Exhibit_C_FORM_F_Project_Organization_and_Workplan.doc

DOC document 51 KB Posted

Attached to
MDA Soil Vapor Monitoring
Solicitation number
RFP-0000476
Issued by

About this file

Exhibit C Form F Project Organization and Workplan

View the file

Other files

File Type Posted
Exhibit_D_MDA_Vapor_Monitoring_FINAL_Rev1.doc DOC document
RFP-0000476_MDA_Final_Rev._1.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule_-_FINAL.doc DOC document
RFP-0000476_Amendment_1_Rev_0_071619.docx DOCX document
map_19-0011-07_MDA_H_wells.pdf PDF
IMG_0173.jpg JPG image
IMG_0157.jpg JPG image
Appendix_D_2_N3B_RFI.docx DOCX document
IMG_0177.jpg JPG image
Appendix_D_5.docx DOCX document
IMG_0146.jpg JPG image
N3B-SOP-ER-2008.pdf PDF
WCSF_Vapor_Sampling_DRAFT.pdf PDF
RFP-0000476_MDA_Final.pdf PDF
IMG_0158.jpg JPG image
MDA_SVM_Training_Matrix_Rev0.docx DOCX document
IMG_0154.jpg JPG image
N3B-ER-SOP-20235.pdf PDF
IMG_0271.JPG JPG image
Certificate_of_Current_Cost_or_Pricing_Data.pdf PDF
IMG_0141.jpg JPG image
IMG_0183.jpg JPG image
EX-I_Attachement_B_-_Subcontractor_Submittals__MDA_SVM.doc DOC document
IMG_0266.JPG JPG image
MDA_L_-_Periodic_Monitoring_Report_for_Vapor_Sampling_-_Second_Quarter_FY11_LA-UR-11-4246.pdf PDF
N3B-AP-ER-1001.pdf PDF
IMG_0268.JPG JPG image
IMG_0253.JPG JPG image
Insurance_Requirements_RFP-0000476.pdf PDF
IMG_0167.jpg JPG image
EX-H_Final.pdf PDF
IMG_0138.jpg JPG image
manifold.jpg JPG image
Exhibit_C_FORM_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_G_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_SDDR_Form_2178.pdf PDF
map_19-0011-05_TA21_wells.pdf PDF
IMG_0181.jpg JPG image
Exhibit_C_Form_H_Resume_of_Key_Personnel_-_FINAL.doc DOC document
Exhibit_C_FORM_B_Construction_Plant_Equipment_List.doc DOC document
IMG_0269.JPG JPG image
switches.jpg JPG image
IMG_0151.jpg JPG image
IMG_0172.jpg JPG image
IMG_0252.JPG JPG image
Exhibit_C_FORM_C-1_Lower_Tier_Experience_Statement.doc DOC document
N3B-ER-SOP-10094.pdf PDF
Exhibit_C_Form_A_-_MDA_Vapor_Monitoring_FINAL.docx DOCX document
collecting_tritium_samples.jpg JPG image
N3B-ER-SOP-20145.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ex C Form F (Rev. 1, 9/22/08) Exhibit C Form F – Project Organization and Work Plan August 27, 2019

EXHIBIT “C”

FORM F

PROJECT ORGANIZATION AND WORK PLAN

Bidder shall attach an organization chart with titles of key personnel, numbers and categories of home office and field personnel to include lower-tier subcontractors. Bidder shall provide a written description of the organization, defining lines of authority/responsibility/communication and the overall working of the organization with particular emphasis on Home Office/Site interfaces and the procedures for monitoring and controlling the Work.

Bidder shall attach a detailed narrative, not to exceed 15 pages, describing its plan for fully executing and effectively planning and sequencing the work described in Exhibit D, base scope Soil Vapor Sampling at MDA-C and MDA-L; along with optional scope Soil Vapor Sampling at MDA-G, MDA-H, MDA-T and MDA-A. Ability to complete Field Summary Report and Periodic Monitoring Reports within contracted periods.

Bidder shall demonstrate to the Offeror that they can meet the scheduling and execution requirements of the Exhibit D Statement of Work under this Subcontract.

The execution plan should be developed in conjunction with the preliminary schedule, organization chart, resumes, equipment list and proposed suppliers/subcontractors to combine this information together and explain the management of and flow of work to Subcontract conclusion. This plan shall address the following elements.

a. An explanation of the work plan by resource category for the schedule developed in response to this form.

b. An explanation of the technical approach the Bidder would implement in accomplishing the scope described herein to include:

· Prepare information for the Readiness Review and Mobilization, including a list of required training for field personnel based on the task they are conducting and a list of all documents, permits (including issuing organization), and approvals necessary to begin field work.

· Perform safety monitoring requirements in accordance with Exhibit

· Approach to MDA Soil Vapor Sampling at all sites.

· Approach to preparing Field Summary Reports (FSR)

· Approach for preparing Periodic Monitoring Reports (PMR)

· Waste minimization techniques and activities.

· Project turnover.

· Demobilization.

NOTE: Responses to Exhibit C, Project Organization and Work Plan will be used only for Technical Acceptability. Offeror’s shall not provide pricing data information with this Form.

THIS FORM IS PRIMARILY FOR BID EVALUATION HOWEVER IS NOT PRECLUDED FROM BECOMING PART OF A RESULTANT SUBCONTRACT.

PR# RFP-0000476

File details come from the government source that posted it.