Exhibit C Form A -MDA Vapor Monitoring_FINAL

View the file

Other files

File Type Posted
Exhibit_D_MDA_Vapor_Monitoring_FINAL_Rev1.doc DOC document
RFP-0000476_MDA_Final_Rev._1.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule_-_FINAL.doc DOC document
RFP-0000476_Amendment_1_Rev_0_071619.docx DOCX document
map_19-0011-07_MDA_H_wells.pdf PDF
IMG_0173.jpg JPG image
IMG_0157.jpg JPG image
Appendix_D_2_N3B_RFI.docx DOCX document
IMG_0177.jpg JPG image
Appendix_D_5.docx DOCX document
IMG_0146.jpg JPG image
N3B-SOP-ER-2008.pdf PDF
WCSF_Vapor_Sampling_DRAFT.pdf PDF
RFP-0000476_MDA_Final.pdf PDF
IMG_0158.jpg JPG image
MDA_SVM_Training_Matrix_Rev0.docx DOCX document
IMG_0154.jpg JPG image
N3B-ER-SOP-20235.pdf PDF
IMG_0271.JPG JPG image
Certificate_of_Current_Cost_or_Pricing_Data.pdf PDF
Exhibit_C_FORM_F_Project_Organization_and_Workplan.doc DOC document
IMG_0141.jpg JPG image
IMG_0183.jpg JPG image
EX-I_Attachement_B_-_Subcontractor_Submittals__MDA_SVM.doc DOC document
IMG_0266.JPG JPG image
MDA_L_-_Periodic_Monitoring_Report_for_Vapor_Sampling_-_Second_Quarter_FY11_LA-UR-11-4246.pdf PDF
N3B-AP-ER-1001.pdf PDF
IMG_0268.JPG JPG image
IMG_0253.JPG JPG image
Insurance_Requirements_RFP-0000476.pdf PDF
IMG_0167.jpg JPG image
EX-H_Final.pdf PDF
IMG_0138.jpg JPG image
manifold.jpg JPG image
Exhibit_C_FORM_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_G_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_SDDR_Form_2178.pdf PDF
map_19-0011-05_TA21_wells.pdf PDF
IMG_0181.jpg JPG image
Exhibit_C_Form_H_Resume_of_Key_Personnel_-_FINAL.doc DOC document
Exhibit_C_FORM_B_Construction_Plant_Equipment_List.doc DOC document
IMG_0269.JPG JPG image
switches.jpg JPG image
IMG_0151.jpg JPG image
IMG_0172.jpg JPG image
IMG_0252.JPG JPG image
Exhibit_C_FORM_C-1_Lower_Tier_Experience_Statement.doc DOC document
N3B-ER-SOP-10094.pdf PDF
collecting_tritium_samples.jpg JPG image
N3B-ER-SOP-20145.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ex C Form A (LS) (Rev. B, 02/20/2019) Exhibit C Form A, Schedule of Quantities and Prices Revision #B, Dated 02/20/2019

EXHIBIT “C”

FORM A

SCHEDULE OF QUANTITIES AND PRICES

MDA VAPOR MONITORING

1.0 WORK TO BE PERFORMED

Complete the Material Disposal Area (MDA) Vapor Monitoring Base and Optional Scope work in accordance with the requirements of all Subcontract Documents.

2.0 BASE SCOPE LUMP SUM PRICING

The Total Lump Sum Price for performing all base scope work is $__________________. The breakdown of this Lump Sum Price against pay items are detailed below. The following items under 2.0 “Base Scope” are to be used for measured monthly progress payments. NOTE: The distribution of cost / pricing allocated to each of the below pay items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process. Bold numerical indicators below refer to Exhibit D sections.

Item
Description
Unit
Total Units
Lump Sum
2.1
Submittals/Preparedness Review Documents
1
1
LS
2.2
Base Scope: Collection of MDA C vapor samples for tritium and VOC’s
1
4
LS
2.3
Base Scope: Collection of MDA L vapor samples for tritium and VOC’s
1
4
LS
2.4
Base Scope: MDA C Field Summary Report
1
4
LS
2.5
Base Scope: MDA L Field Summary Repot
1
4
LS
2.6
Base Scope: MDA C Periodic Monitoring Report
1
2
LS
2.7
Base Scope: MDA L Periodic Monitoring Report
1
2
LS
TOTAL FIRM FIXED PRICE
LS
1

3.0 OPTIONAL SCOPE LUMP SUM PRICING

The breakdown of this Lump Sum Price against pay items is detailed below. Payment for additional work in “Optional Scope” will be paid by the “Unit” until the total unit quantities are met. The additional item quantities required to complete the SOW are unknown; therefore, none, a portion of, or all of the optional scope may be executed. NOTE: The distribution of cost / pricing allocated to each of the below pay items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process.

