF
Exhibit_C_FORM_F_Project_Organization_and_Workplan.doc DOC document
IMG_0141.jpg JPG image
IMG_0183.jpg JPG image
EX-I_Attachement_B_-_Subcontractor_Submittals__MDA_SVM.doc DOC document
IMG_0266.JPG JPG image
MDA_L_-_Periodic_Monitoring_Report_for_Vapor_Sampling_-_Second_Quarter_FY11_LA-UR-11-4246.pdf PDF
N3B-AP-ER-1001.pdf PDF
IMG_0268.JPG JPG image
IMG_0253.JPG JPG image
Insurance_Requirements_RFP-0000476.pdf PDF
IMG_0167.jpg JPG image
EX-H_Final.pdf PDF
IMG_0138.jpg JPG image
manifold.jpg JPG image
Exhibit_C_FORM_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_G_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_SDDR_Form_2178.pdf PDF
map_19-0011-05_TA21_wells.pdf PDF
IMG_0181.jpg JPG image
Exhibit_C_Form_H_Resume_of_Key_Personnel_-_FINAL.doc DOC document
Exhibit_C_FORM_B_Construction_Plant_Equipment_List.doc DOC document
IMG_0269.JPG JPG image
switches.jpg JPG image
IMG_0151.jpg JPG image
IMG_0172.jpg JPG image
IMG_0252.JPG JPG image
Exhibit_C_FORM_C-1_Lower_Tier_Experience_Statement.doc DOC document
N3B-ER-SOP-10094.pdf PDF
Exhibit_C_Form_A_-_MDA_Vapor_Monitoring_FINAL.docx DOCX document
collecting_tritium_samples.jpg JPG image
N3B-ER-SOP-20145.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBCONTRACT No.

RFI No.
Date:
Page 1 of
Project ID:
Date Reply Requested By:

Reference Information (Document/Drawing/Specification/Location)

INFORMATION REQUESTED / PROBLEM:

PROPOSED RESPONSE / SOLUTION:

SUBCONTRACTOR Representative:
STR:
Receipt Date:

INFORMATION TO SUBCONTRACTOR

Date:

CONTRACTOR Representative:

REQUESTED INFORMATION:

RFP No.

Technical Subcontract Management

REQUEST FOR INFORMATION

RFP-0000476

REQUEST FOR INFORMATION INSTRUCTIONS

This procedure provides for controlled identification, notification and resolution of SUBCONTRACTOR initiated technical questions. A Request for Information (RFI) is a SUBCONTRACTOR initiated technical question. An RFI is initiated if the SUBCONTRACTOR:

· Is unable to understand technical documents: scope, specifications, drawings or data.

· Discovers or perceives a conflict, ambiguity, error or omission in or among the technical documents.

Upon determination that an RFI is required, the SUBCONTRACTOR should prepare its question on the attached form, log the RFI using a sequential numbering system (e.g., the first RFI is [SUBCONTRACT #]-RFI-0001), and deliver the RFI to CONTRACTOR’S STR or designated location (address). SUBCONTRACTOR shall maintain a log to track and document status. At a minimum the log shall contain the RFI identifier, date submitted, date returned, status, and a section for comments. SUBCONTRACTOR shall provide an updated copy of this log at each weekly Project Status Meeting for review.

RFI’s that request a specific date for a required response should be monitored for a response and, if no response has been issued three (3) days before the response is due, the originator should contact CONTRACTOR to ascertain the status of the response. CONTRACTOR will target to respond to most RFI’s with three (3) working days and all RFI’s within two (2) weeks.

The RFI may not be used to request deviations to the Subcontract. See the Supplier Deviation Disposition Request (SDDR) section of the Subcontract Documents for deviations. CONTRACTOR responses to RFIs shall not be construed as permission to deviate from contract requirements. RFI’s are not authorized change documents and cannot be used to direct a change in subcontract requirements. If CONTRACTOR’S response on the RFI has a cost and/or schedule effect, it is the SUBCONTRACTOR’S responsibility to immediately advise CONTRACTOR’S Procurement Specialist with a SUBCONTRACTOR Change Proposal. Work undertaken without CONTRACTOR authorization is at the SUBCONTRACTOR’S risk and expense.