N3B-SOP-ER-2008.pdf
PDF 768 KB Posted
- Attached to
- MDA Soil Vapor Monitoring
- Solicitation number
- RFP-0000476
About this file
Appendix D-10 N3B-SOP-ER-2008
View the file
Other files
Show 40 more
Latest 50 of 86 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3B-SOP-ER-2008, R0
Sampling Subsurface Vapor
Effective Date: 3/4/19
Next Review Date: 3/4/22
Hazard Class: Low Moderate High/Complex Usage Mode: Reference UET Both UET & Reference
The Responsible Manager has determined that the following organizations’ review is required for initial procedure release as well as subsequent major revisions. Review documentation is contained in the Document History File.
Technical Lead Quality Assurance Waste Management Training Environmental Compliance
Classification Review: Unclassified UCNI Classified
Ernest Elliott / 135267 / Signature on File / 2/25/19 Name (print) Z# Signature Date
Responsible Manager
Kent Rich / 177319 / Signature on File / 2/25/19 Name (print) Z# Signature Date
Working Copy / Information Only (circle one) Initials / Date: /
RFP-0000476
Document No.: N3B-SOP-ER-2008 Sampling Subsurface Vapor Revision: 0
Effective Date: 3/4/19 Reference Page: 2 of 25
REVISION HISTORY
Document No./Revision No. Effective Date Action Description
ER-SOP-20294, R0 Unknown Major
Update procedure for subsurface vapor sampling. Procedure will remove references to B&K instrument which is no longer used.
Procedure needs to be updated to the new format. New number - supersedes EP-ERSS-
SOP-5074.
N3B-SOP-ER-2008, R0 3/4/19 Major Updated references and technical content to reflect N3B processes; new number assigned.
This document supercedes Blue Sheeted ER-
SOP-20294.
Reference Page: 3 of 25
TABLE OF CONTENTS
Section Page
TITLE PAGE
REVISION HISTORY
TABLE OF CONTENTS
1. PURPOSE
2. SCOPE
3. REFERENCES
4. PRECAUTIONS AND LIMITATIONS
5. PREREQUISITE ACTIONS
5.1 Planning and Coordination
5.2 Special Tools and Equipment, Parts, and Supplies
6. SAMPLING SUBSURFACE VAPOR
6.1 Develop Field Data Collection Forms
6.2 Periodic Evaluation of Silica Gel Bound Water Percentage for Tritium Sampling
6.3 Preparation of Tritium Cartridges Prior to Field Deployment
6.4 Preparation of Packer System Prior to Field Deployment
6.5 Planning for QA/QC Samples
6.6 Pre-Sampling Activities
6.7 Daily Field Operational Check of Screening Instruments
6.8 Preparation and Installation of Packer Systems
6.9 Sampling Activities at a Borehole: Purging and Screening
6.10 SUMMA Canister Sampling
6.11 Collect SUMMA Canister QA/QC Samples
6.12 Tritium Sampling
6.13 Collect Tritium QA/QC Samples
6.14 Complete Sampling through the Packer System
6.15 Post-sampling Activities
7. RECORDS PROCESSING
8. ATTACHMENTS
Attachments Attachment 1, Sampling Considerations Attachment 2, Silica Gel Bound Water Percentage Worksheet Attachment 3, Daily QA/QC Operational Checks for Landtec or MultiRAE IR Multigas Monitor Instruments Attachment 4, Purge/Screening Using Landtec or MultiRAE IR Multigas Monitor
Effective Date: 3/4/19 Reference Page: 4 of 25
1. PURPOSE
The purpose of this procedure is to describe the process of sampling subsurface air for vapor phase contaminants for the Newport News Nuclear BWXT-Los Alamos, LLC (N3B) Environmental Remediation (ER) Program.
2. SCOPE
Sampling systems and sampling equipment vary between sampling projects; therefore, all portions of this procedure are not required for every port that is sampled. All sections of the procedure applicable to a single type of sampling system or equipment are required and are followed in the order presented. The individual work plan will specify the sampling systems and the samples to be collected using this procedure.
The sample train, sample containers, and sampling systems are the primary components of the sub-atmospheric air-sampling system. N3B ER uses two types of sampling systems:
• Down-hole packer(s) – removable devices that isolate the sample depth interval within the borehole or casing.
• Stainless steel tubing system with sampling ports permanently installed at specific depths.
Sampling ports are surrounded by a sand filter pack. Bentonite seals are place above and below the sand pack to prevent soil air flow between ports.
