Ex C Form A (LS) (Rev. B, 02/20/2019) Exhibit C Form A, Schedule of Quantities and Prices Revision #B, Dated 02/20/2019
EXHIBIT “C”
FORM A
SCHEDULE OF QUANTITIES AND PRICES
MDA VAPOR MONITORING
1.0 WORK TO BE PERFORMED
Complete the Material Disposal Area (MDA) Vapor Monitoring Base and Optional Scope work in accordance with the requirements of all Subcontract Documents.
2.0 BASE SCOPE LUMP SUM PRICING
The Total Lump Sum Price for performing all base scope work is $__________________. The breakdown of this Lump Sum Price against pay items are detailed below. The following items under 2.0 “Base Scope” are to be used for measured monthly progress payments. NOTE: The distribution of cost / pricing allocated to each of the below pay items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process. Bold numerical indicators below refer to Exhibit D sections.
| Item |
| Description |
| Unit |
| Total Units |
| Lump Sum |
| 2.1 |
| Submittals/Preparedness Review Documents |
| 1 |
| 1 |
| LS |
| 2.2 |
| Base Scope: Collection of MDA C vapor samples for tritium and VOC’s |
| 1 |
| 4 |
| LS |
| 2.3 |
| Base Scope: Collection of MDA L vapor samples for tritium and VOC’s |
| 1 |
| 4 |
| LS |
| 2.4 |
| Base Scope: MDA C Field Summary Report |
| 1 |
| 4 |
| LS |
| 2.5 |
| Base Scope: MDA L Field Summary Repot |
| 1 |
| 4 |
| LS |
| 2.6 |
| Base Scope: MDA C Periodic Monitoring Report |
| 1 |
| 2 |
| LS |
| 2.7 |
| Base Scope: MDA L Periodic Monitoring Report |
| 1 |
| 2 |
| LS |
| TOTAL FIRM FIXED PRICE |
| LS |
| 1 |
3.0 OPTIONAL SCOPE LUMP SUM PRICING
The breakdown of this Lump Sum Price against pay items is detailed below. Payment for additional work in “Optional Scope” will be paid by the “Unit” until the total unit quantities are met. The additional item quantities required to complete the SOW are unknown; therefore, none, a portion of, or all of the optional scope may be executed. NOTE: The distribution of cost / pricing allocated to each of the below pay items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process.
| Item |
| Description |
| Unit |
| Total Units |
| Lump Sum Rate |
| Optional Scope Preparedness Review Documents |
| 1 |
| 1-4 |
| LS |
| 3.1 |
| Optional Scope 1: Collection of MDA A vapor samples for tritium and VOC’s |
| 1 |
| 1-4 |
| LS |
| 3.2 |
| Optional Scope 2: Collection of MDA-T vapor samples for tritium and VOC’s |
| 1 |
| 1-4 |
| LS |
| 3.3 |
| Optional Scope 3: Collection of MDA G vapor samples for tritium and VOC’s |
| 1 |
| 1-4 |
| LS |
| 3.4 |
| Optional Scope 4: Collection of MDA H vapor samples for tritium and VOC’s |
| 1 |
| 1-4 |
| LS |
| 3.5 |
| Optional Scope: Field Summary Report |
| 1 |
| 1-4 |
| LS |
| 3.6 |
| Optional Scope: Periodic Monitoring Report |
| 1 |
| 1-2 |
| LS |
| 3.7 |
| Optional Scope: Area G site specific training |
| 1 |
| 1 |
| LS |
| TOTAL FIRM FIXED PRICE |
| LS |
| 1 |
4.0 FIXED UNIT RATE PRICING
The following unit rate prices for changes shall be full and complete compensation for additional work or credit for deleted work. Prices are inclusive of all costs including, but not limited to labor, material, services, overhead and profit. Because these are all-inclusive rates (inclusive of overhead and profit), they are not for use as component rates in negotiated changes where overhead and profit are separately determined. NOTE: The cost / pricing allocated to each of the below Unit Rate items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process.
| Item |
| Description |
| Unit |
| Unit Rate |
| 4.1 |
| Investigation/re-sample 0’-50’(bgs) |
| 1 |
| 4.2 |
| Investigation/re-sample 51’-100’ (bgs) |
| 1 |
| 4.3 |
| Investigation/re-sample 101’-150’(bgs) |
| 1 |
| 4.4 |
| Investigation/re-sample 151’-200’ (bgs) |
| 1 |
| 4.5 |
| Investigation/re-sample 201’-250’ (bgs) |
| 1 |
| 4.6 |
| Investigation/re-sample 251’-300’ (bgs) |
| 1 |
| 4.7 |
| Investigation/re-sample 301’-350’ (bgs) |
| 1 |
| 4.8 |
| Investigation/re-sample 351’-400’ (bgs) |
| 1 |
| 4.9 |
| Investigation/re-sample 401’-450’ (bgs) |
| 1 |
| 4.11 |
| Investigation/re-sample 451’-500’ (bgs) |
| 1 |
| 4.12 |
| Investigation/re-sample 501’-550’ (bgs) |
| 1 |
| 4.13 |
| Investigation/re-sample 551’-600’ (bgs) |
| 1 |
| 4.14 |
| Investigation/re-sample 601’-650’ (bgs) |
| 1 |
| 4.15 |
| Investigation/re-sample 651’-700’ (bgs) |
| 1 |
| 4.16 |
| Investigation/re-sample 701’-750’ (bgs) |
| 1 |
| 4.17 |
| Investigation/re-sample 751’-800’ (bgs) |
| 1 |
| 4.18 |
| Investigation/re-sample 801’-850’(bgs) |
| 1 |
| 4.19 |
| Investigation/re-sample 851’-900’ (bgs) |
| 1 |
| 4.20 |
| Investigation/re-sample 901’-950’ (bgs) |
| 1 |
| 4.21 |
| Investigation/re-sample 951’-1000’ (bgs) |
| 1 |
5.0 ADJUSTMENTS
All prices are fixed for the duration of the Subcontract and are not subject to escalation for any cause. Payment of the Total Lump Sum Price shall constitute full payment for performance of the Work and covers all costs of whatever nature incurred by SUBCONTRACTOR in accomplishing the Work in accordance with the provisions of this Subcontract.
SUBCONTRACTOR shall maintain all work in progress until it is accepted. SUBCONTRACTOR shall repair, rework or replace, as necessary, any damage or lost work due to normal wear and tear, anticipated events, or conditions within its control. No separate payment shall be made for such maintenance costs which are deemed included in the original Subcontract price. Any failure to maintain the Work shall be considered a defect in accordance with the General Condition titled “WARRANTY.”
6.0 REQUIRED SUBMITTALS
The following submittals are prerequisite to payment for mobilization:
| 6.1 | Subcontract cost-loaded schedule and spend plan |
| 6.2 | Insurance Certificates, Insurance Endorsements |
| 6.3 | SSESHP Plan |
| 6.4 | Preparedness Concurrence Meeting submittals. Includes all ESH and security documents as required by Exhibits D, F, G, and I. |
| 6.5 | Proof of completed training per Exhibit D, Appendix D-7 - Training Requirements Matrix |
| 6.6 | Project Execution Plan (PEP) |
| 6.7 | Project specific Sample and Analysis Plan (SAP) |
| 6.8 | Identification of Key Personnel |
Subcontract No. 0000000 Exhibit C – Quantities, Pricing and Data Form A – Schedule of Quantities and Prices (Lump Sum)