Item
Description
Unit
Total Units
Lump Sum Rate
Optional Scope Preparedness Review Documents
1
1-4
LS
3.1
Optional Scope 1: Collection of MDA A vapor samples for tritium and VOC’s
1
1-4
LS
3.2
Optional Scope 2: Collection of MDA-T vapor samples for tritium and VOC’s
1
1-4
LS
3.3
Optional Scope 3: Collection of MDA G vapor samples for tritium and VOC’s
1
1-4
LS
3.4
Optional Scope 4: Collection of MDA H vapor samples for tritium and VOC’s
1
1-4
LS
3.5
Optional Scope: Field Summary Report
1
1-4
LS
3.6
Optional Scope: Periodic Monitoring Report
1
1-2
LS
3.7
Optional Scope: Area G site specific training
1
1
LS
TOTAL FIRM FIXED PRICE
LS
1

4.0 FIXED UNIT RATE PRICING

The following unit rate prices for changes shall be full and complete compensation for additional work or credit for deleted work. Prices are inclusive of all costs including, but not limited to labor, material, services, overhead and profit. Because these are all-inclusive rates (inclusive of overhead and profit), they are not for use as component rates in negotiated changes where overhead and profit are separately determined. NOTE: The cost / pricing allocated to each of the below Unit Rate items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process.

Item
Description
Unit
Unit Rate
4.1
Investigation/re-sample 0’-50’(bgs)
1
4.2
Investigation/re-sample 51’-100’ (bgs)
1
4.3
Investigation/re-sample 101’-150’(bgs)
1
4.4
Investigation/re-sample 151’-200’ (bgs)
1
4.5
Investigation/re-sample 201’-250’ (bgs)
1
4.6
Investigation/re-sample 251’-300’ (bgs)
1
4.7
Investigation/re-sample 301’-350’ (bgs)
1
4.8
Investigation/re-sample 351’-400’ (bgs)
1
4.9
Investigation/re-sample 401’-450’ (bgs)
1
4.11
Investigation/re-sample 451’-500’ (bgs)
1
4.12
Investigation/re-sample 501’-550’ (bgs)
1
4.13
Investigation/re-sample 551’-600’ (bgs)
1
4.14
Investigation/re-sample 601’-650’ (bgs)
1
4.15
Investigation/re-sample 651’-700’ (bgs)
1
4.16
Investigation/re-sample 701’-750’ (bgs)
1
4.17
Investigation/re-sample 751’-800’ (bgs)
1
4.18
Investigation/re-sample 801’-850’(bgs)
1
4.19
Investigation/re-sample 851’-900’ (bgs)
1
4.20
Investigation/re-sample 901’-950’ (bgs)
1
4.21
Investigation/re-sample 951’-1000’ (bgs)
1

5.0 ADJUSTMENTS

All prices are fixed for the duration of the Subcontract and are not subject to escalation for any cause. Payment of the Total Lump Sum Price shall constitute full payment for performance of the Work and covers all costs of whatever nature incurred by SUBCONTRACTOR in accomplishing the Work in accordance with the provisions of this Subcontract.

SUBCONTRACTOR shall maintain all work in progress until it is accepted. SUBCONTRACTOR shall repair, rework or replace, as necessary, any damage or lost work due to normal wear and tear, anticipated events, or conditions within its control. No separate payment shall be made for such maintenance costs which are deemed included in the original Subcontract price. Any failure to maintain the Work shall be considered a defect in accordance with the General Condition titled “WARRANTY.”

6.0 REQUIRED SUBMITTALS

The following submittals are prerequisite to payment for mobilization:

6.1Subcontract cost-loaded schedule and spend plan
6.2Insurance Certificates, Insurance Endorsements
6.3SSESHP Plan
6.4Preparedness Concurrence Meeting submittals. Includes all ESH and security documents as required by Exhibits D, F, G, and I.
6.5Proof of completed training per Exhibit D, Appendix D-7 - Training Requirements Matrix
6.6Project Execution Plan (PEP)
6.7Project specific Sample and Analysis Plan (SAP)
6.8Identification of Key Personnel

Subcontract No. 0000000 Exhibit C – Quantities, Pricing and Data Form A – Schedule of Quantities and Prices (Lump Sum)