The sample train may be fitted with or adapted to various field screening instruments, such as an air-flow gauge, vacuum gage, a photo-ionization detector (PID), a Lantec gas extraction meter, MultiRAE IR Multigas Monitor, or gas chromatograph/mass spectrometer (GC/MS). Field screening of oxygen and carbon dioxide is required to assure representative samples are collected.
Other field screening instruments may be used for other sampling objectives. The sample train will be fitted to a SUMMA canister for volatile organic compound (VOC) sample collection and to a silica gel cartridge for tritium sample collection.
3. REFERENCES
N3B-SOP-ER-2002, Field Decontamination of Equipment
N3B-SOP-SDM-1102, Sample Receiving and Shipping by the Sample Management Office
N3B-P1020-1, N3B Records Management
Effective Date: 3/4/19 Reference Page: 5 of 25
4. PRECAUTIONS AND LIMITATIONS
• This procedure is to be used in conjunction with an approved Environmental, Safety, and Health (ES&H) Plan or an Integrated Work Document (IWD).
• If both VOCs and tritium are sampled at a single sampling port, the order in which the tritium cartridge sample and the VOC SUMMA canister sample are collected must be consistent between each sampling period at a given monitoring site. See discussion in Attachment 1, Sampling Considerations.
• Properly documented field procedures must be followed to ensure wells and boreholes do not become damaged or contaminated during sampling activities.
• Ports should be labeled with metal tags, and any tags that are not stamped metal should be documented and replaced with metal tags.
• Because of the harsh conditions in the field, the plastic tubing of the sampling lines and vapor ports may degrade over time, depth tags on the tubing or ports may become unreadable, or plugs may be lost. Any unusual conditions of the sampling lines (tubing) or vapor ports must be documented in the field logbook and the information relayed to the subcontractor technical representative (STR). Repairs to these components should be undertaken according to the manufacturer’s specifications as soon as they are discovered.
• Field screening and monitoring equipment shall have factory calibration certification as prescribed in the equipment’s manufacturer’s manual. These certifications are required for Appendix F, Sampling/Analytical/Field Method regulatory guidance of Consent Order reports.
• Naturally occurring radon may be present on some of the sampling lines or vapor ports.
Radon can collect on the sampling lines or vapor ports because the plastic has a slightly negative static charge. The human body has a slight positive charge, and the hands may attract minute amounts of radon when they come in contact with the vapor ports or plastic tubing. Clapping the hands to eliminate any built-up static charge may alleviate this problem. Nitrile gloves should be worn for protection, and they may also alleviate the problem of static charge.
• Preparation of field screening equipment, packer systems, silica gel, and silica gel cartridges require preparation and maintenance activities described in this procedure prior to sampling;
be aware of these timelines prior to sampling.
• If a vehicle or generator is used to supply power to purge pumps, ensure that exhaust is directed away (downwind) from the borehole sampling operation to prevent contamination of samples.
• Special care should be taken during the installation of the silica gel cartridges into the sample train to minimize exposure to ambient air. When installed into the sampling train, the cartridge must be oriented so that air flow passes through the silica gel and then the filter, so that silica gel is not pulled out of the sample cartridge and into the pump.
Effective Date: 3/4/19 Reference Page: 6 of 25
4. PRECAUTIONS AND LIMITATIONS (continued)
• Silica gel water vapor collection efficiency is significantly reduced during hot weather. For sampling efficiencies during the warm spring/summer months, it is recommended that the silica gel cartridge connected to the sample train be placed in a cooler with ice during sampling to reduce the time required to collect 5 grams of water.
• Water vapor may condense and freeze in sampling lines during cold weather, restricting flow. Sample lines may be heated using a heat gun to re-vaporize condensed water and restore air flow.
• When collecting a SUMMA canister field blank from a gas cylinder of pure nitrogen, close the SUMMA canister valve and the nitrogen cylinder valve when the SUMMA pressure valve equals zero, to avoid over pressurizing the SUMMA canister.
• Packer systems can become contaminated when used in multiple boreholes. Precautions to prevent cross contamination should be identified prior to the sampling campaign. Different strategies can be taken: packers can be decontaminated between uses, packers can be assigned for use at only one borehole, etc.
• Clear handwriting of data in field collection logs and logbooks is essential to assure data quality.
• Any waste generated from sampling activities will be managed in accordance with an approved Waste Characterization Strategy Form (WCSF).
5. PREREQUISITE ACTIONS
5.1 Planning and Coordination
All N3B personnel, including subcontractors and students, performing the functions outlined in this procedure must be trained to this SOP and are required to complete any general, project and site specific requirements.
