Exhibit_C_Form_H_Resume_of_Key_Personnel_-_FINAL.doc

DOC document 51 KB Posted

Attached to
MDA Soil Vapor Monitoring
Solicitation number
RFP-0000476
Issued by

About this file

Exhibit C Form H Resume of Key Personnel

View the file

Other files

File Type Posted
Exhibit_D_MDA_Vapor_Monitoring_FINAL_Rev1.doc DOC document
RFP-0000476_MDA_Final_Rev._1.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule_-_FINAL.doc DOC document
RFP-0000476_Amendment_1_Rev_0_071619.docx DOCX document
map_19-0011-07_MDA_H_wells.pdf PDF
IMG_0173.jpg JPG image
IMG_0157.jpg JPG image
Appendix_D_2_N3B_RFI.docx DOCX document
IMG_0177.jpg JPG image
Appendix_D_5.docx DOCX document
IMG_0146.jpg JPG image
N3B-SOP-ER-2008.pdf PDF
WCSF_Vapor_Sampling_DRAFT.pdf PDF
RFP-0000476_MDA_Final.pdf PDF
IMG_0158.jpg JPG image
MDA_SVM_Training_Matrix_Rev0.docx DOCX document
IMG_0154.jpg JPG image
N3B-ER-SOP-20235.pdf PDF
IMG_0271.JPG JPG image
Certificate_of_Current_Cost_or_Pricing_Data.pdf PDF
Exhibit_C_FORM_F_Project_Organization_and_Workplan.doc DOC document
IMG_0141.jpg JPG image
IMG_0183.jpg JPG image
EX-I_Attachement_B_-_Subcontractor_Submittals__MDA_SVM.doc DOC document
IMG_0266.JPG JPG image
MDA_L_-_Periodic_Monitoring_Report_for_Vapor_Sampling_-_Second_Quarter_FY11_LA-UR-11-4246.pdf PDF
N3B-AP-ER-1001.pdf PDF
IMG_0268.JPG JPG image
IMG_0253.JPG JPG image
Insurance_Requirements_RFP-0000476.pdf PDF
IMG_0167.jpg JPG image
EX-H_Final.pdf PDF
IMG_0138.jpg JPG image
manifold.jpg JPG image
Exhibit_C_FORM_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_G_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_SDDR_Form_2178.pdf PDF
map_19-0011-05_TA21_wells.pdf PDF
IMG_0181.jpg JPG image
Exhibit_C_FORM_B_Construction_Plant_Equipment_List.doc DOC document
IMG_0269.JPG JPG image
switches.jpg JPG image
IMG_0151.jpg JPG image
IMG_0172.jpg JPG image
IMG_0252.JPG JPG image
Exhibit_C_FORM_C-1_Lower_Tier_Experience_Statement.doc DOC document
N3B-ER-SOP-10094.pdf PDF
Exhibit_C_Form_A_-_MDA_Vapor_Monitoring_FINAL.docx DOCX document
collecting_tritium_samples.jpg JPG image
N3B-ER-SOP-20145.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ex C Form H (Rev. 1, 9/22/08) Exhibit C Form H – Resumes of Key Personnel August 22, 2019

EXHIBIT “C”

FORM H

RESUMES OF KEY PERSONNEL

Bidder shall provide a resume (no more than 2 pages per person) for each key person to be assigned to the Subcontract, containing at least the following information for each person. Attach and properly designate additional pages, if necessary.

a.

Name:

b.

Title c.

Position d.

Education/Qualifications:

e.

Present Position in Bidder’s Company:

f.

Relevant Experience:

g.

Employment History:

h.

Citizenship:

Resumes are required for the following positions: PN: List positions for which resumes are required. Resumes are generally required for the Project Manager, Site/Construction Manager, Lead Site Engineers, Scheduling Engineers, Safety personnel (See Form G) and Lead Site Supervisors, all of whom would be assigned full time to the Subcontract.

· Project Manager

KEY PERSONNEL

· Field Team Leader(s)/Project Superintendent

· ES&H Specialist(s)

PN: When appropriate, include the optional Special Condition titled “KEY PERSONNEL” in Exhibit “B” and add the following sentence.

KEY PERSONNEL MINIMUM QUALIFICATIONS

Key personnel must meet minimum requirements listed here and in RFP-0000476 Section 9.2.1.3 Personnel Qualifications and Certifications. The key personnel listed below are an essential and material consideration for this subcontract. Any change to key personnel will be required to meet minimum qualifications listed herein and is subject to CONTRACTOR approval. Nominated personnel shall be made available for interview during any negotiations.

KEY PERSONNEL
MINIMUM QUALIFICATIONS
Project Manager
Shall have a bachelor’s degree in an environmental engineering or science discipline from a recognized institution of higher learning with at least ten (10) years of relevant practical management experience on projects involving radiological and hazardous materials. Shall have experience in managing government related contracts of the magnitude, nature and complexity of the scope of work under this subcontract and shall possess a working knowledge of FAR and DEAR regulations. Shall possess excellent verbal and written communication skills. Shall have the ability to anticipate change and to adjust promptly and effectively, and to establish and maintain strong and effective customer relations and communiations.
Field Team Lead/ Project Superintendent
Shall have a minimum of four (4) years of practical management experience supervising field sampling and remediation projects of similar magnitude and complexity involving radiological and hazardous materials. Demonstrated successful completion of major field projects with elements of drilling, extensive sampling, site configuration and laydown, heavy equipment management and maintenance, application of remediation techniques to contaminated land areas and facilities, management of characterization sampling and remediation programs. Shall possess excellent verbal and written communication skills.
ES&H Representative
Refer to Exhibit F, Section 4.0, for ES&H Specialist qualification requirements.

PR# RFP-0000300

File details come from the government source that posted it.