RFP-0000476_Amendment_1_Rev_0_071619.docx

DOCX document 33 KB Posted

Attached to
MDA Soil Vapor Monitoring
Solicitation number
RFP-0000476
Issued by

About this file

RFP-0000476 Amendment 1 Rev 0

View the file

Other files

File Type Posted
Exhibit_D_MDA_Vapor_Monitoring_FINAL_Rev1.doc DOC document
RFP-0000476_MDA_Final_Rev._1.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule_-_FINAL.doc DOC document
map_19-0011-07_MDA_H_wells.pdf PDF
IMG_0173.jpg JPG image
IMG_0157.jpg JPG image
Appendix_D_2_N3B_RFI.docx DOCX document
IMG_0177.jpg JPG image
Appendix_D_5.docx DOCX document
IMG_0146.jpg JPG image
N3B-SOP-ER-2008.pdf PDF
WCSF_Vapor_Sampling_DRAFT.pdf PDF
RFP-0000476_MDA_Final.pdf PDF
IMG_0158.jpg JPG image
MDA_SVM_Training_Matrix_Rev0.docx DOCX document
IMG_0154.jpg JPG image
N3B-ER-SOP-20235.pdf PDF
IMG_0271.JPG JPG image
Certificate_of_Current_Cost_or_Pricing_Data.pdf PDF
Exhibit_C_FORM_F_Project_Organization_and_Workplan.doc DOC document
IMG_0141.jpg JPG image
IMG_0183.jpg JPG image
EX-I_Attachement_B_-_Subcontractor_Submittals__MDA_SVM.doc DOC document
IMG_0266.JPG JPG image
MDA_L_-_Periodic_Monitoring_Report_for_Vapor_Sampling_-_Second_Quarter_FY11_LA-UR-11-4246.pdf PDF
N3B-AP-ER-1001.pdf PDF
IMG_0268.JPG JPG image
IMG_0253.JPG JPG image
Insurance_Requirements_RFP-0000476.pdf PDF
IMG_0167.jpg JPG image
EX-H_Final.pdf PDF
IMG_0138.jpg JPG image
manifold.jpg JPG image
Exhibit_C_FORM_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_G_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_SDDR_Form_2178.pdf PDF
map_19-0011-05_TA21_wells.pdf PDF
IMG_0181.jpg JPG image
Exhibit_C_Form_H_Resume_of_Key_Personnel_-_FINAL.doc DOC document
Exhibit_C_FORM_B_Construction_Plant_Equipment_List.doc DOC document
IMG_0269.JPG JPG image
switches.jpg JPG image
IMG_0151.jpg JPG image
IMG_0172.jpg JPG image
IMG_0252.JPG JPG image
Exhibit_C_FORM_C-1_Lower_Tier_Experience_Statement.doc DOC document
N3B-ER-SOP-10094.pdf PDF
Exhibit_C_Form_A_-_MDA_Vapor_Monitoring_FINAL.docx DOCX document
collecting_tritium_samples.jpg JPG image
N3B-ER-SOP-20145.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP-0000476

MDA Soil Vapor Monitoring Amendment 1 September 16, 2019 Included

1. Exhibit C Form D, Subcontract Schedule

2. Exhibit D Scope of Work and Technical Requirements

3. RFP-0000476_MDA Final Rev. 1

1. Would N3B please consider extending the proposal due date?
Response to the RFP will be extended to COB 09/30/2019
2. RFP 9.2.1.2 Past Performance – How critical is it to be able to demonstrate sampling experience for tritium in vapor monitoring wells?
Sub-contractor must be able to provide past experience to complete Scope of Work per N3B-SOP-ER-2008, R1; Sampling Sub-Surface Vapor.
3. Certificate of Current Cost of Pricing Data form was included in the RFP package but not mentioned in the RFP itself. Please confirm if it is required or not, and if required in which volume should it be included.
The Certificate of Cost and Pricing Data is referenced in Section 17.0 of the RFP. Certificate of Cost and Pricing Data will be required for proposal amounts $750K and greater.
4. Please provide Exhibit C Form D, Subcontract Schedule.
Provided with Amendment #1
5. Should NMGRT be included in lump sum price?
N3B will offer a first-tier exemption for NMGRT. This exemption can not be extended beyond the first tier.

6. Is 45 days to receive off site analytical results and write the PMR realistic? As an alternative, is it possible to have the PMR due date linked to the return-date of data, for example 30 days after receipt of analytical results?

Agreed. Base and Optional Scope reporting requirments for FSR will be submitted 30 days after final analaytical reports received by sub-contractor. PMR draft report submitted 45 days after receipt of final analytical reports.

7. For scheduling, are the days stated in the RFP days work days or calendar days?

Calendar

8. Section 3.3.7 of the SOW makes the following statement: “All Base and Optional scope sampling campaigns shall include pricing for mobilization, demobilization, well sampling, Sample Management Office requirements, transportation, waste packaging and any other requirements to complete the above scope.” Could you provide clarification on what is included in SMO Requirements?

Issuing daily samples, picking up sampling equipment from SMO, etc.

9. The RFP uses the professional titles ES&H Specialist and ES&H Representative in multiple locations. Could you clarify what the requirements are for the Key Personnel as well as for field oversight?
Per EX-F 4.0, an ES&H representative, option C is required for the project. Please refer to sub clauses F4.11-F4.14 for verification.

10. Section 3.5.2 lists a FIP, but the FIP is not listed in Ex. I. Is FIP required?

A Project Execution Plan will be required prior to field implementation, the FIP call out will be removed from the EX-D.

11. What is the approximate time required to complted the sampling events at MDA-C and MDA-L?

Historically MDA-C sampling has been completed in 3-4 weeks.

12. What is the estimated time to complete the sampling events at the MDAs included in the Optional Scope section of the RFP?

Unknown. Subcontractor can estimate with historical sampling time table from MDA-C.

13. Will the Tritium sample collection manifold be provided?

No

14. Are the silica gel cartridges for tritium sampling provided to the subcontractor from the SMO?
We have the tritium columns at the SMO and can provide those to the awarded subcontractor. We don’t however, provide the silica gel or dry the silica gel for them. The subcontractor who has been performing the work in the past has their own drying oven, calibrated scale, and PID/monitoring devices. These are items that the subcontractor must provide. For the VOCs the SMO orders the amount of SUMMA canisters required in the SAP from the analytical lab. When the subcontractor orders their paperwork from us they will also let us know how many summas (including QC and a few extras in case of poor vacuum) and we will set up a schedule with the analytical laboratory based on the sampling schedule for delivery and receipt of the SUMMAs.
15. What vapor sampling equipment is government owned property and will be available to the subcontractor during semiannual samplking events/
Please note answer #14.
16. How many borehole require packers?
A packer is installed at MDA-L, well 54-24399 and will require inflation. MDA-G well 54-25105 will require a packer if optioned.
17. Are the packers dedicated at each borehole? Will the subcontractor be required to purchase packers?
Please note answer #16.
18. During previous sampling events, was a pulling rig or tripod used for placing the packer system?
Unknown.
19. May we have a copy of the NMED approved work plan?
An NMED work plan is not available.
20. Please provide Exhibit C Form D- Subcontract Schedule. We were not able to locate this document in the RFP.
See answer given in question #4.

Bidder acknowledges receipt (Signed Amendment #1 must be included with proposal submission)

By: ______________________________________________(Signature)

_____________________________________________(Printed Name)

_____________________________________________(Title) image1.png

File details come from the government source that posted it.