Effective Date: 3/4/19 Reference Page: 7 of 25
5.2 Special Tools and Equipment, Parts, and Supplies
ALL SAMPLING SYSTEMS
• Gas flow meter.
• Differential pressure gauge or manometer for measuring static subsurface pressure.
• Hand tools – adjustable wrench, screwdrivers, pliers, utility knife.
• Nitrile gloves for skin protection and minimizing contamination, in accordance with the approved ES&H plan or IWD.
• Teflon tubing that delivers pore gas from the vapor sampling port to the sample or field screening instruments/containers.
• Heat gun in cold weather to ensure the ports do not clog from freezing condensate
• Vacuum pump(s) capable of flow rates between 2 – 15 liters/min.
• Pure (99.99%) nitrogen gas for field blank samples.
• SUMMA canisters - The SUMMA canister captures and contains the air sample for transport to the analytical laboratory for analysis of VOCs.
• Field screening instruments such as a Lantec gas extraction meter or MultiRAE IR Multigas
Monitor for monitoring oxygen and carbon dioxide.
SAMPLING TRITIUM
• Sampling manifold if sampling from multiple ports simultaneously.
• Silica gel cartridges for tritium analysis. Cartridges must hold 135 grams of silica gel.
Cartridges must have end plugs, to isolate the silica gel before and after sampling.
• Digital scale capable of reading 1000 +/- 0.01 g.
• Silica gel, 6–12 mesh, 135 grams per sample.
• Laboratory oven capable of maintaining 110o C for 48 hours.
• 2 crucibles for each lot of silica gel to be tested for bound water percentage. Crucibles shall be able to hold 50 - 100 grams of silica gel.
• Laboratory grade oven capable of maintaining 1000o C for 2 hours.
• Tongs, gloves, eye protection for removing silica gel from oven.
• High-temp marker or etched markings to mark crucibles prior to denaturing silica gel
• 5 grams distilled water for each field blank sample.
• “T” connection for sampling train for collecting duplicate tritium sample.
EQUIPMENT AND TOOLS FOR PACKER SAMPLING SYSTEM
• Dedicated packers.
• Pulling rig or sampling tripod for lowering and raising packer systems into the borehole.
• Teflon tubing with an outer diameter of approximately one quarter inch. This tubing is attached at the surface to stainless steel tubing and fittings that must be air tight. Fittings along the stainless steel tubing that will accommodate attachments for the sample containers.
• Pure nitrogen gas (99.99%) for decontaminating re-usable sample tubing.
• Calibrated depth measuring device to ensure that packer is deployed at the correct depth.
Effective Date: 3/4/19 Reference Page: 8 of 25
6. SAMPLING SUBSURFACE VAPOR
6.1 Develop Field Data Collection Forms
NOTE Each sampling campaign includes different sampling equipment and different numbers of boreholes and ports to be sampled. Example forms for field data collection are provided in Attachments 2 to 4. Each sampling campaign should develop field data collection forms, containing the data specified in the attachments, appropriate to the specific sampling campaign. Sufficient space should be allowed on each data collection form to allow for legible handwriting.
Field Team Leader
[1] RECORD the time to purge the sample train prior to screening for CO2 on Attachment 4, Purge/Screening Using Landtec or MultiRAE IR Multigas Monitor, calculated as follows:
• For boreholes constructed using stainless steel sampling tubes in sand pack filters, the purge time is a minimum of 10 minutes.
• For open boreholes to be sampled using a down-hole packer, the sample train should be purged for either 10 minutes or the time required to purge the entire volume of the sample lines/port volumes, whichever is greater.
• For open boreholes, calculate the time required for purging one volume of sample line/borehole volume for each port to be sampled. The time to purge one volume is calculated as (the total volume of sample lines and port volumes)/pump flow rate.
• The volume of sample line is calculated as L * π * D2/4, where L is the sample line length to the sampling port, and D is the inner diameter of the sample line.
• If the borehole is open and sampling intervals are designated with inflatable packers, the volume of the borehole between the packers is added to the volume of the sample line, to obtain the entire volume that requires purging prior to screening. The volume of space between the packers is calculated as P * π * DB2/4, where P is the distance between the packers and DB is the diameter of the borehole.
Effective Date: 3/4/19 Reference Page: 9 of 25
6.2 Periodic Evaluation of Silica Gel Bound Water Percentage for Tritium Sampling
Field Team Member [1] TEST silica gel periodically to measure bound water percentage, as this value can change over time or with different manufacturers.
[2] TEST silica gel when procured from a new manufacturer.
[3] IF silica gel is purchased more than once per year, THEN TEST silica gel once every six months.
[4] IF silica gel is purchased less than once per year, THEN TEST silica gel when new silica gel is purchased.
NOTE Silica gel is purchased in containers of varying sizes. Newly procured silica gel containers are called “lots” in this procedure.
[5] SELECT a minimum of 2% of newly procured silica gel lots to be used in testing prior to its use in field sampling.
[6] DRY the silica gel in a drying oven at 110o C for at least 48 hours.
[7] DRY the silica gel in a tray or in the original metal can with the lid removed.
[8] PLACE the dried silica gel into a container that can be closed immediately after removal from the oven to minimize the exposure of silica gel to ambient air.
[9] ALLOW the silica gel to cool before proceeding to the next steps.
[10] WEIGH each crucible with lid while empty (CE).
[11] MARK each crucible with a number using a high-temp marker or etched markings.
[12] RECORD the weight of each crucible with lid on Attachment 2, Silica Gel Bound Water
Percentage Worksheet.
Effective Date: 3/4/19 Reference Page: 10 of 25
6.2 Periodic Evaluation of Silica Gel Bound Water Percentage for Tritium Sampling (continued)
[13] FILL 2 crucibles partially, using the dried silica gel selected for testing.
[14] WEIGH each setup of crucible, lid, and silica gel (CSGI) and RECORD the data on
Attachment 2.
[15] PLACE the crucibles in furnace and heat at 1000o C for two hours.
WARNING
Use tongs to remove crucibles from oven, and wear proper personal protective equipment (PPE), including gloves and eye protection. Stand back when opening the furnace.
[16] REMOVE crucibles after oven has cooled.
[17] WEIGH and RECORD final crucible + silica gel weight (CSGF) on Attachment 2 when crucibles are cool enough to handle.
[18] CALCULATE the percent moisture of silica gel from each crucible:
(CSGI - CSGF) x 100
CSGI – CE
[19] RECORD this value on Attachment 2 for each crucible of silica gel tested (e.g. 5.54%).
[20] CALCULATE the percent moisture value of the silica gel lot as the average of the individual crucibles tested.
[21] RECORD this value on Attachment 2 (e.g. 6.35%).
[22] RECORD this value in sampling logbooks and RETAIN this value with the lot of silica gel.
Effective Date: 3/4/19 Reference Page: 11 of 25
6.3 Preparation of Tritium Cartridges Prior to Field Deployment
Field Team Member [1] ENSURE that all materials and equipment that will come into contact with the silica gel are clean and dry before proceeding.
[2] DRY the silica gel to be used for field sampling in a drying oven at 110o C for at least 48 hours.
[A] DRY the silica gel in a tray or in the original metal can with the lid removed.
[B] PLACE the dried silica gel in a container and CLOSE the container after removal from the oven to minimize the exposure of silica gel to ambient air.
[C] ALLOW the silica gel to cool before proceeding to the next steps.
[3] RECORD the percent moisture value for the lot of silica gel in the logbook (see Section
6.2).
[4] CHECK the cartridge to assure that a filter is in place in one of the end caps and MARK the direction of sample air flow on the cartridge. (Sample air moves towards the filter.)
[5] WEIGH each empty cartridge with end plugs to the nearest 0.01 g and RECORD the weight of each cartridge in the logbook.
[6] ADD approximately 135 grams of silica gel to each canister and close both openings.
[7] WEIGH each cartridge containing silica gel to the nearest 0.01 g.
[8] RECORD the weight of the cartridge with silica gel in the logbook.
[9] CALCULATE the amount of dry silica gel added to the cartridge (this value is the weight of the cartridge containing silica gel minus the weight of the empty cartridge).
[10] RECORD the weight of the dry silica gel (which will be approximately 135 grams) in the logbook.
Effective Date: 3/4/19 Reference Page: 12 of 25
6.4 Preparation of Packer System Prior to Field Deployment
[1] IF re-usable sample lines are used with the packer systems, THEN DECONTAMINATE sample line prior to use.
[2] PURGE line with nitrogen for a minimum of three sample line volumes.
[3] IF re-usable packers are used, THEN DECONTAMINATE packers prior to use following N3B-SOP-ER-2002, Field
Decontamination of Equipment.
[4] TEST the inflatable packers and air line fittings for leaks before the packer system is sent down-hole.
6.5 Planning for QA/QC Samples
[1] COLLECT QA/QC samples at a frequency greater than or equal to 10% (1 for every 10 samples collected).
[2] COLLECT two (2) QA/QC samples for VOCs using SUMMA canisters: a field duplicate
(FD) sample, and a field blank of pure nitrogen (99.99%).
[3] COLLECT two (2) QA/QC samples for tritium: a FD sample and a field blank sample of distilled water.
Effective Date: 3/4/19 Reference Page: 13 of 25
6.6 Pre-Sampling Activities
Field Team Members [1] DOCUMENT, at a minimum, the following pre-sampling activities into the field logbook:
• Date, time, location
• Sample train inspection
• Current calibration of all instruments
• Port conditions
• Tubing problems/solutions
• Field screening instrumentation operational check
[2] REPLACE any handwritten port labels with metal tags and REPLACE any degraded metal tags.
[3] INSPECT all tubing, fittings, and valves on the sample train for degradation.
[4] INSPECT Swagelok fittings for degradation.
[5] TIGHTEN, as necessary, all fittings and valves that make up the assembly.
[6] ENSURE the power supply is functional.
6.7 Daily Field Operational Check of Screening Instruments
NOTE Screening instruments include Landtec Gas Extraction Meter, MultiRAE IR Multigas Monitor, etc.
[1] ENSURE that the monitor is charged before taken out in the field and that the external power supply is functional.
[2] PERFORM daily operational checks of field screening instrumentation according to manufacturer’s procedure. (Field screening is required for oxygen and carbon dioxide.)
[3] CHECK O2 and CO2 for Landtec or MultiRAE IR Multigas Monitor meter. (Oxygen values should be +/- 1% of 20.9%. Carbon dioxide should read 0 %.).
Effective Date: 3/4/19 Reference Page: 14 of 25
6.7 Daily Field Operational Check of Screening Instruments (continued)
[4] RECORD results on Attachment 3, Daily QA/QC Operational Checks for Landtec or
MultiRAE IR Multigas Monitor Instruments.
[5] IF readings are not within manufacturer’s specifications, THEN FOLLOW repair instructions or CONTACT the manufacturer.
6.8 Preparation and Installation of Packer Systems
[1] IF re-usable sample lines are used with the packer systems, THEN DECONTAMINATE sample line prior to each use.
[2] PURGE line with nitrogen for a minimum of 3 sample line volumes.
[3] TEST the inflatable packers and air line fittings for leaks before they are sent down-hole.
[4] ENSURE packer(s) are the appropriate diameter for the borehole.
[5] ENSURE the borehole is free of any irregularities (before the packer system is lowered into an open borehole), such as sloughing or the state wherein the borehole is curved due to incorrect auger tracking.
[6] DEPLOY the packer(s) to the desired depth using the appropriate equipment (pull rig or sampling tripod).
[7] POSITION the packer at the correct depth using a calibrated depth measurement device.
[8] INFLATE the packer to the desired inflation pressure according to the manufacturer’s specification.
NOTE If the pressure drops following inflation, it may indicate a packer-inflation leak.
[9] IF a packer-inflation leak is detected, THEN REMOVE the packer from the borehole and either FIX or REPLACE the leaking component prior to sampling.
Effective Date: 3/4/19 Reference Page: 15 of 25
6.9 Sampling Activities at a Borehole: Purging and Screening
NOTE Screening instruments include Landtec Gas Extraction Meter, MultiRAE IR Multigas
Monitor, etc.
[1] CONFIRM the borehole number and location and DOCUMENT on sample collection log and field logbook.
[2] OPEN borehole cover and DOCUMENT any finding that may impede sampling of the borehole.
[3] MEASURE the static pressure of the formation at the sample interval using the differential pressure gauge and DOCUMENT the static pressure of the formation at the sample interval on Attachment 4.
[4] CONNECT the purge pump to the top of the vapor port system using a length of TeflonTM tubing.
[5] PURGE the sample train for a minimum of 10 minutes or the time calculated in Section 6.1 with the purge pump to remove all stagnant air within the tubing and valves.
[6] DOCUMENT purge flow rate and start/stop times on Attachment 4.
[7] IF you suspect that the port is blocked, DISCONTINUE sampling at this port, DOCUMENT in logbook and sample collection log and CONTACT STR for further instructions at the time of this discovery.
[8] CONNECT the screening instrument to the vapor port and monitor CO2/O2 values.
NOTE When 2 consecutive readings of CO2 have changed by less than 10%, the values have stabilized and a representative sample can be collected.
[9] RECORD screening values of CO2 and O2 readings in 1 minute intervals on Attachment 4.
Effective Date: 3/4/19 Reference Page: 16 of 25
6.10 SUMMA Canister Sampling
[1] CONNECT pressure valve with the vacuum gauge to the vapor port.
[2] ENSURE all the valves are closed.
[3] ATTACH the SUMMA canister to the pressure valve.
[4] OPEN the valve on the SUMMA canister and check the vacuum gauge for proper vacuum.
[5] DOCUMENT the starting pressure on the sample collection log, and the date/time of sample collection.
[6] OPEN the pressure valve.
[7] CLOSE the valve on the canister when the gauge indicates the pressures in the canister and atmospheric pressure have equilibrated (i.e. reading on pressure gauge = 0 psig).
[8] DOCUMENT the final pressure on the sample collection log.
[9] COMPLETE the identification tag of the canister.
[10] DOCUMENT SUMMA canister sampling in the field logbook, in the sample collection log, and on the chain-of-custody forms.
[11] DISCONNECT pressure valve from vapor port.
[12] STORE the SUMMA canister in the shipping container and SHIP to the N3B Sample
Management Office (SMO) in accordance with N3B-SOP-SDM-1102, Sample Receiving and Shipping by the Sample Management Office.
Effective Date: 3/4/19 Reference Page: 17 of 25
6.11 Collect SUMMA Canister QA/QC Samples
[1] To collect the field duplicate sample, CONNECT a second SUMMA canister to the sample train immediately following the collection of the original sample.
[2] COMPLETE steps in Section 6.10, SUMMA Canister Sampling.
[3] To collect the field blank sample, CONNECT the regulator to the nitrogen tank, with the tank and regulator valves closed.
[4] CONNECT the sample train to the nitrogen tank regulator and OPEN the nitrogen tank valve.
[5] PURGE the sample train with nitrogen by slowly opening the regulator valve for a few seconds.
[6] CLOSE the regulator valve.
[7] ATTACH SUMMA canister to the pressure valve and to the sample train and CLOSE all valves on sample train.
[8] OPEN valve on SUMMA canister and DOCUMENT the starting pressure and the date/time of sample collection on the sample collection log.
[9] OPEN the valve on the sample train leading to the nitrogen tank.
[10] OPEN the regulator valve on the nitrogen tank slightly, allowing nitrogen to flow through sample train into the SUMMA canister until SUMMA pressure is zero.
[11] RECORD the final pressure on the sample collection log.
[12] CLOSE the SUMMA valve and the regulator valve when SUMMA canister pressure valve equals zero. (Do not over pressurize the SUMMA canister.)
[13] OPEN the regulator valve slowly to release any gas remaining in the regulator.
[14] STORE the SUMMA canister in the shipping container and SHIP to the N3B SMO in accordance with N3B-SOP-SDM-1102, Sample Receiving and Shipping by the Sample Management Office.
Effective Date: 3/4/19 Reference Page: 18 of 25
6.12 Tritium Sampling
NOTE Tritium samples are only collected after the system has been purged with a field screening instrument. Tritium sampling may take several hours.
[1] CONNECT the tritium cartridge to the purge fittings of the sample manifold and ORIENT the cartridge so the filtered end cap is on the pump side of the sample train.
[2] ACTIVATE pump(s) to pull subsurface pore gas through the tritium cartridge.
[3] Periodically DISCONNECT the tritium cartridge from the sample train, INSTALL both end plugs, and WEIGH cartridge.
NOTE The sample is complete when the weight of the cartridge has increased by at least 5 g above the original cartridge weight determined in Section 6.3.
[4] IF the weight has not increased by at least 5 g, THEN RE-INSTALL the cartridge in the sample train and CONTINUE pulling pore gas through the sample cartridge until the weight of the cartridge has increased by at least 5 g.
[5] RECORD the final weight of the cartridge and SAMPLE to the nearest 0.01 g.
[6] REMOVE cartridge quickly and SEAL the ends.
[7] DOCUMENT the tritium cartridge sample in the field logbook and in the sample collection log and the chain-of-custody forms.
[8] RECORD the following on the sample collection log:
• Initial weight of dry silica gel used in the sample
• The weight of the cartridge plus dry silica gel before sampling
• The weight of the silica gel cartridge and silica gel after sampling
[9] RECORD the silica gel bound water percentage for this lot of silica gel (from the field logbook or Attachment 2) on the sample collection log or chain-of custody form.
[10] SUBMIT samples to the N3B SMO in accordance with N3B-SOP-SDM-1102, Sample
Receiving and Shipping by the Sample Management Office.
Effective Date: 3/4/19 Reference Page: 19 of 25
6.13 Collect Tritium QA/QC Samples
[1] To collect field duplicate samples, CONNECT a second tritium cartridge to the sample train using a “T” connection into the two columns, so that air is pulled through both samples simultaneously.
[2] FOLLOW steps in Section 6.12 for sample collection, data recording, and submission.
[3] To collect a field blank sample, ADD 5 grams of distilled water to a tritium cartridge.
[4] ADD end plugs to the cartridge and WEIGH the cartridge with silica gel and distilled water.
6.14 Complete Sampling through the Packer System
[1] DEFLATE the packer(s) before pulling them out of the borehole and PULL the packers.
[2] CLOSE borehole.
[3] DISPOSE of any tubing that is visibly damaged or contaminated.
[4] DOCUMENT date/time of completion of packer system removal in field logbook and
NOTE any abnormal condition of the packer system.
6.15 Post-sampling Activities
[1] ENSURE that the packer system is contaminant-free by scanning it with field screening instruments following sampling to prevent cross-contamination from other boreholes.
[2] Alternately, DECONTAMINATE sampling equipment following N3B-SOP-ER-2002 and
DOCUMENT results in sample logbook.
Effective Date: 3/4/19 Reference Page: 20 of 25
7. RECORDS PROCESSING
[1] ENSURE that documents generated by the performance of this procedure are processed as follows:
Record Identification Record Type Determination
Protection/Storage Methods
Processing Instructions
Completed chain-of-custody/request for analysis forms
Closed-out field logbooks
Attachments from this procedure
Completed sample collection logs
QA Record Supervision SHALL implement a reasonable level of protection to prevent loss and degradation. Records SHALL be maintained in a metal file cabinet when not in use.
When the records are ready for final disposition, the record is transferred to Records Management in accordance with N3B-P1020-1, N3B Records Management.
8. ATTACHMENTS
Attachment 1, Sampling Considerations Attachment 2, Silica Gel Bound Water Percentage Worksheet Attachment 3, Daily QA/QC Operational Checks for Landtec or MultiRAE IR Multigas
Monitor Instruments Attachment 4, Purge/Screening Using Landtec or MultiRAE IR Multigas Monitor
Effective Date: 3/4/19 Reference Page: 21 of 25
ATTACHMENT 1
Sampling Considerations
General
There is not one standard method for collecting subsurface vapor contaminants, due to the lack of equilibrium in subsurface contaminant vapor plumes and due to the variability of vadose zone geology from site to site. The lack of equilibrium in subsurface contaminant vapor plumes is a function of the source of vapor phase contaminants, methods of disposal, rate of degradation in the soil, and the time since disposal.
The ASTM standard recommends that sampling in a consistent manner, from time period to time period, is of greatest importance to obtain a credible data set over time. This procedure calls for the consistent use of sampling equipment and methods from time period to time period, but does not require that each site use the exact same methods due to the variability in site geology and the variability in contaminant vapor plumes from site to site.
Each site (primarily Material Disposal Areas at Los Alamos National Laboratory) is governed by an individual sampling plan approved by the NMED. And so, there is variability from site to site in sampling requirements (frequencies, depths, VOCs, tritium, etc.). The NMED approved sampling plan will specify the locations, port depths, and contaminants to be monitored. This procedure covers all aspects of subsurface vapor monitoring, to implement the NMED approved sampling plan.
Sample Pump Flow Rates
Consistent use of pumps for sample line/borehole purging and sampling tritium is required. A minimum sample pump flow rate is 300 ml/min. Typical sample pump flow rates are 3-15 liters/minute due to the variability of port depths to be sampled and the porosity of the vadose zone soils at Los Alamos.
Sampling VOCs and Tritium
The order of sample collection for VOC SUMMA canisters and tritium cartridges for a given site must be the same from one sampling period to the next. In all cases, the sample lines/borehole volumes are purged and then screening sampling is done prior to the collection of a VOC SUMMA canister sample or a tritium sample.
Effective Date: 3/4/19 Reference Page: 22 of 25
ATTACHMENT 1
Sampling Considerations
At locations where there are higher concentrations of VOCs in subsurface vapor plumes (e.g.
MDA L), it is recommended that VOC SUMMA canisters samples are collected before tritium samples, following the purge of the sample line/borehole volumes and documentation/verification of stabilized subsurface air measurements. This order of sampling (VOCs first, then tritium) reduces the chance of impacting the equilibrium concentration of VOCs collected by the SUMMA canister that might happen following a long sampling period required (12+ hours) for collecting the tritium sample.
At locations with lower concentrations of VOCs in subsurface vapor plumes (e.g. MDA T), the tritium sample can be collected before or after the VOC SUMMA canister sample. Whichever sample is collected first (VOC or tritium), this same order of sampling must be followed each time at that particular site.
Screening for Identifying Sample Representativeness
Following purging of the sample lines/borehole, screening is required to demonstrate a representative sample of the vapor contaminant plume is being collected, as opposed to atmospheric air. Typically, solvent contaminant plumes include carbon dioxide produced as a byproduct of bacteria breaking down solvents. The goal of screening is to identify when carbon dioxide concentrations representative of the contaminant plume are identified rather than carbon dioxide naturally occurring in atmospheric air.
The carbon dioxide screening measurement becomes more complicated at sites where boreholes are in direct connection with the atmosphere (basalt, near the edge of a mesa, etc.) or where there is a low level of organic material. In these cases, the subsurface vapor sampling may pull in atmospheric air from adjacent canyons, or there may be very little CO2 produced by degradation of organics. Screening sampling instruments must be able to differentiate between subsurface air and ambient air. For sampling at these more challenging sites, a more CO2 sensitive screening instrument is required. A MultiRAE IR Multigas Monitor is recommended.
Reference Procedures for Sampling Subsurface Air
ASTM D5314-92(2006), Standard Guide for Soil Gas Monitoring in the Vadose Zone (Withdrawn 2015), ASTM International, West Conshohocken, PA, 2006.
Reference Page: 23 of 25
ATTACHMENT 2
Silica Gel Bound Water Percentage Worksheet
Date of Silica Gel Bound Water Percentage Tests: _________________________ Sampler: _______________________
Dates of use of average silica gel bound water percentage (typically 6 months): ____________________ Reviewed by: ____________________
Sampling locations of use of average silica gel bound water percentage: _______________________ Review date: ____________________
Crucible number
Silica gel can number
Position of gel in can (relative to top, e.g. 1/3 down)
Weight of empty crucible plus lid, grams
(CE)
Initial weight of silica gel plus crucible plus lid, grams (CSGI)
Final weight of silica gel plus crucible plus lid (after denaturing), grams (CSGF)
Calculated silica gel bound water percentage:
(CSGI - CSGF) x 100
CSGI – CE
Comments
Average of all crucible silica gel bound water percentages for the batch of silica gel cans
Effective Date: 3/4/19 Reference Page: 24 of 25
ATTACHMENT 3
Daily QA/QC Operational Checks for Landtec or MultiRAE IR Multigas Monitor Instruments
Sampling Date_________ Landtec Instrument Name/Number____________________ Sampler_______________________
Instrument is checked against ambient air Reviewed by: _____________________ Date_________
Standard Time Reading 1 Reading 2 Reading 3 Expected Value Calibration Verified?
CH4 0%
CO2 0%
O2 20.9% +/- 1%
Effective Date: 3/4/19 Reference Page: 25 of 25
ATTACHMENT 4
Purge/Screening Using Landtec or MultiRAE IR Multigas Monitor
Borehole number: _________________ Landtec No: ____________ Sampler: ______________________
Sampling Date: ___________ Static Pressure of Port: _____________________ Reviewed by: ___________________ Date: _____________
Purge Flow Rate: ______________________ Time required to purge sample train at nominal flow rate (Section 4.1, Step 1): __________________
Purge Start time: __________________ Purge Complete Time: ________________________
Depth (ft)
Date Screening Time
CH4 % CO2 % O2 %
| 1. Purpose |
| 2. Scope |
| 3. References |
| 4. Precautions and Limitations |
| 5. Prerequisite Actions |
| 5.1 Planning and Coordination |
| 5.2 Special Tools and Equipment, Parts, and Supplies |
| 6. Sampling Subsurface Vapor |
| 6.1 Develop Field Data Collection Forms |
| 6.2 Periodic Evaluation of Silica Gel Bound Water Percentage for Tritium Sampling |
| 6.3 Preparation of Tritium Cartridges Prior to Field Deployment |
| 6.4 Preparation of Packer System Prior to Field Deployment |
| 6.5 Planning for QA/QC Samples |
| 6.6 Pre-Sampling Activities |
| 6.7 Daily Field Operational Check of Screening Instruments |
| 6.8 Preparation and Installation of Packer Systems |
| 6.9 Sampling Activities at a Borehole: Purging and Screening |
| 6.10 SUMMA Canister Sampling |
| 6.11 Collect SUMMA Canister QA/QC Samples |
| 6.12 Tritium Sampling |
| 6.13 Collect Tritium QA/QC Samples |
| 6.14 Complete Sampling through the Packer System |
| 6.15 Post-sampling Activities |
| 7. Records Processing |
| 8. Attachments |
File details come from the government source that posted it.